管涵洞 的英文怎麼說
中文拼音 [guǎnhándòng]
管涵洞
英文
pipe culverts-
Frost heaving analysis of corrugated pipe culvert without foundation in permafrost region
多年凍土地區無基波紋管涵洞凍脹分析Standard practice for life - cycle cost analysis of corrugated metal pipe used for culverts, storm sewers, and other buried conduits
涵洞雨水管道和其它地下管道用波紋形金屬管壽命周期成本分析的標準實施規范Standard practice for structural design of corrugated aluminum pipe, pipe - arches, and arches for culverts, storm sewers, and other buried conduits
涵洞排水和其它地下管道用波紋鋁管管拱和拱結構設計的標準實施規程Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers
涵洞雨水管和污水管道用預制鋼筋混凝土箱形斷面的標準規范Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers metric
涵洞雨水管和污水管道用預制鋼筋混凝土箱形斷面的標準規范A sewer or drain crossing under a road or embankment
涵洞橫在公路或堤岸下面的下水道或排水管Corrugated steel culvert
波紋鋼管涵洞According the field test of conduit with high embankment, this paper states the main cause of conduit damage is that the formula or the experience curves with a smaller earth. value of the top of conduit from calculation are used. in order to get rid of the damage the better means is that soft material paved on the top of conduit
涵洞(管)縱向開裂病害存在非常普遍,本文結合高填土涵洞現場測試,指出一些設計部門採用了計算值偏小的公式或經驗曲線計算涵洞頂的垂直土壓力,是病害產生的主要原因,較好的解決措施是在涵洞頂鋪填壓縮性大於填土的柔性材料,可以大大減小洞頂垂直土壓力。Standard specification for manufacture of precast reinforced concrete three - sided structures for culverts, storm drains
涵洞和雨水管用預制鋼筋混凝土三邊結構製造的標準規范Standard specification for manufacture of precast reinforced concrete three - sided structures for culverts, storm drains metric
涵洞和雨水管用預制鋼筋混凝土三邊結構製造的標準規范Standard practice for installing corrugated aluminum structural plate pipe for culverts and sewers
涵洞和下水道用波紋鋁結構板管安裝的標準實施規范分享友人