管道布置 的英文怎麼說

中文拼音 [guǎndàozhì]
管道布置 英文
pipe arrangement
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  1. The calculated results coincide well with the model experiment, which assure the exaction of fea model. the accurate calculate method can not solve the crack control problem of slrcp

    因為這樣既保留了此類上的優點,又避免了由於帶裂縫工作而引發的耐久性問題。
  2. More space - effective : the outlet is available for three directions, leftwards, rightwards and upwards, easy for pipeline layout and installation and space - effective

    佔地更省:出口可向左、向右、向上三個方向,便於管道布置安裝,節省空間。
  3. Measurement precision contribute to improving the security class and economic of boiler running and automatic level of whole plant. the smart measurement instrument of the boiler ’ s air flow designed in the thesis and the instrument can make the degree of accuracy get to. firstly, the thesis build the “ velocity - area ” method which is on basis of “ log - tchebycheff ” on the analyzing of basic measure method of boiler ’ s air flow. secondly, model86 averaging pitot tube was selected the right model of flow transducer which can pickoff the differential pressure and static pressure. modelc264 which made in setra system corp. u. s. a was selected as ultra low differential pressure transmitter. a good flow of boiler ’ s air was calculated by offsetting pressure and temperature. finally, numeroscope was designed with z80cpu and other chips

    精確的監測有助於提高鍋爐燃燒的安全型、經濟性,也有助於提高電廠的整體自動化水平。本文設計的智能化鍋爐風量測量裝能夠實現對鍋爐送風的精確測量,精度可達。本文首先研究鍋爐送風矩形大測量理論,提出在流來流量測量測點基於「對數-切比雪夫」法的速度-面積法。
  4. It includes two aspects in content : one is the best choice for plane disposal of pipeline, and its methods follows as decision - making plot, simple trapeziform and optimizing trunkform etc ; the other one is optimizing pipe parameter when the plane disposal of pipeline has been fixed, and the methods of which are linear programming, unlinear programming, dynamic optimizing, direct optimizing, hereditary arithmetic and so on

    污水網優化設計包括兩個方面的內容:一是線平面的優化選擇;其方法有:決策圖法,簡約梯度法,優化樹法等。二是在線平面已定情況下進行參數的優化;其方法有:線性規劃法,非線性規劃法,動態優化法,遺傳演算法,直接優化法等。
  5. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通非常緊湊,急轉角度大且轉彎距離較小,對于內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通設計提供依據。
  6. ( 3 ) by spot reconnaissances, according to the results of calculations and measures, the problem of vibration is solved by adding deflexed supporting and suspending nogs, making pipelines shunt - wound and without changing the previous design and collocation, which can also measure up nationally. to complete the improving program successfully, the improving project is demonstrated using ansys5. 6 limited - unit analyzing software, the results of it show that the project put forward can resolve the problem of transmitting steam pipelines

    通過現場勘察,根據計算和測量結果,決定在不改變導汽原有設計和,同時又滿足國家標準的前提下,採用加裝偏轉支吊架、導汽並聯的措施,通過改善導汽剛度和改變固有特性的方法,對該機組四根導汽振動問題進行了處理。
  7. By considering deflection of freezing pipes and using the fem method, the three - dimensional temperature field of the connecting passage of shanghai east fuxing road tunnel is simulated

    考慮了凍結偏斜的情況,利用有限元方法對上海市復興東路隧聯絡通進行了三維溫度場模擬。
  8. In many big enterprises such as electric power and pentrifaction ones, there are lots of high temperature and pressure pipelines conveying steam. because of improper design, collocation and adjustment of the supporting and suspending nogs, pipelines often vibrate, which affects natural life, threatens safe production and even leads to grave accident

    在電力、石化等大型企業中,存在著大量的高溫、高壓輸汽,由於支吊架設計、和調整不當,常常發生振動,影響的使用壽命,對安全生產造成威脅,甚至引起重大事故。
  9. Simulation and optimization of large hpp construction : to pursue best construction proposal by optimizing theory and method and applying information technology, including layout of access, providing and allocation of construction equipment, coordination of construction progress, arrangement of resources, selection and arrangement of construciton materials to develop three - dimensional modelling and optimize the system

    大型水電工程施工模擬與優化? ?根據當前水電工程施工組織與理的現狀,通過優化理論與方法、信息技術等的應用,尋求最優化的施工組織方案,包括施工路的、施工機械的配備與調度、施工進度的協調、施工資源配、施工材料的優選、料物的優化調配等,開發工程施工三維模擬與優化系統。
  10. In order to improve efficiency and save energy obviously, the text analyses the problems existing in the design of providing heat through pipes in cities, such as the disposal of pipes, burying and lay directly, heat expiation of pipes, hydraulic balance and so on

    摘要通過分析城市集中供熱網設計中存在的問題,對、直埋敷設,供熱熱補償以及水力平衡等進行了分類探討,以最大限度地提高效率節約能量。
  11. The thired part tick off some tye of the lay forms of the design buried pipe

    第三部分列舉了直埋的幾種典型形式。
  12. If the space and environment allowed, extend the roll pipe and put it into the trench after completely digging the trench between two manholes

    時,若空間允許可待溝挖至適當長度時,再依手孔與手孔間之段長一次拖位放于溝。
  13. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  14. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  15. Design standard piping layout for chemical plant

    化工裝管道布置設計規定
  16. General rule of piping layout design for petrochemical industry

    石油化工管道布置設計通則
  17. My main job is to design piping layout, do process calculation and supervise site construction

    我的工作主要是畫管道布置圖、工藝計算以及現場施工。
  18. This part also discussed the design of buried anchor and anchor ' s thrust count ways for each form of the pipe lay

    本部分還討論了直埋固定墩的設計以及各種管道布置形式下的固定墩推力計算方法。
  19. To achieve the best irrigation system, the es can try several pipe planning s chemes for each irrigation system, and select the best one as the final scheme, thus the optimization is accomplished

    另外,為獲得最優的灌溉系統,本專家系統對每個灌溉系統均考慮了多種管道布置方案,可進行多種方案的優選,實現了優中選優。
  20. The function of the software is useful, it has provided many functions such as the calculate of crop water requirement, pipeline layout ( automatic layout and manual operation ) and its optimization, pipe diameter optimization. investment budgetary estimate and economic beneficial result can be result. and can rapid create plan and do plan comparison, the software provides many kinds of result output such as graph. text, table and so on

    該系統可以實行作物需水量計算,系統設計流量推算、水力計算、工程投資概算,經濟效益分析等功能,建立了常用的數據庫(材、件、水泵和電機等)並對其進行理和維護,可以實現包括管道布置徑優化、材選擇等多種參數選擇在內的多種方案比較、優選。系統能提供圖形、文本、表格等多種形式的成果輸出,人機交互界面友好,操作方便。
分享友人