測流水槽 的英文怎麼說
中文拼音 [cèliúshuǐcáo]
測流水槽
英文
control flume- 測 : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
- 流 : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 槽 : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
- 水槽 : water channel; trough; pentrough; mantle; water slide (運木材用); cistern; scoop channel; gulle...
-
The flumes are used extensively to measure watershed turnoff.
水槽廣泛用於測量集水區的經流流量。These meters find wide use in open channel measurement and are usually a type of weir or flume.
這些流量計在明渠測量中得到廣泛地應用,通常是以水槽或堰的形式出現。Through the study above, a refined description and modeling to flow field and water surface near the groyne in river is conducted with 2 - d and 3 - d mathematical models. the results by simulation are consistent well with experiment data
通過上述研究,作者採用二維和三維數學模型對水槽試驗和天然河道中丁壩附近流場和水面形態進行了精細地描述和模擬,計算結果和實測結果吻合良好。Observed tidal harmonic constants in many stations are used to verify the astronomical tides in the compound fluid model. the wave model is tested by a set of wave flume data at first. then the results are compared by the actual processes of significant wave height in gauging stations
其中復合流場模型中的天文潮利用眾多測站的實測調和常數進行驗證;波浪模型首先進行了水槽實驗的檢驗,然後在臺風過程中,進行了測站有效波高過程線的比較。Estimation the turbulent dissipation rate in a horizontal rectangular duct by large eddy piv method
方法測量水平矩形槽道內湍流耗散率The flume experiment with single spur dike is carried out. water surface profile and velocity field of flow in flume are measured by manometer tube and propeller current meter respectively
首先進行了單丁壩水槽實驗,採用測壓管和旋漿流速儀對實驗水槽中水流的水位以及流速場進行了詳細的測量。The flow - measuring system adopts the khafagi flume as the first sense organ to realize the flow / head signal conversion. the head signal is picked up and converted into voltage signal by the buoy - level mechanism and the magnet - resistant angle measuring sensor
該流量測量系統採用卡發基水槽作為一次敏感器件實現了流量水位的信號轉換,並通過浮子?杠桿測量機構和磁阻式角度傳感器對水位信號進行拾取並轉化為電壓信號輸出。For example, when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s, the actual flow quantity is 23. 8m3 / s on the 30th of september in 1989, the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4. 3m, and the level between downstream and shang tian yuan tunnel was generally higher. it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value. this not only make the benefit of the irrigation district abnormal, but also greatly hinder the economic development of the irrigation district, and lead to the canal run frequently at small flow, high water level, lengthen the discharge duration
如東一乾渠上段太平橋以上設計流量45m ~ 3 s , 1989年9月30日實測通水流量23 . 8m ~ 3 s時,東一乾渠郝灣渡槽出口漸變段末端水位已達到設計水位4 . 3m ,其下游至上天院隧洞水位也普遍偏高,即東一乾渠上段目前僅能通過流量24m ~ 3 s左右,只有設計值的50左右,不僅使灌區效益得不到正常發揮,嚴重阻礙了灌區范圍內的經濟發展,而且使渠道經常處于小流量、高水位運行,延長了次通水時間,大大增加了渠道工程的安全管理難度。It is a reliable instrument for the measurement of the coherent structure in turbulence. an improved 2 - d ptv was developed based on previous research experiences, which can be used to measure the trajectories of particles motion. for the experimental study on the particle motion in the dilute solid - liquid two - phase flow, especially for the motion characteristics and dynamic characteristics of coarse particles in water, this kind of system was proved to have great advantages
利用該系統可獲取大量的統計樣本並進行計算機快速分析,為明槽紊流相干結構的試驗研究提供了一種嶄新的測量手段;在前人工作的基礎上,開發了一種能夠測量水流中顆粒運動軌跡的ptv系統,該系統具有可靠的精度,能同步測量全剖面的顆粒瞬時運動信息,為顆粒運動特性及動力學特性的試驗研究提供了強有力的手段。Standards for municipal wastewater discharge measurement. parshall flume
城市排水流量堰槽測量標準.巴歇爾量水槽Standard test method for open - channel flow measurement of water with palmer - bowlus flumes
Palmer - bowlus量水槽測量水的明渠流量的標準試驗方法By analyzing existing flow measurement methods, several economic methods which are suitable to online meter and measure flow in the plain irrigation are chosen
本文通過分析現有的流量測量方案,選擇用閘門、泵站、量水槽作為量水設施,並分析了這幾種測流方法的流量計算原理。In this paper, the spatial structure of the low - speed streaks and particle motion in the near wall region of turbulent open channel flow were observed on the side and bottom of a water flume, respectively, using flow visualization and image processing techniques
本文以試驗研究為主要手段,採用流動顯示和圖像處理技術,從水槽底部和側面兩個方向測量,分別對明槽紊流近壁區的帶狀結構及顆粒運動特性進行了系統的試驗研究。Aiming at the change of the traditional sediment measurement method, a new equipment, called infrared back - scattering sediment instrument, is introduced, it can measure the real - time sediment content continuously
為改進環形水槽的傳統測沙技術,自主研發完全開放式的實時在線測沙儀器,力求在水槽中實驗水樣的自然流態下實時測量垂線懸浮泥沙含量。Liquid flow measurement in open channels. parshall and saniiri flumes
明渠液體流量的測量. parshall and saniiri水槽Liquid flow measurement in open channels. rectangular, trapezoidal and u - shaped flumes
明渠液體流量的測量.矩形梯形和u形水槽Liquid flow measurement in open channels by weirs and flumes. triangular profile weirs
用溢流堰和水槽法測量明渠中的液體流量.三角形堰Measurement of flow of waste water in open channels and gravity conduits ; venturi flumes
明渠和重力管道中廢水流量的測量.文丘里氏水槽First, this paper, taking on temperature, height, flux, pressure of liquid as research object, deals with an arithmetic of nonlinear control system in complex production system. based on practical object model, it has finished algorithmic emulator
本論文以水槽的溫度、液位、流量、壓力四個參數作為控制對象,探討了工業過程式控制制中非線性復雜系統的預測控制演算法的應用,並且依賴于實際對象模型作出了程序實現。Based on the measured data of the north - trough and south - trough in the yangtze river estuary, the vertical distribution of the suspended sediment concentration in the yangtze river estuary is simulated by using a one dimensional numerical model of the suspended sediment, and the friction velocity and close - to - bed suspended sediment concentration are briefly analyzed
摘要根據長江口北槽和南槽實測的水沙資料,利用垂向一維懸沙數學模型模擬了長江口懸沙含量及其分佈,並對摩阻流速和臨底懸沙含量進行了簡要分析。分享友人