議程項目 的英文怎麼說

中文拼音 [chéngxiàng]
議程項目 英文
agenda item
  • : Ⅰ名詞(意見; 言論) opinion; view Ⅱ動詞(商議) discuss; exchange views on; talk over
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
  • : Ⅰ名詞1 (眼睛) eye 2 (大項中再分的小項) item 3 [生物學] (把同一綱的生物按彼此相似的特徵分為幾...
  • 議程 : agenda
  • 項目 : item; article; clause; subject of entry; [體育] event
  1. Every attempt to expand the agenda is beaten down.

    每一次擴大議程項目范圍的嘗試都受到挫折。
  2. 3 the permit holder shall submit to the director for approval within a month of the operation of the projects a proposal to monitor the avifauna use of the constructed channel and implement the approved monitoring proposal

    許可證持有人須在工運作的一個月內,向署長提交一個監察在已建造渠道上鳥類活動的建,供署長批準,以及執行獲得批準的監察建
  3. Participates in product design meetings for familiarization with project requirements and objectives

    參與產品設計會以熟悉工的需要和標。
  4. Government issued a legco brief on kowloon southern link project agreement

    政府就九南線工發出的立法會參考資料摘要。
  5. At last, innovative suggestions was brought up concerning the accessory system reformation of construction enterprises project management

    最後對施工企業工管理配套體制改革提出了改進性的建
  6. Under the direction of the sciences of auditorium acoustics, the paper researches on the auditorium acoustics of the digital conference hall. on the basis of analysising the theory background, the paper researches on the practical construction project. the basic task of is to study the physical conditions of interior acoustic wave transmission and acoustic processing method approach to ensure a good indoor heard

    本文以廳堂音質的相關理論為指導,以數字會廳堂為主要研究標,以會廳堂音質設計為主要研究內容,在總結了會廳聲學設計中各個基本概念及廳堂音質設計的基礎上,對現代數字會廳堂的音質展開深入的研究,並理論結合實際,對具體的工進行廳堂音質設計與研究。
  7. 13. a summary of the findings and conclusions in the review report relating to the key reclamation components which have attracted the greatest concern or reservation is set out in paragraphs 14 to 26 below

    13 .對于最具爭和最多人持保留意見的主要填海工,有關檢討結果和結論載于下文第14至26段。
  8. In its resolution 58 / 138 of 22 december 2003, the general assembly encouraged governments to undertake preparations for the eleventh congress at an early stage by all appropriate means, including, where appropriate, the establishment of national preparatory committees, with a view to contributing to a focused and productive discussion on the topics and to participating actively in the organization of and follow - up to the workshops ; reiterated its invitation to member states to be represented at the eleventh congress at the highest possible level, for example, by heads of state or government or government ministers and attorneys general, to make statements on the theme and topics of the congress and to participate in thematic interactive round tables ; and urged the regional preparatory meetings to examine the substantive items on the agenda and the workshop topics of the eleventh congress and to make action - oriented recommendations to serve as a basis for the draft recommendations and conclusions for consideration by the eleventh congress and the commission on crime prevention and criminal justice at its fourteenth session

    大會在其2003年12月22日第58 / 138號決中,鼓勵各國政府及早以一切適當方法籌備第十一屆預防犯罪大會,包括酌情設立國家籌備委員會,以便對重點突出和成效明顯的專題討論作出貢獻,並積極參加講習班的組織及后續工作;重申請會員國指派盡可能高級別的代表,如國家元首或政府首腦或政府部長和司法部長出席第十一屆預防犯罪大會,就預防犯罪大會主題和專題發言並參加專題性意見交流圓桌會;敦促各區域籌備會審查第十一屆預防犯罪大會的實質性議程項目和講習班主題並提出著眼於行動的建,以此作為供預防犯罪大會及委員會第十四屆會的建和結論草案的基礎。
  9. The clue is the appointment of the general manager of the hh railway company - a fictitious enterprise. in the case, the situation facing the company is the " red head " documents, which put the company to the market competence, extra cost in the x program leading loss and several accidents that organizations do n ' t adapt to the competence. all of these put forward the fact that hh railway company ca n ' t adapt to the development of management system

    ? ? 「 hh鐵路工總公司」總經理上任為線索,通過其面臨的路局用「紅頭」文件,斷絕其施工任務來源,並將公司全面推向市場; x工成本過高,形成了工虧損;幾次工作會中,暴露出組織機構不適應市場競爭的幾個突發事件,提出了「 hh鐵路工總公司」的經營管理,無法適應經營需要的案例問題事實。
  10. Agenda item deferred from the meeting held on 25 may 2001

    2001年5月25日會押后討論的議程項目
  11. Agenda items deferred from the meeting held on 25 may 2001

    2001年5月25日會押后討論的議程項目
  12. Agenda item 7

    議程項目7
  13. Agenda item 4

    議程項目4
  14. Agenda items marked with asterisk are deferred from the meeting held on 6 june 2007

    注有號的議程項目為2007年6月6日會押后討論的
  15. Note : all five agenda items are deferred from the last pwsc meeting held on 30 january 2002

    注:五個議程項目均為2002年1月30日會押后討論的
  16. The deadline for proposing agenda items for a meeting is normally 5 : 00 pm on the tuesday before the meeting

    提出每次會議程項目的限期通常為該次會行前的星期二下午5時。
  17. Other agenda items include improvement works to tung ping chau public pier, the proposed tin shui wai special area, and a study on wetland compensation

    其他議程項目包括東平洲公眾碼頭改善工、建中的天水圍特別地區和濕地彌償研究。
  18. Drainage improvement in southern lantau in attendance for 102cd, 119cd and 128cd : director of drainage services chief engineer drainage projects, drainage services department

    就102cd 119cd和128cd三個議程項目出席會的人員:渠務署署長渠務署總工師排水工
  19. Public officers in attendance of all items : permanent secretary for the environment, transport and works works permanent secretary for housing, planning and lands planning and lands director of environmental protection acting

    就所有議程項目出席會的公職人員:環境運輸及工務局常任秘書長工務房屋及規劃地政局常任秘書長規劃及地政署理環境保護署署長
  20. In attendance for 28ea and 57ec : deputy secretary, education and manpower bureau principal assistant secretary infrastructure research support, education and manpower bureau chief technical adviser subvented projects, architectural services department

    就28ea和57ec兩個議程項目出席會的人員:教育統籌局副秘書長二教育統籌局首席助理秘書長基礎建設及研究支援建築署總技術顧問資助工
分享友人