  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填分期、圍設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  2. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流建物的等級、水工布置。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍擋汛后時段洪水導流方案的合理性和經濟性,為施工決策提供理論依據。
  3. Established in 1963 as the fire research institute of public security ministry ( psm ) and moved in 1965 from beijing to dujiangyan, sichuan fire research institute of psm, directly under the public security ministry, has been majoring in the research of building fire science and technology

    公安部四川消防研究所直屬中華人民共和國公安部,是從事建防火科學與技術研究的專業研究所,始建於1963年,其前身為公安部消防科學研究所, 1965年從北京遷建於舉世聞名的世界遺產地?都江市。
  4. It founds natural heightening theory for warping dams and puts forward specific way of diversion, measures for preventing dam eroded and design for energy dissipation and flood storage of cofferdams and sedimentation and dewatering through exploration and study on deposition in front of natural formed dam and the techniques of building dam through hydraulic filling

    通過對天然聚湫壩體前的淤積和「水力沖填」壩技術的探索和研究,創立了淤地壩壩體自然加高的理論,並提出了具體的導流方式、壩體防沖措施及圍消能蓄洪、留淤脫水設計。
  5. So the labyrinth weir is particularly suited for use where the discharge structure need to enlarge the ability of outflow but the width is restricted the labyrinth weir could be divided into straight - labyrinth weir and curve - labyrinth weir in this paper

    因此,迷宮特別適用於泄水寬度受限,但又需提高泄流能力的泄水建物中。本文將迷宮分為直線型迷宮和曲線型迷宮
  6. This paper gives an account of the construction schemes of building artificial islands and sinking concrete cofferdams for shoal piers no. 53 and no. 59, and the construction schemes double - wall steel cofferdams for deep water piers no. 54 ~ 58 of hengyang xiangjiang river bridge on wuhan - guangzhou passenger dedicated railway

    摘要介紹武廣客運專線衡陽湘江特大橋53號、 59號淺灘墩採用的島、下沉混凝土圍施工方案,以及54 ~ 58號深水水中墩採用的雙壁鋼結構圍施工方案。
  7. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍基礎處理與施工技術;大江截流上下游土石圍平拋墊底研究;二期圍防滲工程研究;大江截流計算機科學管理;大壩混凝土澆方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  8. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍基礎處理與施工技術;大江截流上下游土石圍平拋墊底研究;二期圍防滲工程研究;大江截流計算機科學管理;大壩混凝土澆方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  9. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及底板樑柱節點構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  10. Article 20 the ditches, dikes and other relevant buildings which are interdependent with urban roads shall be managed by the authorities to which such facilities have greater utility after consultation among authorities concerned about the utility

    第20條(與道路相依賴之水圳提等之管理)水圳、堤及其他有關建物,與市區道路發生互相依賴作用時,由各該主管機關就效用大小會商,劃交效用較大方面管理之。
  11. The west dam faced the inner sea of rocky harbour and was 2, 470 ft. long and 333 ft. high. the construction of the 2 dams was a complicated process, as 2 cofferdams had to be constructed at each of the sites, before the main dams could be built. these were to keep the dam sites dry for construction

    兩條主壩建工程相當復雜,在興建主壩之前,需于建堤壩地點建造圍,將海水隔開,抽乾海床范圍內的海水,挖除黏土和沙,才堤壩,使主壩能穩固地建造在堅硬的巖石上。
  12. Hydraulic structures, velometers, weirs, and flumes are used to gauge water in many irrigation districts. the fundamental principles and suitable conditions of these water metering methods are introduced in this paper. the main problems in the development of water metering instruments and facilities as well as main causes of difficulty in popularization of the methods in irrigation districts are analysed. it is suggested that selection and construction of water metering facilities should be combined with canal lining in irrigation districts. it is also pointed out that for realization of automation of water metering it is necessary to develop and popularize portable and stationary water metering instruments step by step based on economic development levels in irrigation districts

    介紹利用水工建物、流速儀、、槽進行量水的基本原理及各自適用條件.從量水儀器、設施的性能、價格及灌區經濟發展水平等方面,分析目前在灌區量水儀器、設施的開發研製方面存在的主要問題,以及灌區量水難以普及的主要原因.提出應結合灌區渠道防滲工程建設,合理選擇和建設量水設施,並根據灌區經濟發展水平,分步驟研製和推廣便攜式或固定式量水儀器,最終實現灌區量水自動化的灌區量水實施方案
  13. The construction scheme is briefly introduced herein, and furthermore, the diversion structures, the composite scheme consisting of open caisson group adopted to treat the overburden of the foundation for the stage 2 longitudinal concrete cofferdam and the diversion method of bottom outlet combined with the dam gap used for the stage 2 diversion are described as well

    文中對該方案進行了簡要介紹,並介紹了有關導流建物,以及二期縱向混凝土圍基覆蓋層採用了沉井群等綜合處理方案和二期導流採用的底孔加缺口聯合泄流方式。