索力控制 的英文怎麼說
中文拼音 [suǒlìkòngzhì]
索力控制
英文
cable force control- 索 : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
- 力 : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
- 控 : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
- 制 : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
- 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
-
The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection
本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。I crept along, fighting paralysis of the calves and the thighs.
我躡腳躡手地摸索著走,極力控制著肌肉抽搐的雙腿。Suitable calibrated dynamometers were used to control the pull in the prestressing cables.
用合適的標定過的量測計控制預應力鋼索的拉力。Drawback occurred in the classical vssmc can be alleviated in the proposed control scheme because of importing the eliminating chatterer. according to the control strategy put forward above, corresponding controller for abs is designed. quarter braking vehicle model with four dof ( including vertical and longitudinal motions of body as well as vertical and spin motions of wheel ) is built considering the effects of wind resistance, longitudinal inertia forces, the vertical dynamics associated with the suspen
總之,基於車輛動力學建模,提出並探索了幾種實用且具有高魯棒性的變結構、模糊控制策略在abs 、 asr及vdsc系統中的應用,而後開發了abs的ecu原形,採用實時硬體在環模擬技術,對三種模糊控制策略進行了性能模擬。In this research, four experiments had been designed to study the patterns and characteristics of semg signal by linear and nonlinear signal analysis methods during the short period of recovery, ischemic forearm exercise, sustained and intervallic maximal voluntary contraction of biceps brachii in twenty - eight human subjects
為探索肌肉疲勞過程中影響semg信號變化的生理因素,本研究採用線性和非線性混沌動力學兩個方面的分析方法,觀察在各種控制條件下的肌肉疲勞或恢復過程中semg信號的變化規律。He made an effort to think of nothing but the problem of keeping the jeep on a straight course.
他竭力控制自己不去思索,集中精力讓吉普沿筆直方向行駛。" dr. gorbsky ' s results provide elegant proof that the cell cycle must be precisely controlled, " said rodger mcever, vice president of research at the facility. " now he and his lab can work toward developing innovative methods to probe and better understand the complex process of cell division. the research is detailed in the april 13 issue of the journal nature
該基金會負責研究工作的副主席羅傑麥凱維爾說, 「戈爾博斯基博士的研究成果為下面這種觀點提供了非常有力的證據,那就是細胞分裂的循環周期必須處于精確控制之下」 , 「現在他及其所在的實驗室可以致力於開發出更具創新性的研究方法,以對細胞分裂進行進一步的探索,並使人們能夠更為深入詳細地了解細胞分裂的復雜過程」 。As the vital development of the millimeter wave guidance technology, phased array antennas use electrical control scanning beam, which results to faster scanning velocity, more flexible beam control and higher anti - interference ability. thus it can realize target seeking, tracing, guidance at the same time, and can work in the complex and worsening condition
作為毫米波制導技術的一個重要發展方向,相控陣制導技術中的相控陣天線是採用電控方式掃描波束,掃描速度快、波束控制靈活、抗干擾能力強等,可以同時完成目標搜索、跟蹤、引導等多項功能,能工作在日益復雜和惡化的工作環境中。Pretensioned space lattice structure is a new kind of space structure which develops very fast in recent years. through taking the pretensioning with tendon, the space lattice structure could effectively improve the weight of bearing, control the distortion of the structure, minimize the cost of the engineering
拉索預應力空間網格結構是近幾年發展比較快的新型空間結構體系。在空間網格結構中通過拉索引入預應力,能夠有效地提高結構承載力。控制結構變形,降低工程造價。According to different control object, the task calculates tension of suspender
同時採用不同的控制目標計算吊索(桿)張力。But if it has power, thorpe said, " the spacecraft is quite capable of autonomous control even if it doesnt hear from earth.
