混凝土隔板 的英文怎麼說
中文拼音 [húnníngtǔgébǎn]
混凝土隔板
英文
concrete diaphragm- 混 : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
- 凝 : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
- 隔 : partitionseparate
- 板 : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
- 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
- 隔板 : [機械工程] bulkhead; division plate; baffle plate; barricade; distance plate; dummy plate; inner ...
-
In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure
針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機座與底板整體澆注、採用先進計算理論指導配筋。The study was focused on the deformation of the retaining wall and the internal forces in the reinforcements and the object of study included the effects of the vertical excitation, the reinforcement length, the reinforcement spacing, the weight of the facing blocks, the frictions between soil and facing blocks as well as those between two facing blocks
研究內容包括豎向地震影響、加筋長度、加筋層間隔、面板預制混凝土塊重量、面板與填土界面摩擦角、預制混凝土塊之間摩擦角等對加筋土擋墻變形、加筋層內力等的影響。Concrete hollow panels contained industrial fly ash and waste slags for partition wall in buildings
工業灰渣混凝土空心隔墻條板Internal and partition concrete panel in residence
住宅混凝土內墻板與隔墻板Internal and partition concrete panel in
住宅混凝土內墻板與隔墻板Hollow light partition of aerated concrete with silica and magnesium
硅鎂加氣混凝土空心輕質隔墻板The curve of arch rib, rib section bending, splice of rib sections, seperator of tube, bracing plates, bracing system, meeting of arch, concrete pumping, hangers, tie - rods, the tower of the cable crane and the guy ropes, technical specifications of cfst arch bridge are discussed
對鋼管混凝土拱橋的拱軸線選用、鋼管節段彎制、節段拼接、管內分隔倉、綴板設計、聯結繫系統、合龍設計及其細節、管內混凝土的泵送、吊桿、系桿、纜索吊機與扣索塔架、技術規范等12個問題進行了探討。Standard test methods for water vapor retarders used in contact with earth under concrete slabs, on walls, or as ground cover
混凝土板墻或土壤覆層的與地面接觸的水氣隔層的標準試驗方法As the concrete members are vibrated from 12 to 72 hours, the difference of its strength between vibration members and normal ones is not obvious. the interface of post - casting section is both the most dangerous position of the structure and focal point of quality control. in addition, the leaking of cement paste out of the formwork of vibration member is of no permission
試驗表明振動持續時間從12小時到72小時的變化,對混凝土強度沒有明顯差別;濕接頭的界面是最薄弱部位是施工質量控制的重點,振動構件模板應做到務必不漏漿;當振動幅值較大,必須採取隔振、減振措施。The seams divide the wall into several units and the hollow shear wall of r. c w ith vertical seams has small self - weight, small stiffness and good ductility. due to having air insulation, it has good energy saving capability. so this new type shear wall structure will be a kind of ductile structure with advanced seismic behavior
針對傳統剪力墻結構的弱點,本課題提出帶豎縫鋼筋混凝土空心剪力墻板結構,此種墻板在墻體上設有豎向縫隙,將整塊墻板分成若干墻肢單元,具有自重輕、剛度小、延性大的特點,由於墻板中間有空氣夾層,保溫、隔熱效果也較好,以此種墻板為主體的空心剪力墻結構體系是一種抗震性能優良的「延性剪力墻結構」 。1. after a series of comprehensive testing and structure analysis to various bridges on the guangshe, huning, jinqin, shenshan, jingguang. ln our opinion, the key problems of the railroad bridge are as follows : ( 1 ) bridge construction is not well at the request of the railroad train speed - lift, primarily because of low dynamic property of the horizontal frame ; ( 2 ) the bad liability of the bridges structure, concrete beam ' s horizontal plank coupling form ; the low capacity of some of the bridges
在對廣深、滬寧、京秦、沈山、京廣干線上不同橋梁結構進行的一系列綜合試驗的結果分析后認為,我國鐵路橋梁目前存在的主要問題為:橋梁結構不適應列車提速的要求,主要反映為結構橫向的動力性能較差;橋梁結構的耐久性問題;混凝土梁的橫隔板聯結方式;部分橋梁承載能力不足。According to the results of theory and experimental researches in this paper, the design provisions in the " technical code for concrete - filled square tubular structure " ( draft ) are discussed. the load - carrying capacity formulations for end section of beam to at the column - beam connections are proposed
根據本文的試驗和理論研究結果,對( (矩形鋼管混凝土結構技術規程》 (送審稿)帶內隔板的梁一柱栓焊連接節點設計內容進行了評析,提出了構造建議,並給出了樑柱連接處梁截面的抗彎、剪計算公式。Secondly author calculates and analyses normal stress and shear stress of the girder for a assembling post - tensioned concrete skew girder bridge with a span of 40 m due to the actions of the dead load, temperature changes, shrinkage and creep of concrete and live loads, and calculates and analyses normal stress and shear stress of diaphragms due to the actions of the subordinate phase dead load, temperature changes, shrinkage and creep of concrete and live loads
其次重點對跨徑為40m標準設計的裝配式后張預應力混凝土斜梁橋在恆載、溫度變化、混凝土收縮和徐變、活載作用下主梁的正應力、豎向變形和恆載、活載作用下主梁的剪應力進行計算分析。計算分析橫隔板在二期恆載、溫度變化、混凝土收縮、活載作用下的正應力、剪應力。A quasi - static experiment under low reversed cyclic load of three full - size cross - shaped specimens ( two specimens ' columns are steel tubes filled with concrete and another is an empty steel tube ) of diaphragm - through style beam - column joints is designed and conducted
摘要設計了低周反復荷載作用下3個十字形足尺隔板貫通式樑柱節點試件(其中2個節點的柱子澆築了混凝土, 1個為空鋼管)的擬靜力試驗。分享友人