  1. This paper demonstrates ultimate stress increment of unbonded tendons can be composed of approximate elastic deformation along the elements and local plastic deformation by nonlinear analysis on the unbonded partially prestressed concrete continuous structures. referring to the rule of ultimate stress increment of unbonded tendons at every load case, a regression formula of ultimate stress increment of unbonded tendons based on elastic - perfectly plastic model has been presented for engineers to calculate ultimate stresses of unbonded tendons in prestressed concrete multi - span continuous structures

    考慮在各種荷載工況作用下筋極限應力增量的變化規律,並與理想的彈塑模型相比較,最終得出以理想彈塑模型計算各種荷載工況作用下筋極限應力增量的回歸公式,從而為預應力混凝多跨連續構的筋應力設計計算提供有益的參考。
  2. In earthquake area, many engineers used concrete structure with unbonded tendons. but people still has lots of different opinions about its seismic behaviors

    預應力混凝構在地震設防區域的應用越來越廣泛,但對其抗震能的認識存在較大的分歧。
  3. The layered combined finite element model is taken in the finite analysis of concrete and bonding bar. in the nonlinear analysis ofunbonded prestressed concrete, the effect that unbonded tendons acts on concrete is replaced by equivalent force in the method of equivalent prestress

    在有限元分析中,混凝鋼筋採用分層組合式的有限元模型,在預應力混凝的非線分析中,將預應力筋對混凝的作用,借鑒預應力的荷載平衡法,用其等效力來代替預應力作用。
  4. The low - cyclic reversed loading tests of two unbonded partially prestressed concrete frames with different ppr have been carried out. the aseismic behaviors are analyzed and compared, with emphases on failure mechanism, hysteretic property, displacement ductility, energy - dissipation capacity as well as stiffness degeneration, etc. the results show, when designed rationally, the unbonded partially prestressed concrete frames can form beam hinge energy - dissipation machine and total destroy mechanism

    通過兩榀不同預應力度的部分預應力混凝扁梁框架構的低周反復荷載試驗,分析研究了部分預應力混凝扁梁框架構的破壞形態、滯回特、位移延、耗能能力、承載力及剛度退化等抗震能。
  5. The prime works are as follows : strain and stress distribution of section was analyzed. the effect of prestress degree. on cracking moment was explored. the relation of the unbonded prestress increment to effective reinforcement index and corresponding bonded prestress increment were studied. the formulae had been established

    其次,設計了三根活粉末混凝預應力疊合梁,兩點對稱集中加載、一次受力,得到了它們的截面應變分佈、撓度與變形、預應力鋼絞線的預應力增量、裂縫的發展與分佈以及極限荷載。
  6. With the study of the ability of unbounded ppc structure and the development of materials of unbounded ppc and the technique of light jack, the advantage of unbounded ppc structure has been widely recognized

    隨著對預應力能的研究,材料供應充足和輕型張拉千斤頂技術的發展,以及預應力樓蓋在高層建築構中的普及,預應力混凝構的優點已得到廣泛的認可。
  7. Based on the experimental results, in concrete limitation stress sandwich first stage ' s ability and one - way and two - way precast slabs sandwich, results content code require - second class crack control. resistant crack calculation is appropriate. because post - tensioned prestressed advances plane ' s resistant crack. deformation and section strain measure accord with calculation results, this indicates 3d - gridding beams modulus is reasonable to precast slabs sandwich

    本文通過對試驗數據的分析總,認為:單塊夾層板第一受力階段的能試驗及單向和雙向裝配整體式夾層板的能試驗,滿足《混凝構規范》 ( gb50010 - 2002 )中關于預應力樓板的二級裂縫控制等級的要求,抗裂設計得當;由於板縫預應力筋的存在提高了板的抗裂
  8. Products and systems for the protection and repair of concrete structures - test methods - part 3 : determination of the adhesion of injection products, with or without thermal cycling - slant shear method

    混凝構防護和修理用產品和系統.試驗方法.第3部分:有或熱循環的注塑產品的測定.斜剪切方法
  9. Combined with the full scale models tested in - situ of prestressed concrete penstock with double circle unbonded strands and single circle bonded strands of xiaolangdi multipurpose dam project of yellow river, the advantages and disadvantages of two different prestressed systems are analyzed, the concrete stress distributions of the prestressed concrete penstock are induced and summarized during the whole tensioning strands stage. the consistence among the test results, the theory calculating and the three dimensional finite element analysis is proved. therefore, the theoretical method of prestressed concrete penstock is feasible

    合黃河小浪底水利樞紐工程在施工現場進行的採用雙層雙圈環形預應力鋼絞線和單圈有預應力鋼絞線對排沙洞襯砌混凝施加預應力的1 : 1模型試驗,對比分析了兩種后張預應力施工體系的優劣,歸納總了預應力筋束張拉過程中預應力混凝壓力管道構管壁混凝的內力分佈規律,驗證了模型試驗實測數據、理論計算和三維有限元分析果的一致,確定了預應力混凝壓力管道理論計算方法的可行
  10. The contents include as follows : the influencing factors of the displacement ductility factor of the unbonded partially prestressed concrete frame structures, such as stirrup reinforcement characteristic value, nominal shear span ratio, axial compression ratio, the appearing order of plastic hinges and partial prestressing ralio ( ppr ) are discussed. the formula of displacement ductility factor of the unbonded partially prestressed concrete frame structures is suggested by regression analysis. with regard to the aseismic design and the request of ductility and energy dissipation, the restriction of the flat - beam / column sectional size and aseismic reinforced design are discussed

