起重線 的英文怎麼說

中文拼音 [zhòngxiàn]
起重線 英文
lift line
  • : 起Ⅰ動詞1 (站起; 坐起) rise; get up; stand up 2 (取出; 取走) draw out; remove; extract; pull 3...
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 起重 : jack up起重臂 jib loading boom; cargo boom; erector arm; jibboom; 起重車 carriage hoist; crane ca...
  1. With the standardized workshop occupied 11600m2 and 630t hydraulic presses, 315t two axle punch presses, 250 sets of large, middle, small equipments, the company has the whole series production line. main equipments include cut - board machine, incurvate machine, opened incline pressure machine, drill attack machine, auto - moving hang machine, various kinds of moulding plastic machine, lathe, planer, drilling machine, horizontal axis rectangle platform flat grinder, universale lifting platform milling machine, eccentricity axis punching machine, liquid pressure derrick car, etc

    主要設備有: 630噸液壓機315噸雙軸沖壓機250噸沖壓機等大型沖壓機床,剪板機折彎機鉆攻兩用機自動走軌吊機各式型號注塑機各式車床刨床鉆床臥軸矩臺平面磨床萬能升降臺銑床偏心軸沖床液壓車等大中小設備386多臺套,形成具有自動沖壓步進的生產
  2. Traveling cranes, drying furnaces, transformer wiring facilities, transformer automatic inspection machines, pressure meters, insulation resistance meters, ac dc stabilized power sources, memory high coder brightness meters, light meters, film thickness meters, noise meters, hand thermometers

    機,乾燥爐,變壓器卷設備,變壓器自動檢查機,耐壓計,絕緣電阻計,交流直流穩定性電源,內存快速編碼器亮度計,光度計,膜厚計,噪音計,手指尖溫度計
  3. Crane hoist line speed and power test code

    機提升速度和功率試驗規程
  4. Circuitry construction tools produced by our company are more than eight hundred of kinds in 18 series, which are suitable for foundation construction, tower group sets up the pole 、 a thread constructs 、 cable construction, optical cable construction, such as entangle and rub flexibly 、 insulating aerial cable and cable skinning device 、 aluminiam alloy cherishes the pole 、 and lead 、 card thread device of ground wire 、 high strength shackle 、 ratchet wheel board hands with sharp board hands 、 tight line device of double hook 、 lifting block 、 nylon wheel and aluminium wheel is pat the thread coaster, and etc, with full series and more kinds. as high technology and reliable quality, we have a good reputation among sane fields at home and abroad

    公司生產的路施工機具包括用於基礎施工,桿塔組立、架施工、電纜施工,光纜施工等工序的18大類800餘種產品,如機動絞磨、絕緣架空電纜及高壓電纜剝皮器,各類鋁合金抱桿,以及導、地器、高強度卸扣、棘輪扳手與尖扳手、雙鉤緊器、滑車、尼龍輪或鋁輪放滑車等,系列全、品種多,產品具有工藝精湛,質量可靠等特點,在國內外同行業中有較高的信譽。
  5. Most advanced chain making manchines from germany and the up - date manufacturing technology from japan, we always guarantee our design and quality control following the step of times and enhance the share of international market, that is the reason why our corp can smoothly obtain the approval of iso9002 in 1999, as well as ce approval later on, also it can explain why we are the first and only one that successfully get the germany certificate of gs for hoists in china

    公司憑借第一流的技術隊伍和當今世界最先進的德制鏈條生產,引日本製造技術,已於1999年成功通過iso9002質量體系認證及隨后的歐共體產品「 ce 」安全認證,同時,雙鳥機械還是中國同行業中首家獲得德國「 gs 」產品認證的企業。
  6. Product feeding line lift equipment

    生產輸送設備
  7. Technical specifications for yzrf and yzrg range of forced - ventilated wound - rotor three - phase induction motors for crane and metallurgical application

    Yzrf yzrg系列及冶金用強迫通風型繞轉子三相異步電動機技術條件
  8. The ansys, a kind of fea program, was used to build model of small carriage. the procedure of gantry beam bump with secondary beam of bridge was reappeared by running nonlinear calculation and loading program which was written by apdl program language. the closest deforming result was gotten, and the deforming of main beam, secondary beam and end beam and inner stress distribution status were calculated

