清水面混凝土 的英文怎麼說

中文拼音 [qīngshuǐmiànhúnníng]
清水面混凝土 英文
as-cast-finish concrete
  • : Ⅰ形容詞1 (純凈) unmixed; clear 2 (寂靜) quiet 3 (清楚) distinct; clarified 4 (一點不留) w...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 水面 : the surface of the water; table水面操縱 surface manoeuvering; 水面導航 surface navigation; 水面發...
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. The construction techniques for as - cast - finish concrete wall of units no. 15 - no. 18 in right bank powerhouse of three - gorges project was introduced, including measurement mark testing, sheathing board construction, steel bar construction, concrete pouring, and so on

    摘要從測量標識測設、模板施工、鋼筋施工、澆築等幾個方介紹了三峽右岸電站廠房15 ~ 18號機組主廠房墻體墻施工技術。
  2. By adoption of a series of construction techniques, such as doka sheathing board pasted with finland board, affixing double - sided gum at the bottom of the sheathing board, controlling depot exterior with angle steel, and mending fissures with epoxy resin putty, the quality of as - cast - finish concrete can meet the requirement of construction anti good technical effect can be achieved

    通過採取多卡模板外貼芬蘭板、模板底口粘貼雙膠、角鋼控制收倉、環氧樹脂膩子補縫等一系列的施工技術工藝,使墻施工達到預期質量要求和工藝效果,滿足了設計要求。
  3. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;華大學電工程系濮家騮、于玉貞根據三軸試驗結果確定的參數,利用非線性e - b模型,結合黃河小浪底石壩設計剖,採用thepd石壩總應力程序,對深覆蓋層塑性防滲墻的應力、位移進行有限元分析,並與普通防滲墻計算結果加以對比,同時分析了不同配比塑性特性的影響,並採用應力平和拉應力數值來判斷塑性防滲墻的安全程度。
  4. This article compared two concrete architecture : luyeyuan stone sculpture art museum and baumschulenweg crematorium, the author discussed the difference between them on concept, space, and construction

    摘要以鹿野苑石刻博物館與鮑姆舒倫韋格火葬場兩個建築為對象,比較了兩者概念、空間、建造等方的異同,並展開了探討。
  5. Meanwhile, owing to its features such as high cost for maintenance, severe traffic interference during maintenance, and difficulty in maintenance of what is damaged, it is a problem deserving immediate solution in present - day projects to know the fissure mechanism and breaking process of the cement concrete and improve its anti - fissure performance

    同時,的維修成本高,養生時間長,維修期間交通干擾嚴重,一旦破壞就很難修復。因而,認的開裂機理和破壞過程,提高其抗裂性能,是當今工程界迫切需要解決的問題。
  6. The smooth surface of the phenolic glue film faced plywood can smoothen the concerte ' s face, especially for the concrete construction with clean water

    粉醛覆膜膠合板表光滑,能夠製作平滑的,特別適合現澆工程施工,使用后表極佳。
分享友人