漏直流電壓 的英文怎麼說

中文拼音 [lóuzhíliúdiàn]
漏直流電壓 英文
drain d c voltage
  • : Ⅰ動詞1 (從孔或縫中滴下、透出或掉出) leak; drip 2 (泄漏) divulge; disclose; leak 3 (遺漏) le...
  • : Ⅰ形容詞1 (成直線的; 硬挺的) straight; stiff 2 (跟地面垂直的; 從上到下的; 從前到后的) erect; v...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 壓構詞成分。
  • 直流 : direct current (dc); constant current; steady current; continuous current; zero frequency curre...
  • 電壓 : voltage; electric tension; electric voltage
  1. Energy consume, electric strength, insulation resistance, ground conductivity, leakage current, microwave leakage, power input, normal temperature, humidity treatment, glow wire, horizontal flame, vertical flame, tracking, ball pressure, rainproof, water splash, dustproof, salt fog, endurance, motor load test, cord flexing, cord pulling, pull & torque test, lamp replacement, construction check etc

    能耗、氣強度、絕緣阻、接地連續性、泄、微波泄、功率、溫升、濕熱試驗、灼熱絲、水平燃燒、垂燃燒、起痕、球試驗、防雨淋、防濺水、粉塵、鹽霧、耐久性(壽命)試驗、機負載試驗、源線彎折、源線提拉、拉扭力測試、燈頭互換性、安全結構檢查等。
  2. Study of principle of selective leakage protection of zero sequence dc of low - voltage power network underground and its implementation

    礦井低網零序選擇性保護原理的研究及實現
  3. In gan hemt drain pulse current collapse experiments, drain current under pulse condition collapsed about 50 % than direct current condition and the pulse signal frequency affected little on current collapse. when gate voltage is small, the relationship between pulse width and drain current is i0 ( + t / 16 )

    在ganhemt極脈沖崩塌測試中,發現脈沖條件下時減小大約50 % ;脈沖信號頻率對崩塌效應影響較小;當柵較小時,隨著脈沖寬度的改變按i0 ( + t / 16 )的規律變化。
  4. According to the academic analysis of insulation, this paper expatiates the examination ways of electric power insulates, such as shaking - watch, the direct current withstand voltage and measure leakage current, alternating current withstand voltage, measure dielectric loss angle, on - line inspections etc., to be used to direct the installations and debugging of electrical engineering

    通過絕緣介質的理論分析,闡述了氣設備絕緣檢查通常的搖表檢查,的測量,交工頻耐,介質損失角的測量,在線檢測等方法,以用來指導氣工程施工的安裝和調試。
  5. ( 2 ) each state of the total switching period has been studied in detail, in which the voltage of block capacitor and current of leakage inductance of main transformer and keeping time of each state have been discussed, then the condition of zero voltage switching is attained, which gives theory guidance for setting reasonable dead time, finally, the possibility of zero voltage switching is proved by simulation of saber software

    ( 2 )對不對稱半橋在一個完整的開關周期內各個狀態分析,描述了隔和變的變化規律,各個狀態的持,然後得出實現zvs的條件,從而為設置合理的死區時間提供了理論指導,最後用saber軟體進行了模擬,驗證了零開關實現的可能性。
分享友人