但如果它的權力,索普說: "飛船尚能自主控制即使不聽到地球The company has been working with the usn to identify areas where ship complementing can be reduced, with the new nuclear propulsion plant and the new aircraft launch and recovery systems offering the main opportunities
這種發動機將在阻攔的動態過程中有效降低阻攔索拉力的峰值,並對著艦鉤掛上阻攔索的整個過程以及飛行最終停止的位置進行準確的控制。This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed
再次,介紹了懸索橋的施工控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了施工計算,提出本文關于懸索橋的主纜無應力長度控制、索鞍預偏量控制、錨跨張力控制、絲股架設控制、索夾安裝位置與吊索長度控制的方法;介紹了吊梁階段鞍座頂推量的確定與控制方法,分析了施工階段懸索橋的線形變化過程。The force control of suspension bridge anchorage cable is the main contents which will be researched. according to the character of suspen - sion bridge anchorage, three questions is solved in this paper on the basis of the construction control experience of the highway bridge of yichang yanzhi river. firstly, an effective method of cable force control is presented in this paper, which has settled the puzzle of cable force accurate operate through fixing a pressure transducer at the behind of the hydraulic jack. secondly, an exactitude calculation model is founded in this paper. in addition the influence of boundary condition, sag, inclination, flexural rigidity and environment temperature to the cable vibration frequency which make the frequency method could be used to the measurement of cable force. in the end of this paper, a control system of anchorage cable force is developed on the basis of the above research. this system is very steady, credible, high precision and convenient. it is a new and credible method to be used to the force control of sus - pension bridge anchorage cable. in this paper, the conundrum of cable force control has been solved. the fruits are very useful to the development of inland suspension bridge
提出了一種有效可行的錨跨張力控制方法,即通過在油壓千斤頂后加壓力傳感器,並利用單片機技術進行數據採集,解決了懸索橋錨跨索股初張力精確控制的難題;建立了錨跨索股索力的精確計算模型,分析了索股的邊界條件、斜度、垂度、抗彎剛度及環境溫度對索股頻率的影響,解決了弦振法在大跨徑懸索橋索力測試中的應用問題;在上述研究成果的基礎上,研製出了錨跨張力控制系統,該系統具有穩定可靠,精度高,使用方便等特點,它的投入使用將為我國今後大跨徑懸索橋錨跨張力控制提供一種全新的、可靠的手段。Taking the sucessful control experiences in previous cable - stayed bridge construction into consideration, the control principles and methods for gonghe bridge, that is controling the stress of both the top and bottom sides of main beam, regarding the second stretching as the hauling cable force method, are offered, and related construction procedures for all construction stages are designed
在總結前人對斜拉橋施工控制經驗的基礎上,針對公和斜拉橋施工控制提出了相應的控制原則和方法,即以「控制主樑上下緣應力」為主梁內力控制原則,以「二次張拉」為斜拉索索力控制的方法,並根據各施工階段的具體需要設計相應的施工步驟。The successful application of the second stretching method of cable force in gonghe bridge ' s construction enrichs the principle of construction control of cable - stayed bridge, and it also offers valuable experiences for similar bridge ' s construction in future
「二次張拉到位」的索力控制方法在公和斜拉橋施工中的成功應用豐富了斜拉橋施工控制理論,為今後類似結構的大跨度混凝土斜拉橋的設計和施工提供了寶貴的經驗。In order to optimize the perpetuation tensioning tonnage of prestressed pier anchor wire of goupitan arch dam, first the scheme contrast method is adopted to define the perpetuation tensioning tonnage combination of the primary and secondary anchor wire, but the optimization result is that the pull - anchor coefficient is too big ; then the body form of the pier is optimized ; finally the anchor wire perpetuation tensioning tonnage is optimized by using ansys optimization design module based on parametric fem, the optimization result is acceptable and the pull - anchor coefficient is lowered down
摘要為優化構皮灘拱壩中孔預應力閘墩錨索永存張拉噸位,首先採用方案優選的方法確定主次錨索永存張拉噸位組合,但優選結果拉錨系數偏大,再對閘墩體型進行優化,然後採用基於參數化有限元的ansys優化設計模塊對主次錨索永存張拉噸位進行優化,優化結果滿足應力控制要求,降低了拉錨系數。Because of its peculianties in design and construction, gonghe cable - stayed bridge adopts the second stretching method as the cable force controlled method and succeeded at last
公和斜拉橋因其結構和施工的特點,在施工中採用了「二次張拉到位」的索力控制方法,並最終取得了成功。The rational cable force under dead load of gonghe bridge is calculated by the least bending strain energy method 2. cable force controlled methords are introduced. the initial construction cable force of gonghe cable - stayed bridge are calculated by trial methord based on anvance analysis 3
介紹了斜拉橋施工中常用的施工控制方法及相應的索力控制方法,分析了公和橋施工中所採用的「二次張拉到位」的索力控制方法的特點和優點,通過基於正裝分析的試算方法得出公和橋施工中拉索的初始張拉力。In the financing process, all kinds of things concerned with the project are to be considered by the loaner, which includes : developing trend, economic power, repayment ability, law, insurance and government ' s support etc. but compared with direct financing, item financing has its great advantages in economic profit brought by independent operation ( independent principal, independent capital flow ) and investor ' s stronger power to control the capital flow and limited right of recourse, it will play a more and more important role in china ' s economic construction, especially for its infrastructure
在融資過程中,所有涉及項目發展的方方面面都要納入融資者的考慮范圍,包括:發展勢頭、經濟實力、還本付息、投資回報、法律、保險、政府支持等。但與直接融資相比,項目融資由於在可獨立運作產生經濟效益(獨立法人,獨立現金流) 、投資者有更大權力控制資金流向和有限追索等方面存在較大優勢,其在中國經濟建設,特別是基礎產業建設中發揮的作用會越來越大。分享友人