羊峽水電站 的英文怎麼說

中文拼音 [yángxiáshuǐdiànzhàn]
羊峽水電站 英文
longyangxia hydroelectric power station
  • : 名詞1. (哺乳動物) sheep 2. (姓氏) a surname
  • : 名詞(兩山夾水的地方) gorge
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 水電站 : [簡] (水力發電站) hydroelectric (power) station; hydropower station水電站自動化 automation of...
  • 水電 : hydroelectricity; hydropower; water and electricity
  1. The economic operation model of long yangxia power station is established and the actual operation results in 2001 are examined

    在此基礎上,針對龍的實際情況,建立了龍羊峽水電站經濟調度考核模型,並對2001年的實際調度運行進行了考核。
  2. By analyzing interval flood and cascade operation characteristics of the upstream yellow river basin, the influence of longyangxia reservoir operation mode in different states on gongboxia power station construction during flood period is studied

    分析區間洪特性和黃河上游梯級運行特點,針對龍庫實際運行狀況,分析不同狀態下的龍庫運行方式對公伯的施工渡汛影響。
  3. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯的建設,以建設期施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和梯級庫群的實際運行狀況,對施工渡汛中的主要問題?洪流達時間、區間洪預報、渡汛風險、汛期預警、龍庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪預報方案和調度方法,為公伯施工期建設提供技術支撐。
  4. Computer monitoring system operating analysis of longyangxia hydraulic power station

    羊峽水電站計算機監控系統運行分析
  5. Through studying longyangxia reservoir reasonable operation mode, gongboxia hydro - power station ' s flood period scheme and improvement flood period standard scheme are established in this paper

    通過龍庫合理運行方式研究,確定公伯渡汛方案以及提高渡汛標準方案。
分享友人