載荷調節 的英文怎麼說

中文拼音 [zǎidiàojié]
載荷調節 英文
load responsible control
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 荷名詞(蓮) lotus
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 節構詞成分。
  • 載荷 : load; loading載荷變化 load fluctuation; variation in load; 載荷裝置 load device
  • 調節 : regulate; adjust; monitor; measure; take care of; condition; regulation; adjustment; conditioning...
  1. The smart rotor with active trailing edge is a new system for reducing the vibration which can adjust the air load of the blade to actively counteract the main harmonic of the force to the fuselage by controlling the deflection of the trailing edge

    主動后緣附翼控制是一種較新的旋翼減振系統,它通過控制后緣附翼的偏轉,調槳葉的氣動,實現對機體激振力主要諧波分量的主動抵消。
  2. 2. using cfd software - fluent, many flow states were been simulated. these states are the influence of nozzle structure with the flow, the distributing characteristic of inside flow, the influence of cold gas flow and outside flow with the work of the nozzle, the change of inside pressure load when the nozzle regulates

    2 、藉助cfd軟體fluent ,計算出可調噴管本身結構對流動的影響、可調噴管流場的參數分佈、冷卻氣流對噴管流動的影響、外流對可調噴管內流的影響、噴管的冷流流場和噴管調過程中內壁面的壓強變化。
  3. Span and deadload are adjustable at the yard

    量程和極限可以現場調
  4. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的地質環境與工程實際情況,在充分考慮水對庫岸滑體穩定性影響的前提下,提出了一個適用於長江三峽庫岸滑坡體穩定性分析的綜合分析評價體系,並取得了如下幾個方面具有工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,水的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下水位升高降低了滑坡體的有效應力,另一方面是由於地下水的長期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對三峽庫區的特殊條件,系統分析了作用於三峽庫區滑坡體上的力系和庫水位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m庫水位、地震以及庫水位由175m調下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用的計算方法,使在庫區岸坡滑體穩定性分析評價時對計算工況選擇及其作用的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於重慶市豐都縣名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對三峽庫區的滑坡穩定性分析是實用可行的。
  5. The control parameters influenced the loads of the stall wind turbine small. but it will be bigger to the variable pitch wind turbine and the variable speed wind turbine

    對于bladedforwindows軟體,定槳距失速調型風力發電機組控制參數的輸入量比較少,對機組的影響也比較小。
  6. The centrifugal pump for oilfield waterflooding and oil transfer worked with low pump efficiency owing to unstable load and its energy loss is fairly large

    油田注水集輸系統離心泵由於經常變化,大多不能在其額定工況點工作,泵效低,且需要用泵出口閥調流量,產生一定的泵管壓差,造成較大的能量損失。
  7. Test method for acoustic emission testing of insulated aerial personnel devices with supplemental load handling attachments

    帶附加載荷調節裝置的航空人員隔音裝置聲發射檢驗的試驗方法
  8. Standard test method for acoustic emission for insulated and non - insulated aerial personnel devices without supplemental load handling attachments

    無附加載荷調節裝置的航空人員隔音和不隔音裝置用聲發射的標準試驗方法
  9. Standard test method for acoustic emission testing of insulated and non - insulated aerial personnel devices with supplemental load handling attachments

    帶附加載荷調節裝置的航空人員隔音和不隔音裝置聲發射試驗的標準試驗方法
  10. Statistic analysis on fatigue load effect and equivalent stress range of steel crane structures in service is carried out. the stress range distribution in whole life is deduced by the spot measurement little sample stress - time process. meanwhile the statistic analysis on the fatigue resistance process is conducted, according to fatigue data of all kinds of structural joints in domestic and overseas, which is foundation with, establish the fatigue reliability model

    2 、在大量調查的基礎上,對吊車梁所承受的疲勞效應與等效等幅應力進行了統計分析,同時根據國內外有關各構造細的疲勞資料對疲勞抗力參數進行了統計分析,為建立疲勞動態可靠性分析模式奠定基礎。
  11. The new unit has following technical features : ( 1 ) the unit ' s load is balanced by means of the accumulator and hydraulic cylinder with special structure ; ( 2 ) the installed power of the unit can be reduced greatly by adopting the accumulator ; ( 3 ) variable frequency speed regulation ensures good energy saving effect, and the closed oil circuit requires less hydraulic oil ; ( 4 ) a bi - directional hydraulic lock in the oil circuit ensures the stability and safety of the operation of the pumping unit

