熱力發電機 的英文怎麼說

中文拼音 [diàn]
熱力發電機 英文
thermoelectric generator
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 名詞(頭發) hair
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : machineengine
  • 熱力 : [機械工程] heating power
  1. Engineering consu - etation of deiegn for coal - fired power dlant, especial in the fields of thermal system, mechanical equipment selection and the lagout and erection of the tquipment and piping in dower plant

    廠工程設計咨詢、工藝系統擬定及其計算、設備選型選擇、系統及設備的布置和安裝設計。
  2. Many planets ( for example, ganymede, mercury, the earth, jupiter and saturn ) and stars ( for example, the sun ) possess intrinsic magnetic fields. the explanation for their existence and variation remains a great challenge to planetary scientists and astrophysicists. this article attempts to review some recent developments and difficulties in the study of magnetohydrodynamics for the electrically conducting fluid interiors of planets and stars. it is the fluid motions, usually driven by thermal convection, that generate and sustain magnetic fields through magnetohydrodynamic processes in planets and stars. in planets, the magnetohydrodynamic processes are strongly affected by the combined and inseparable effects of rotation, magnetic fields and spherical geometry. the key dynamics involves the interaction between the coriolis and lorentz forces. in the sun, it is the solar tachocline, a thin shear flow layer located at the base of the convection envelope, that plays an essential role in the solar magnetohydrodynamic processes which produce the 11 - year sunspot cycle. some results of a new nonlinear three - dimensional solar dynamo model are also presented

    許多行星(如木衛三,水星,地球,木星和土星)和恆星(如太陽)具有內部磁場.對這些磁場的存在和變化的解釋對行星科學家和天體物理學家是一個巨大的挑戰.本文試圖總結行星和恆星的導流體內部磁流體學研究的新近展和困難.一般由對流驅動的流動通過磁流體學過程產生並維持在行星和恆星中的磁場.在行星中磁流體學過程強烈地受到轉動,磁場和球幾何位型的綜合影響.其動學的關鍵方面涉及科里奧利和洛倫茲間的相互作用.在太陽中其流線,即處于對流層的薄的剪切流層在太陽的磁流體學過程中扮演了一個基本的角色,並由之產生了11年的太陽黑子周期.本文也給出了一個新的非線性三維太陽模型
  3. After a nationwide restructuring of colleges and departments in 1952, the department was renamed as the department of machine manufacturing, comprising 5 disciplines manufacturing technology, foundry technology and equipment, forging and pressing technology end equipment, welding technology and equipment, and etall. graphy and heat treatmento in addition, on the basis of the original power machinery teaching group, the department of power machinery was set up, having 3 disciplines : thermal electr

    1952年院系調整,更名為械製造系,設械製造工藝鑄造工藝及設備壓加工工藝及設備焊接工藝及設備金相處理5個專業,並且由原動組擴建成立了動械繫,正式設有后改為鍋爐燃氣輪汽車拖拉3個專業。
  4. Directives of thermal instrumentation and control for turbo - generator in power plant

    廠汽輪工檢測控制技術導則
  5. The working parameters ( specific enthalpy, entropy, flux of working fluid, reynolds number, etc. ), the configuration parameters of the main components, such as steam turbine - generator group, evaporator and ehd condenser and system efficiency were calculated on the base of thermodynamics theory

    文中以學理論為基礎,計算了低溫余系統的運行參數(比焓、熵、工質流量、雷諾數、管路壓等)和各主要組件如汽輪-組、蒸器和ehd冷凝器的結構參數,並計算了系統的效率。
  6. The existence and quantity of air leak affects the boiler ' s thermal efficiency greatly. so on - line monitoring and diagnosing for the boiler ' s air leak is an important item of energy - saving potential diagnosis in power station, there is n ' t an effective method to solve this problem and few researches are made on this task at the present time

    漏風的存在和漏風量的大小對站鍋爐效率的影響十分明顯,在線確定鍋爐系統各區域的漏風狀況是火組節能潛診斷的一項重要內容,但對此目前國內外尚無有效的方法,相關的研究亦十分少見。
  7. In the paper, the transmission power of section constituted by the assigned branch is seen as objective function, assigning the adjustable generators both in sending system and receiving system, assigning the faults set, including the constraint conditions such as the differences between the angles of rotor and the inertia center angel of the whole system, the thermal stability of branch and node voltage, obtaining the results by using interior - point solution and line - predominant jordan

    本文提出的考慮暫態穩定約束的可用輸演算法是以指定線路組成的斷面的傳輸功率為目標函數,指定送端系統和受端系統中參考調節的,指定故障集情況下,以轉子相對全系統慣性中心的角度差、線路穩定、節點壓等構成約束條件,採用內點法和行主元約當逐行消去法求解問題的最優解。
  8. Studying the structure optimization of the operating unit thermodynamics system with the classic optimization method, using the theory of equivalent enthalpy drop and state equation

    利用等效降法理論以及系統經濟性狀態方程的理論,採用經典優化方法對運行組的系統進行結構優化。
  9. During its operation, the rotor of the machine is always under the great suppression of centrifugal force. the surface of rotor is the most important part to enduring the forces and thermal energy. so the windings of rotor are in a common problem of happening one - point to earth short fault, two - point to earth short fault, or turn - to - turn short fault