    本文主要包括以下內容:討論了配箍特徵值、名義剪跨比、軸壓比、塑鉸出現順序、預應力度等因素對部分預應力混凝框架位移延系數的影響,回歸了考慮影響因素的位移延系數計算公式;對部分預應力混凝扁梁框架構,闡述了抗震設計對扁梁、柱截面尺寸的要求與限制;對滿足延和耗能要求的部分預應力混凝扁梁控制截面抗震配筋進行了探討;通過對部分預應力混凝扁梁梁端的受力分析,改進了以往扁梁梁端扭矩設計值計算公式。
  11. Considering the behaviors of unbonded prestressed concrete beams and steel reinforced concrete columns, a kind of nonconforming beam - column element was constructed and the analysis precision was improved. loading and reloading paths were introduced into the constitutive relationship of concrete. it is helpful to the analysis program to trace the full - range mechanical behavior of structures including the descending part and the hysterisis characteristic under cyclic loading

    考慮預應力混凝梁、型鋼混凝柱等構構件的受力特點,構造非協調樑柱單元,提高了分析精度;混凝的本構關系中,引入卸載路徑和再加載路徑,使得分析程序可以追蹤包括下降段在內的構全過程力學行為,以及反復荷載下構的滯回特
  12. The results show that the performances of precast prestressed beam - to - column concrete connections with unbonded tendons are equal or superior to that of a monolithic connection in terms of ductility and displacement - restoring capacity

    果表明,預應力裝配式混凝框架連接具有良好的耗能能力,在延和變形恢復能力上比現澆連接更優。
  13. But it is seldom reported how is the behavior of the partially prestressed concrete frames with unbonded tendons under the low - cyclic loading

    部分預應力混凝框架構在反復荷載作用下的能如何,卻鮮見報道。
  14. The use of products with advanced materials including concrete additive with high performance, non - bonding prestressed floor, aerated concrete block, treatment of domestic sewage, etc and by relying on a complete quality management system, the quality of projects is guaranteed

    通過使用高能的混凝外加劑、預應力樓板、加氣砼砌塊、生活污水處理等先進材料的產品,並憑借完善的質量管理體系,保證了工程產品的質量。
  15. The main contents of this thesis are the aseismatic performance and design theory of steel reinforced concrete structures and unbonded prestressed concrete structures

    本文的主要研究內容是型鋼混凝構和預應力混凝構的抗震能和設計理論。
  16. At the same time, it brings the greater displacement reaction, lower energy - dissipation capacity and badly ductility ability etc. the unbonded partially prestressed concrete flat - beam frame structure has been used in the practice project in our country, but the aseismatic study of this structure is not perfect at present, study on theory is lagged behind the demand of engineering apply. it has important theoretic meaning and applied value to go deep into the examinational study about the prestressed concrete flat - beam frame structures

    近年來國內已經開始在實際工程中採用部分預應力混凝扁梁框架構,但是目前對這種構形式的抗震研究工作還不完善,理論研究已滯後於工程應用的需要,因此深入進行扁梁框架構的研究,在經濟合理的情況下確保該構的抗震安全具有重要的理論意義和應用價值。
  17. Based on tests of three moment - resisting beam - column connections under low reversed cyclic loading, this paper inquires into the failure pattern, hysteresis loop curves, displacement - restoring capacity, displacement ductility and energy dissipation of the precast prestressed beam - to - column concrete connections with unbonded tendons

    摘要通過三個框架節點在低周反復荷載下的試驗,對預應力裝配式混凝框架連接的破壞形態、滯回曲線、變形恢復能力、位移延、能量耗散等能進行了研究。
  18. In our country, the study on concrete structure strengthened by advanced composite glass fiber sheet is new, the systematicness and practicability is inadequate, especially, there ’ s no mature research in the field of bond performance. therefore, to realize the bond performance and its change rule between the advanced composite glass fiber sheet and concrete is very important

    在我國,高強復合玻璃纖維布加固混凝構的研究僅初見端倪,系統和實用還不強,尤其在能方面更成熟的研究成果,因此,了解和掌握高強復合玻璃纖維布與混凝之間的能及其變化規律具有非常重要的意義。
  19. Previous research showed that the unbonded prestressed concrete member has the similar ductility to the commom reinforced concrete member, while the energy - dissipating capacity is worse that can be found from the narrow hysteretic characteristic

    以往的研究也表明:預應力混凝構件具有與普通鋼筋混凝構件相近的延,但其耗能能力隨著預應力度的加大而有所降低,表現在滯回環的捏攏現象越來越明顯。
  20. Deformations, curvatures, strains of the beams and the stress increments of unbonded prestressed tendons were measured and the crack distribution and failure models were observed. the bearing capability and ductility of unbonded partially prestressed concrete beams were deeply analyzed

    在試驗中,量測了梁的變形、曲率、應變、筋的應力增量等關鍵數據,觀察了梁的裂縫分佈、破壞形態,並對部分預應力混凝梁的承載能力、延等基本力學能進行了較為深入的分析。