砌墻工 的英文怎麼說

中文拼音 [gōng]
砌墻工 英文
bricklayer
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : 名詞(磚、石等築成的屏障或外圍) wall
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. To finish the wall by friday we ' ll have to double up on the number of bricklayers

    為了在星期五前完成這堵,我們只得加倍增加人的人數。
  2. However, little research has been made on the measuring and calculating of the thermal data of brickwork and corn pound wall

    但對于體以及復合體的熱數據,實際進行測量和計算的較少。
  3. Brick masonry walls built with a technique known as reinforced grouted brick masonry performed excellently.

    用新的施技術築的配筋灌漿磚表現良好。
  4. Methods of test for ancillary components for masonry - determination of tensile and compressive load capacity and load displacement characteristics of wall ties couplet test

    輔助塊的試驗方法.拉桿的拉伸和壓縮負載容量和負載轉移特性的測定
  5. Methods of test for ancillary components for masonry - determination of tensile and compressive load capacity and load displacement characteristics of wall ties single end test

    輔助塊的試驗方法.拉桿的拉伸和壓縮負載容量和負載轉移特性的測定
  6. Main achievements of the thesis : through analysis of the reasons of blockwork crack, i put forwards the measures on material production, shop drawing design and construction management, etc. especially, i put forwards to theory that changing traditional painting technics to avoid crack of painting layer. the application of above measures in engineering proved they are effective

    介紹了塊在國內外的發展與應用,研究了混凝土裂縫產生的機理,裂縫的形態及裂縫產生的原因,進一步分析研究了體開裂的各種因素,提出了在設計、生產、施等環節的治理開裂措施。
  7. The industrial company baugeschaeft schlott carries out a outstanding quality within the range bricklayer work, dry construction as well as concrete work and framework reorganization as one of the prominent enterprises

    Baugeschaeft schlott是一家高級企業,該企業使用多種藝製造混凝土作業,桁架整理,,無水建築。
  8. Consequently, to optimize the appearance and structure design of retaining walls, especially to have a deeper understanding of the bearing mechanism of various retaining walls and select city retaining wall type reasonably are of great engineering significances and potential economic effect. based on a thorough analysis of the character and mechanism of city - retaining - wall structures, the design theories, construction technology, new wall types and development tendency are deeply discussed. besides, the characteristics of various types of city retaining wall are discussed, and the usual methods for earth pressure calculation are summarized

    本文在綜合分析目前常用城市擋土結構的特點及其受力特性等基礎上,針對一般擋土設計理論、施技術、新型結構以及未來的發展趨勢進行了深入探討,論述了城市擋土結構的特點,並對常用土壓力理論進行了綜述,介紹了城市擋土常見的類型,並介紹了常規的設計理論和方法;通過分析比較,優選出錨桿擋土結構和塊式擋土結構,並從錨桿錨固原理出發,結合程實踐和大量現場試驗、對錨桿的抗拔承載力進行了深入研究,提出了用調整雙曲線模型法計算錨桿抗拔承載力的方法,對土壓力計算方法進行了探討,對其設計計算方法進行了研究。
  9. Though much progress has been achieved in previous study, there still remains a lot to be studied and perfected. the thesis is devoted to study on the multi - ribbed slab wall, the main bearing member in mrss, including its mechanism, failure mode, aseismic capability, mechanical models, ultimate bearing capacity and aseismic design based on control. the paper mainly accomplished such work as follows : 1 ) based on test research on multi - ribbed slab wall, the paper proposed the member ' s failure modes under horizontal loads, analyzed the co - performance between the inner frame and the infilled silica bricks and that between the slab and the outer frame, discussed the wall ' s bearing capacity, rigidity, deformation, ductility and energy dissipation ability in different modes, and put forward a simplified mechanical model of the slab wall under vertical loads

    本文針對密肋壁板結構的主要受力構件? ?密肋復合體為研究對象,就其受力機理、破壞模式、抗震性能、三階段力學模型、極限承載能力以及基於控制的抗震設計方法等進行了較為詳細的研究,完成的主要作有: 1 )通過對密肋復合體在水平低周反復荷載和單調荷載作用下的試驗研究,提出了體的主要破壞模式;分析了框格與內部填充塊、板與外框的共同作的受力特點;探討了不同破壞模式情況下體的承載能力、剛度、變形、延性、耗能等抗震性能,並給出了豎向荷載作用下密肋復合體的簡化力學模型。
  10. Since its successful experiences, it was regarded that the method would also workable to improve the quality of the experiment - staff. " wall - built method " would be proved to be effective for daily work in experimental management

    通過運用「法」合理選用實驗人員,並將該管理理念靈活地運用於提高實驗人員的整體素質等作中,穩步提高實驗隊伍的整體實力,更好地適應現代實驗室管理新模式。
  11. This paper expounds the research on pumice and its concrete, and the testing result indicates the pumice after being properly machined can be used to make lwac and hollow block

