竣工年 的英文怎麼說

中文拼音 [jùngōngnián]
竣工年 英文
year of completion
  • : 動詞(完畢) complete; finish
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (時間單位) year 2 (元旦或春節) new year 3 (歲數; 年紀) age 4 (一生中按年齡劃分的階...
  • 竣工 : (of a project) be completed
  1. The chi lin nunnery is the only institution in hong kong recognized as a " nu zhong shi fang cong lin ". in other words, it is a nunnery open to nuns from all quarters and its abbess is selected purely on merit

    樂富中心是房屋委員會轄下最大的商業購物中心,其發展計劃共分為兩期:第一期在一九八五完成,第二期則在一九九一
  2. The 343 - km 213 - mile andaman trunk road, completed in 1989, was designed as an economic lifeline to link the island chain

    長約343公里213英里的安達曼幹道於1989。它被設計成連接安達曼列島的經濟交通線。
  3. It was completed in 1932. what kind of feelings did people in the 1930 s have when they looked up at this clock tower decked with arabesque patterns using genuine stones and bronze

    這座於昭和7( 1932 ) ,由天然石塊及青銅建成的對稱性建築曾留給昭和初期的人們怎樣的想象
  4. Completion of this bridge is expected in a year or so.

    這座橋一半載可望
  5. Capovilla was born in guayaquil in western ecuador on september 14, 1889, the same year that adolf hitler was born and the eiffel tower was inaugurated

    卡波比亞18899月14日出生在厄瓜多西部的瓜亞基爾市,與希特勒出生和埃菲爾鐵塔
  6. Other major building projects completed in 2004 included the penny s bay police post

    的大型程項目亦包括竹篙灣警崗。
  7. Upon the completion in 2009, the expansion will add 19, 400 sq m to the hkcec bringing total exhibition space to nearly 83, 000 sq m and total rentable function space close to 90, 000 sq m

    程將於2009,屆時將為會展中心增加19 , 400平方米的展覽場地,使展覽場地增至83 , 000平方米,而中心可租用的總面積將接近九萬平方米。
  8. The bridge was completed in september of the same year.

    九月這座大橋
  9. Basis " orders of sell of access of land of shenzhen special economic zone " the seventeenth regulation, contract of sell one ' s own things should have the following and main provision : ( one ) the full name of bilateral party or name, address ; ( 2 ) a ground date of access of land of sell one ' s own things, area ; ( 3 ) land is used year period reach case stop time ; ( 4 ) the amount of gold of land access sell one ' s own things, money is planted, pay kind and time ; ( 5 ) the time of consign land ; ( 6 ) point of program, municipal design ; ( 7 ) project complete is referred check and accept time ; ( 8 ) municipal facilities form a complete set builds obligation ; ( 9 ) land of use photograph adjacent and viatic limitation ; ( 10 ) the project that builds accessary, add establishment and obligation ; ( 11 ) responsibility of breach of contract ; ( 12 ) party thinks necessary other item

    根據《深圳經濟特區土地使用權出讓條例》第十七條的規定,出讓合同應具備以下主要條款: (一)雙方當事人的姓名或者名稱、地址; (二)出讓土地使用權的宗地號、面積; (三)土地使用期及起止時間; (四)土地使用權出讓金的數額、幣種、交付方式及時間; (五)交付土地的時間; (六)規劃、市政設計要點; (七)項目提交驗收時間; (八)市政設施配套建設義務; (九)使用相鄰土地和道路的限制; (十)建設附屬、附加設施的項目及義務; (十一)違約責任; (十二)當事人認為必要的其他條款。
  10. Completed in 2002, it ' s inspired by the original alexandrina library, founded in the 3rd century bc and acclaimed as the greatest of all classical institutions

    此建築的設計靈感源於公元前三世紀建的舊亞歷山德里娜圖書館,被譽為經典建築之最, 2002
  11. After 11 years of construction, the aswan high dam in egypt is completed

    1970的今天,歷經11的修建后,埃及的阿斯旺水壩完成。
  12. On the western side, belcher bay reclamation and the construction of belcher bay link on it were completed in february 1997 to tie in with the opening of the western harbour crossing

    在港島西面,卑路乍灣填海程及在該填海區興建的卑路乍灣連接路,已在一九九七二月,配合西區海底隧道的啟用。
  13. Works are being carried out for the installation of cctv cameras in north lantau highway and public transport interchanges at tsing yi, tung chung and chek lap kok

    角的公共交通交匯處,進行閉路電視攝影機裝設程,預計於一九九九
  14. A climbing lane between nam wai and clear water bay road in the kowloon - bound direction was constructed in july 1992 and a substantial improvement to the junction of hiram s highway clear water bay road was completed in may 2000

    一條介乎南圍與清水灣道之間往九方向的上坡慢線已於一九九二七月建成。二零零零五月,西貢公路清水灣道交界的改善
  15. Ring road no. 8 was the first ring road to be completed in 21 years since the completion of ring road no. 7 kannana dori in 1985

    8號環線是自19857號環線完成以來間隔了21的第一條環路。
  16. The facility, which was completed at frankfurt airport in germany in december 2004, is over 19, 000 square feet large and features a cigar lounge with leather armchairs

    位於法蘭克福機場的頭等艙休息廳於200412月,佔地面積超過1 . 9萬平方英尺,其中的"雪茄"休息廳全部裝備了真皮扶手椅。
  17. The tolo highway between island house interchange and ma liu shui interchange is being widened to dual four - lane carriageway standard, with the works due to be completed in mid - 2003. in ma on shan, to cope with future growth in traffic demand, the sai sha road section between kam ying road and the junction with trunk road t7 at sha on street is being widened to dual two - lane standard ; work started in august 2002 for completion in 2005

    為配合馬鞍山日後交通量的增長,介乎錦英路與日後的t7號主幹道路交界處的一段西沙路,已在二零零二八月展開擴闊程,改為雙程雙線行車道,預期程可在二零零五
  18. A : the completion date will be on july 1, 2007

    預計日期為20077月1號。
  19. Zacarias also said that rebuilding work on the north - south highway ( of which the zambeze bridge is a key section ) would be finished by the end of the term of the current government, in 2009

    扎卡里亞斯還說,在莫南北高速公路的重建作(贊比西大橋在其中非常重要)將於2009,即本屆政府結束時
  20. After nearly half a year of intensive work, the reconstruction of the airport north road was finally completed on july 11th

    經過近半的緊張施,機場北路改建項目11日通車。
分享友人