    採用大型三維有限元軟體ansys對該機以及小車架等進行了建模、應用apdl語言編寫加載程序、進行非性計算,再現龍門橫梁與機副梁碰撞過程,最後得到與實際變形結果最接近的一種狀態,得出機橋架主梁、副梁、端梁的變形以及其內部的應力分佈情況。
  9. Structural standards for steel gin poles used for installation of antenna towers and antenna supporting structures

    塔和天支撐結構的安裝用鋼把桿的結構標準
  10. Through analyzing the two cases of protection malfunction due to incorrect connection of open - delta connection of busbar voltage transformer, the importance of correct connection of open - delta connection when earthing fault occurring in a power system was explained

    摘要通過分析兩電壓互感器開口三角形接錯誤引的保護不正確動作,從而說明在系統發生接地故障時電壓互感器開口三角形接正確的要性。
  11. Reform of the sliding wire of bridge type hoist

    橋式機滑導的改造
  12. On basis of the producing fact of kiu ming heavy machine ltd, the author get much fact material through inner research, and presents a imagine of new corrugated - web structure of overhead traveling crane. through enough compare and argumentation, this paper presents using sine curve as corrugated sheet of web

    作者根據昆明機股份有限公司的生產實際,深入調查研究,在掌握大量生產應用實際的資料基礎上,提出了橋式機的箱形主梁的新型波形腹板結構的設想,並在充分比較和論證的基礎上提出了以正弦曲波形作為腹板的波形。
  13. This article considers that emancipating the mind, renewing the concept and preparing for the new development of the west region must strengthen the understanding to the concept itself ; strengthen studying ; break the conservative ideas, set up the new concept of reformation and opening leaders should take important effect ; must overcome the idea of waiting depending and asking for and set up the idea of keeping forging ahead ; must break down the idea of rank according to their qualification not stick to one pattern to choose talents ; must set up the concept of the market competition and innovation ; must follow the massline ; must accept the test of social practice

    摘要本文認為,解放思想,更新觀念,迎接西部大開發,必須加強對思想觀念本身的認識;必須加強學習;必須打破封閉保守意識,樹立改革開放的新觀念;領導者要要作用;必須克服「等靠要」思想,樹立開拓進取意識;必須打破論資排輩、求全責備思想,不拘一格選擇人才;必須樹立市場競爭以觀念和創新意識;必須走群眾路;必須接受社會實踐的檢驗。
  14. Technical specification for yrez range of conical - rotor braking three - phase induction motors for crane application

    Yrez系列用錐形繞轉子制動三相異步電動機技術條件
  15. Technical specification for yzr - z range of special - purpose wound - rotor three - phase induction motors for crane application

    Yzr - z系列專用繞轉子三相異步電動機技術條件
  16. Yzr range of three - phase slip - ring rotor induction motors for crane and metallurgical application technical specifications

    Yzr系列及冶金用繞轉子三相異步電動機.技術條件
  17. Yzr2 range of three - phase slip - ring rotor induction motors for crane and matallurgical application technical spcifications

    Yzr2系列及冶金用繞轉子三相異步電動機.技術條件
  18. Technical specification for yzrsw range of three - phase eddy - current brading wound rotor induction motors for column crane application

    Yzrsw系列塔式機用渦流制動繞轉子雙速三相異步電動機技術條件
  19. Technical specification for yzrw range of eddy - current braking wound - rotor three - phase induction motors for crane and metallurgical application

    Yzrw系列及冶金用渦流制動繞轉子三相異步電動機技術條件
  20. On the base of choosing proper model and designing route, it uses cad and probes into an efficient and easy design way to enhance design efficiency and shorten design periods. it brings in the way of multiple - objective optimization and gives proper optimization model and algorithm to get a comparative satisfying result. and it applies system simulation to cable crane design and gives the simulation model and arithmetic of the freight track

    本文針對此問題,引入現代的設計方法:在選取合適的模型和設計路的前提下,運用計算機輔助設計,研究探討高效便捷的設計方法,大大的提高設計效率,縮短設計周期,節約成本;引入多目標優化的思想,提出合理的優化模型,給出了實現演算法,得到了比較滿意的結果;引入系統模擬的設計理念,給出了荷軌跡的模擬模型實現演算法和程序,對荷軌跡進行了計算機模擬,提高了纜索機布置的效率和質量,提高了生產的安全性。
分享友人