    試驗研究結果表明,張家口地區所開採的浮石經過適當破碎加、優化分選和顆粒搭配后可配製性能優良的輕骨料混凝土,並可用於製作性能可靠的建築體用輕混凝土空心塊。
  12. Retaining wall is a construction form of the widespread adoption in engineering field, although appeared the new form of the wall in recent years with the new way of doing, the gravity wall built with stone is still the main form, and therefore the study on optimization design of the gravity wall built with stone has very important meaning

    擋土程界普遍採用的結構形式,雖然近年來出現了不少擋土的新形式和新做法,但石重力式擋土仍然是程中擋土的主要形式,因此對石重力式擋土進行優化設計研究具有十分重要的意義。
  13. In the project of jingyuan garden, a national model project for comfortable residence constructed by us, new technologies including dipy framework system, composite external wall, etc are adopted, especially aerated concrete block enclosure structure is adopted for large areas, which has a great demonstration significance in replacing clay brick and with regard to wall restructuring

    在我們承建的國家康居示範程景元花園項目中,採用了帝枇模網結構體系,復合式外等新技術,特別是大面積採用加氣混凝土塊圍護結構,在替代粘土磚和體改革方面具有極大的示範意義。
  14. Simultaneity, through contrast analysis validate that antiseimic capacity of expansion web is better than that of steel web. therefore, based on the experiences summed up by precedence, the formulation for calculating the crack load and limit load of brick masonry house reinforced by expansion web is advanced, which provides project reference. based on the analysis and studies of masonry shearing strength, test of prestressed single brick masonry wall, and test of prestressed brick masonry house models, and ect, the article has carried through several aspect research as below : 1. a series of experiment on material capability of expansion web, including intensity of single thread and expansion web, ect ; 2. research on influence of loading and destroy of masonry brick building reinforced by expansion web under lowcyclic loading ; 3. study of impact of expansion web on ductility, energy dissipation, intensity, ect under the same situation as above ; 4. put forward computation formulation of masonry brick building reinforced by expansion web

    本著以上的研究目的,本文在分析和借鑒前人體抗剪強度理論、預應力單片試驗研究、預應力模型抗震性能試驗研究等基礎上,進行了以下幾方面的研究作: 1 .作為一種新型結構材料擴張網,進行了一系列的材性試驗(單絲強度、網片強度和在砂漿中被約束條件下的網片強度及其相應的彈性模量) ; 2 .研究了水平荷載往復作用(低周交變)下,普通鋼絲網和擴張網砂漿對體結構抗裂及承載能力和破壞形態的影響,並將這兩種材料的加固效果進行了對比; 3 .上述狀態下,兩種網片水泥砂漿對體結構變形、延性、耗能、剛度退化等抗震性能的影響及其影響效果的比較; 4 .提出擴張網水泥砂漿加固體結構的抗剪強度計算建議公式。
  15. Responsible for or taking part in the research projects which have been spread and received scientific and technological progress rewards, such as " prestressed strengthening technology ", " oil - proof of the composite flooring for multi - storied industrial building ", " the strengthening technology with shotcrete ", " the strengthening technology with carbon fiber material ", " the diagnosis and treatment for leakage of exterior wall ", " the testing and identifying technology of energy - saving building ", " the testing technology of the actual strength of the bonding mortar in masonry structure "

    負責和參加了"預應力加固技術" 、 "多層業廠房抗油滲復合樓地面技術" 、 "噴射混凝土加固技術" 、 "碳纖維加固技術" 、 "外滲漏診治技術" 、 "節能建築檢測鑒定技術" 、 "體結構築砂漿實際強度檢測鑒定技術"等多項科研成果,並得到推廣應用和獲得科技進步獎。
  16. Measures for quality control of gas concrete masonry filling wall construction

    加氣混凝土塊填充質量控制措施
  17. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽程的科研項目,綜述三峽程開以來的主要科研成果及程應用情況,包括:一期土石圍堰基礎處理與施技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯的結構與支護研究;特大型水輪發電機組的科學研究。
  18. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽程的科研項目,綜述三峽程開以來的主要科研成果及程應用情況,包括:一期土石圍堰基礎處理與施技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯的結構與支護研究;特大型水輪發電機組的科學研究。
  19. Due to aac ' s unique cell structure and absorbing water propriety, however, there are still many problems, when we adopt ordinary mortar to construct and plasterer ash, such as wall crack, big area of layer of plasterer ash crack and partially hollow drum, even according to present aac technical specifications, for the actual operation craft is so complicated that it is very to guarantee each preface quality

    然而,由於加氣混凝土本身特有的多孔結構和吸水特性,採用普通砂漿築與抹灰,即使按現行加氣混凝土塊施規定的方法施,由於實際操作藝復雜,各序質量難以保證,依然有體開裂,抹灰層大面積龜裂和局部起鼓、空殼、脫落等現象。
  20. This system is the new type, in which the connection between the special - shaped column and concrete block is stronger than that of frame structure and the dark beams are located and its constructional sequence is brickwork first and placing columns second and concrete blocks are as bottom forms when beams are placing

    這種新型結構形式的主要特點包括:異形柱與塊為馬牙槎連接、體內含有暗梁、施順序為先后澆柱、梁澆築時以塊為底模。
分享友人