    汽輪是一種高速隱極式同步,在其運行時,轉子受到強大的離心的作用,而轉子表面是承受械應的最關鍵的部件,因此汽輪轉子繞組容易生一點接地、匝間短路和兩點接地短路故障。
  10. Item estimation, engineering design, engineering cost and other likeness on fossil - fired power station, heat and power plant, gas turbine combined - cyde power plant

    廠和廠、燃氣輪聯合循環廠等工程項目評估、工程設計、工程造價或類似方面的業務。
  11. The two - dimensional axisymmetric subsonic - transonic - supersonic flow in an experimental arcjet thruster is simulated numerically using flux vector splitting method. the profiles of density, velocity, temperature, pressure and mach number can be obtained by the computation. the computation grid and some computed results are given here. the test equipment such as power supply system, ignition system, propellant supply system, arcjet thruster, thrust measuring device and vacuum system are introduced briefly. some working phenomena of the arcjet are observed and discussed. three different kinds of instability appeared in the process of the experiments. except some important parameters are measured, it is found that the operating stability of argon is better than that of nitrogen

    對一實驗弧加二維軸對稱亞跨超音速流動進行了數值模擬,所採用的方法是矢通量分裂演算法.通過計算可以得出密度、速度、溫度、壓和馬赫數的分佈.給出了計算所使用的網格和一些計算結果.簡要介紹了實驗所使用的設備,如源系統、點火系統、推進劑供給系統、弧加、推測量裝置和真空系統.對所觀察到的一些工作現象進行了討論.有三種不同的不穩定性出現于實驗過程.除了所測量的一些重要參數,通過實驗現氬比氮工作更穩定
  12. Simulating station boiler working in any performance situation is becoming more and more important to develop a training simulator of power plant because of that station boiler has complex structure, nonlinear and multi couple operational parameter

    廠培訓模擬中,鍋爐系統由於結構復雜,非線性,多參數耦合的特點,對其全工況實時模擬的研究顯得尤為重要。
  13. Guide for maintenance of boiler unit for thermal power station. part 8 : the maintenance of air preheater

    廠鍋爐組檢修導則.第8部分:空氣預器檢修
  14. We base on the wind generators ' traits, have produced the generator related products, like charging system, inverter, and repacking system, it has the protection functions for the overcharging, over - discharging, short - circuit, over - loading and superheating etc. to top it off, the digital readout and the alarm system makes the generator run more safely

    、逆變、卸荷系統完全根據風的特點配套生產,有完善的過充、過放、短路、過載、過保護功能,採用數字顯示,簡單直觀,有聲報警,系統運行更加穩定可靠。
  15. Based on sufficient investigation of relative field at home and abroad, combined with actual state of engineering, aimed at the characteristics of low temperature waste heat power generation, under adequate consideration of economical efficiency, the thermodynamic system models on the base of rankine - cycle, which mainly consisted of evaporator, ehd condenser and steam turbine - generator group with r11 as working fluid, were constructed after comparing the current low temperature waste heat power generation systems

    文中在對國內外相關領域進行了充分調研的基礎上,結合工程實際狀況,針對低溫余特點,充分考慮經濟性的前提下,對現行的低溫余系統進行比較,選擇了以具有低沸點的r11為工質,由蒸器、 ehd冷凝器、汽輪-組等主要部件組成的有朗肯循環系統模型。
  16. With the continuous enlargement in capacity of a wind - power generator, the efficiency improvement of electric power generation had been become more and more important. the variable - speed constant - frequency ( vscf ) power generation, which is served to reach maximum wind - energy capturing and utilization for a variable blade - pitch wind - turbine, is the studying hot - spot of the wind - power generation technique at present

    隨著風組單容量的不斷增大,提高效率已是風研究的重要內容。採用變槳距風實現最大風能捕獲和利用的變速恆頻已成為當前風技術的研究點。
  17. The paper designed a project of plant online load optimal distribution system, which could change the mode of load control between electric power distribution center and power plant. with the use of plant online load optimal distribution system, the power distribution center will not control each power unit directly , but delieve instruction of load to plant online load optimal distribution system which shall assure each unit to operate more economically

    本文針對國內廠負荷優化分配中存在的問題,提出了廠級在線負荷優化分配系統的設計方案。該系統的成功應用將改變現在網總調對廠負荷控制方式,總調不再直接控制組,而是針對整個出負荷指令,經在線負荷優化分配系統處理后,根據分析計算結果實現各組的負荷最優分配。
  18. The water then passes through steam generators to deliver heat to the secondary circuit. the steam generator produces steam on the secondary side to drive the turbine and generator

    產生的能,然後流入蒸汽生器,通過交換,在二迴路產生蒸汽,以推動渦輪,把能轉化為
  19. Chinese energy develop electric power group limited liability company is a large - scale state - owned enterprise, which is the collection of electricity generation, coalmining, heating and chemical smelting. the company presently has the general equipment departmentmachine capacity 200mw power set, has the verified coal reserves 3 billion tons, and buys stock the total investment to reach 3 billion in the chlorine alkali chemical industry project

    中能集團有限責任公司是集煤碳開采供化工冶煉為一體的大型國有企業。公司現擁有總裝容量200mw組,擁有己探明煤碳儲量30億噸,併入股總投資達30億的氯堿化工項目。
  20. Thermoelectric generating set

    熱力發電機
分享友人