港珠澳大 的英文怎麼說

中文拼音 [gǎngzhūào]
港珠澳大 英文
hong kong-zhuhai-macau bridge
  • : 名詞1. (港灣) harbour; port 2. (江河的支流) stream3. (指香港) short for xianggang [hong kong]
  • : 名詞1. (珠子) pearl 2. (小的球形物) bead
  • : 1 (海邊彎曲可以停船的地方 多用於地名) an inlet of the sea; bay (often used in place names) 2 ...
  1. Wwf hong kong s position paper on the hong kong lantau - zhuhai - macau bridge

    世界自然基金會有關港珠澳大橋的立場聲明
  2. Wwf hong kong s position paper on the hong kong lantau - zhuhai - macau bridge 22 august 2003

    世界自然基金會有關港珠澳大橋的立場聲明
  3. The entire hzmb is a 35km dual 3 - lane carriageway in the form of bridge - cum - tunnel structure comprising the 29km zhujiang section from the landing point at gongbei of zhuhai and a prola of macao to the boundary of the hksar, and the 6km hong kong section from the boundary of hksar to the landing point at san shek wan of lantau island. the project includes

    整條港珠澳大橋分為江和香兩段,江段長約29公里,從位於海拱北和門明橋陸點至香特別行政區區界,而長約6公里的香段則由香特區區界至位於香嶼山石灣的香側陸點,工程范圍包括: -
  4. The landing point for the hong kong - zhuhai - macao bridge will be on northwest lantau

    港珠澳大橋的香陸點也會在這島嶼的西北面。
  5. Internally, the office is responsible for the investigation, planning, design and implementation of the approach transport infrastructure for the hzmb

    對內方面,香工程管理處負責港珠澳大橋接駁運輸基建的勘察規劃設計和實施工作。
  6. Hong kong zhuhai macao bridge north lantau highway connection

    港珠澳大橋北嶼山公路連接路
  7. Hong kong zhuhai macao bridge updated

    港珠澳大橋更新
  8. Hong kong - zhuhai - macao bridge

    港珠澳大
  9. Hong kong zhuhai macao bridge

    港珠澳大
  10. Hong kong - zhuhai - macao bridge - conceptual design and advance technical studies

    港珠澳大橋概念設計及進一步技術研究
  11. Supplementary information on the three categories of alignment options for the hzmb

    有關港珠澳大橋3類走線方案的補充資料。
  12. " members welcome the bridge project which will reduce the travelling time from hong kong to macao and zhuhai to within half an hour

    委員歡迎建造港珠澳大橋;工程將縮短香門以至海的行車時間至半小時之內。
  13. Vehicular flow projection of hzmb and its traffic impact on the existing road network

    港珠澳大橋行車量預測及其對現有道路網的交通影響。
  14. Introduction : on january 22nd, the preparatory coordination office of the hong kong, zhuhai and macau bridge and zhuhai municipal priority projects office held a joint mobilizing conference on the geological survey for the supplementary project of the main part construction of the hong kong, zhuhai and macau bridge offshore tunnels, marking an official launching of the geological survey for the core parts of the hong kong, zhuhai and macau bridge

    22日港珠澳大橋前期協調辦公室、海市重項目辦聯合召開港珠澳大橋海中橋隧主體工程補充工程地質勘察開工動員會,正式啟動港珠澳大橋核心部分的地質條件勘察工作。
  15. The 4th meeting of the hkzm bridge advance work co - ordination group in guangzhou ( 17. 12. 2004 )

    港珠澳大橋前期工作協調小組第四次會議( 17
  16. Supplementary information on the progress of the advance work for the hzmb and the nlhc

    有關港珠澳大橋及北嶼山公路連接路前期工作進展的補充資料。
  17. Having confirmed the need and urgency for the hong kong - zhuhai - macao bridge, a co - ordination group with representatives from the three governments has begun advance work for the project

    興建港珠澳大橋的必要性和迫切性得到肯定后,由三地代表組成的協調小組已展開前期工作。
  18. The panel noted that the hong kong - zhuhai - macao bridge advance work co - ordination group had commissioned the china highway planning and design institute to conduct a feasibility study for hzmb

    事務委員會察悉,港珠澳大橋前期工作協調小組已委聘中交公路規劃設計院進行港珠澳大橋的可行性研究。
  19. " to build the bridge linking hong kong, macau and zhuhai, it would be wiser to introduce private investment rather than draw on the fiscal reserves. be it selling old infrastructural facilities to provide capital for the new bridge or letting private corporations participate directly in the project, this strategy can steer private capital into the government s attempt to revitalize the economy. " (

    興建港珠澳大橋,下策為動用財政儲備,上策則為引入私人投資,無論是沽舊基建以建新橋,還是直接由私人機構參建,都可發揮借力打力,推動經濟的作用。
  20. On 4. 8. 03, the state council approved the report of the study and agreed that the governments of guangdong, hong kong and macau should set up a hong kong - zhuhai - macau bridge advance work coordination group and press ahead with the advance work for the construction of the bridge

    在2003年8月4日,國務院批準了有關研究的報告,並同意粵三地政府應成立港珠澳大橋前期工作協調小組,全面開展有關橋建設方案的前期工作。