管道內頂 的英文怎麼說

中文拼音 [guǎndàonèidǐng]
管道內頂 英文
crown
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 名詞1. (內部; 里頭; 里邊) inner; inside; within 2. (妻子或妻子的親屬) one's wife or her relatives 3. (姓氏) a surname
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  1. The queen s hotel, ennis, county, glare, where rudolph bloom rudolf virag died on the evening of the 27 june 1886, at some hour unstated, in consequence of an overdose of monkshood aconite selfadministered in the form of a neuralgic liniment, composed of 2 parts of aconite liniment to 1 of chloroform liniment purchased by him at 10. 20 a. m. on the morning of 27 june 1886 at the medical hall of francis dennehy, 17 church street, ennis after having, though not in consequence of having, purchased at 3. 15 p. m. on the afternoon of 27 june 1886 a new boater straw hat, extra smart after having, though not in consequence of having, purchased at the hour and in the place aforesaid, the toxin aforesaid, at the general drapery store of james cullen, 4 main street, ennis

    他服的是按附子搽劑二氯仿搽劑一系他於一八八六年六月二十七日上午十點二十分在恩尼斯教會街十七號弗朗西斯登希藥房所購,按比例親自配製的神經痛搽劑。盡並非由於此舉,然而在此舉之前,一八八六年六月二十七日下午三點十五分,他曾從恩尼斯的通衢大四號詹姆斯卡倫普通服裝店購買了一嶄新而時髦的特級硬殼平草帽盡並非由於此舉,然而在此舉之前,他於前文中所述的時刻與地點,購買了前邊提到的毒劑。
  2. This article is composed by four parts. the foreword introduces simply the process of from establishment to development and contabescence of shanxi bank and the operating and running status. then bring forward the theme of this article that the organizational and managing system was the determinant factors of the prosperity and decline of shanxi bank and its experiences and lessons lend a helping hand to the enterprises of our time. the first part mainly tells of the organizational system and managing mode which drove the development and prosperity of shanxi bank, i t was consisted of the organizing system of the ownership departing from the power of management, and the capital frame of composing by the yin - share and manpower - share, and the human resources management system including high - level various and with elasticity distributing system and strict managing system, and the rigorous mamaging system and flexible running frame, and the enterprise culture of combining tigtly with the ru culture

    組織制度方面,主要通過對票號所有權與經營權相分離的組織制度的研究,總結其對票號發展所起到的重要作用;資本構成方面,主要對票號銀股、身股並重的資本構成,特別是票號實行的身股制度進行研究,總結其對員工所形成的有效激勵作用;用人體制方面,主要從激勵和約束兩個方面分別進行研究,一方面是票號分配體制的高水平、多樣化、富於彈性,對票號員工形成了有效的激勵作用,另一方面是嚴格的人員選拔、培養、任用以及監督、獎罰等理制度,對票號員工形成了有效的約束作用;理制度和經營體制方面,主要通過對票號各類號規進行分類研究,分別從理制度和經營體制兩類容來著手,總結票號理制度的健全和經營體制的靈活對票號業務發展所起到的重要作用;企業文化理念方面,分別從員工教育和儒商融會兩方面進行研究,總結票號對員工德教育的重視給票號帶來的良好企業風尚以及儒商融會理念使票號在經營方面更加成熟穩健、注重企業長遠利益。
  3. It can be used in light steel ceiling board structure, indoor ceiling, wall skirts, partition wall, room door, door, post, sample room, movable house, and various furniture ; strong displacement : it can replace traditional three - ply board, gesso, plastic, and calcium silicate board etc

    舉凡輕鋼天花板室輕隔間防火防火門板樣品屋活動房舍傢俱襯板等皆可且取代性強,可替代傳統夾心板石膏板塑料板硅酸鈣板等。
  4. The in - situ testing includes surface deformations, sub - surface movements, earth pressures, pore water pressures, underground water levels, spt, stresses of pipes and pipe - soil contact stresses. in addition, the total jacking forces, deviations in line and level of the pipe line and earth pressures in the earth pressure balance machines ( epbm ) are also recorded. the results of field - testing are analyzed, and the variety of testing datum include earth pressures, pore water pressures and underground water levels during the course of the shield through it are studied

    現場測試容包括地面變形、深層土體變形、土壓力變化、孔隙水壓力變化、地下水位變化、土體標準貫入試驗、力變化、土接觸應力變化以及施工現場記錄(包括力、土壓力、平面偏差、高程偏差等) 。
  5. The pipe of fume hood should upward through the roof. there should be water pipe and water sink in the fume hood

    2通風櫃,通風櫥的要通到屋,通風櫥要有水,水槽。
  6. Step 6 : after complete the grouting and curing work between all the installation work in the liner ( including process piping, pipe support, etc. ) & liner and rock bed, complete the installation work of top elliptic head of liner using 35 / 50 ton hyd - crane and 25 ton truck crane

    第六步:待襯所有的安裝工作(包括工藝配支架等)及襯與巖床間的灌漿、養護工作完成後,用35 / 50噸液壓起重機和25噸汽車起重機完成襯部封頭的安裝工作。
  7. Gravity drainage systems inside buildings - part 3 : roof drainage, layout and calculation

    建築物部重力排水系統.第3部分:屋雨水.布局和計算
  8. Space for equipment and pipes in the ceiling is not sufficient for installation and maintenance

    部設備、的安裝、檢修空間不夠。
  9. No control over the vertices once it enters into the pipeline

    程序員無法控制進入點。
分享友人