現澆 的英文怎麼說

中文拼音 [xiànjiāo]
現澆 英文
cast-in-situ
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 澆名詞(姓氏) a surname
  1. Crack - control of aeolotropic hollow slabs in orthogonal in - site concreting deck floors in the construction of large - pillar - net structure of reinforced concrete

    大柱網現澆混凝土框架正交異性空心大板樓蓋的裂縫控制
  2. The monitoring of cracks of floor slab at construction stage

    現澆混凝土樓板裂縫的施工階段試驗研究
  3. Discussion on the deformation analysis of the cracks in cast - in - place floor slab

    現澆樓板裂縫的變形分析
  4. Safety appraise and handle methods of insufficient in - situ concrete floor slab ' s thickness

    現澆混凝土樓板厚度不足的安全鑒定及處理方法
  5. The system is composed with concrete filled cold - formed square steel tube column, the beam with two cold formed c type steel welded together back to back, the slab with profiled - steel and concrete, the beam and the slab joined into composite steel - concrete beam. they all together make up of the bearing members. and the house also includes the light economical - energy sources heatproof walls

    該體系是以冷彎薄壁方鋼管混凝土為柱、冷彎薄壁c型鋼背靠背高頻焊接組成工字型梁、壓型鋼板上現澆築混凝土組成組合樓板並與梁一起構成組合梁作為承重構件,以輕質節能保溫型墻體作為圍護結構組成。
  6. The successful alternative was the cast-in-place segmental prestressed concrete box girder.

    最後採用的方案是分段現澆的預應力混凝土箱形梁。
  7. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  8. Construction of cast - in - place box beam of dongshengbei interchange bridge

    東勝北互通立交匝道橋現澆箱梁施工
  9. Construction of cast - in - situ concrete for continuous box girder of zhangwei canal bridge in winter season

    漳衛運河大橋現澆連續箱梁混凝土冬季施工
  10. Supervisory control of in situ placing cased beam post - tension construction

    現澆箱梁后張法施工監理控制
  11. The site concrete pump is designed for a delivery rate of 87 m3 / h and maximum pumping pressure of 100 bar

    "現澆混凝土泵設計的輸送速度為87立方米/小時,最大泵送壓力為100巴。
  12. As a new foundation improvement technology, the cast - in - situ concrete thin - wall pipe pile ( pcc pile ) is applied widely in the construction of the highway, civil architecture, haven and sea embankment etc. the pcc pile has a great prospect because it has superiority in the treatment of soils, such as construction period, cost and environment protection

    現澆混凝土薄壁管樁(簡稱pcc樁)及其復合地基是一種全新的地基處理新技術,已應用於高速公路、民用建築、港口、海堤等工程建設中, pcc樁在處理效果、工期、造價、環保等方面具有較大的優越性,因此在地基處理中具有廣闊的應用前景。
  13. From above analysis, it is proved that, because the internal force distribution of cast - in - situ concrete hollow floor is notably different to that of waffle slabs, designed as grillage beams and reinforced by these results, the technical advantage of this structure may not be exerted sufficiently so that leading to the increase of reinforcement

    通過以上分析證實,由於現澆空心樓蓋的與肋梁樓蓋具有顯著不同的內力分佈規律,現澆空心板按梁格進行計算並配筋,將不能充分發揮該結構的技術優勢,導致配筋量的增加。
  14. Construction techniques for cast - in - situ box girders of light rail transit with overhead launching gantry traveling on ground tracks

    地面軌道走行式造橋機現澆輕軌箱梁施工技術
  15. Based on the cause analysis for failure of water stop of tunnel ' s cast in site circular construction joint from theoretical and constructional point of view as well as the working mechanism of expansive water stop proposed in terms of width of construction joint, the relation between width of circular construction joint and water pressure resistance of water stop is established and its model test carried out

    首先從理論和施工角度分析了隧道現澆環向施工縫止水條的失效原因,然後從施工縫張開度的角度提出了膨脹止水條止水的原理,在此基礎上建立了施工縫張開度與止水條抗水壓力之間的關系,並進行了模型試驗。
  16. Construction technique for cast - in - situ continuous hollow - slab beam

    現澆連續空心板梁施工技術
  17. Study on the joints of reinforced concrete plate

    現澆鋼筋混凝土樓板裂縫的成因及防治
  18. 4. the side girders, the deck and the lateral beams of the cable - stayed structure are cast - in - place at one time

    4 、金馬大橋在施工過程中採用邊主梁、橫隔梁和橋面板三部分分階段一次現澆
  19. As part of the renovation, the hotel ‘ s intricate terra cotta trim was painstakingly cleaned, and damaged pieces repaired with glass - reinforced concrete castings and finishes matched to the originals

    作為改建的內容之一,該旅館錯綜復雜的陶瓷磚裝飾部分,被人們煞費苦心地清理干凈一些損壞的部分則採用玻璃(纖維)增強混凝土現澆或預制而成,其修復程度可以與原件相媲美。
  20. Performance of cast - in - situ concrete thin - wall pipe pile composite foundation under road embankment

    路堤下現澆薄壁管樁復合地基工作特性分析
分享友人