    新型機具有4個技術特點: ( 1 )由於活塞柱塞式液壓缸的特殊結構和液壓蓄能器的配合使用,在平衡抽油機大部分時,不需另外增加配重,可減小抽油機體積、質量和佔地面積; ( 2 )抽油機下沖程時,與活塞柱塞式液壓缸相連接的蓄能器吸收能量,上沖程時儲存在蓄能器中的能量補充上行所需的能量,大幅度降低抽油機裝機功率; ( 3 )利用變頻容積調能效率高,閉式油路省液壓油,同時大大減小液壓泵站的體積; ( 4 )在閉式油路中採用雙向液壓鎖可使抽油機的啟停更加平穩、迅速,其工作的穩定性和安全性更好。
  12. Because of forecasting reactive load at first, it can detect the change of voltage at low - voltage bus from the change of reactive load or the change of voltage at high - voltage bus, then it can decide that adjusting transformer tap or capacitor switch, and avoid blindly and deficient adjusting. on the condition the reactive power is balanced and voltage qualified, it can realize the switching times of loaded taps and capacitors being efficiently decreased

    由於預先預測出無功負,提前了解了無功功率變化的趨勢,可以有助於判定低壓母線電壓變化是由無功負變化引起還是由高壓側電壓變化引起,從而適時決定是調調壓變壓器分接頭還是投切電容器,以此避免了盲目和不充分的調,實現在保證無功基本平衡和電壓合格率的前提下,減少有調壓變壓器分接頭的調和並聯電容器組的投切次數。
  13. It was known from the analysis of ductility coefficient that all specimens of overlapped joints other than sj3 one possessed a better ductility and lower deformation rate of the joints under repeated action of loads compared to that under monotonic loading

    由延性系數分析可知除sj3的延性系數較低外其餘搭接點試件具有較好的延性;承受反復作用時與單調時相比點變形率低。
  14. According to the characteristic of nine - area diagram of substation vol / var coordinated control, this system gives the defination of fuzzy sets and the degree of membership of input / output variables, and designs corresponding control rules. the results of simulation demonstrate the system can satisfy the constrains of the day - adjusting times of the switching of on - load transformer and paralleled compensation capacitors, and ensure voltage quality, reactive power basical balance. considering the var requirement in different load time period and the control demand in load saltation, a improved control scheme is provided. the results of simulation show the improved scheme can meet the demand of vol / var in different load time period, protect the wrong operation when either voltage or reactive power appears saltation, and decrease the times of regulation of the switching of on - load transformer and paralleled compensation capacitors finally, a background software module of substation vol / var coordinated control is designed, based on the supervisory control and data acquisition system of substation

    模擬結果證明該系統能在各種負條件下確保電壓合格和無功基本平衡,且能滿足變電站對有調壓變壓器分接頭日調次數和並聯補償電容器組的日投切次數的限制。通過考慮不同負時段對無功功率的需求和負突變情況下的控制要求,對上述模糊控制策略進行了改進,模擬結果證明改進后的控制策略能滿足不同負時段對電壓和無功的要求、抑制電壓或無功突變情況下的誤動作,且有效地減少了有調壓變壓器分接頭和並聯補償電容器組的調次數。最後基於變電站scada系統設計了一后臺電壓無功綜合控制軟體模塊。
  15. 2, the friction coefficient at the pitch point is not a monotonic quantity of the rational speed or the load, instead of having a maximum value. and the value of the friction coefficient is very small, its order of magnitude only being 10 - 3. so, it is reasonable that the friction force on teeth surfaces are ignored when the gear - driven contact fatigue strength is designed

    2 、當輪齒在點嚙合時,隨著轉速或的變化,齒面摩擦系數並非呈單調變化,而是存在極值點;點嚙合處的齒面摩擦系數很小,其數量級為10一, ,因此在做齒輪強度設計時,忽略齒面摩擦力的影響是有理論根據的。
  16. Rod bodies, flight control in aluminium alloy, for adjustable end fittings - dimensions and loads

    飛行控制可調終端配合鋁合金桿.尺寸和
  17. In this article, the author attempts to obtain the gain of kp and ki of the pi regulator through building the model of the wind turbine, then input the parameters to the bladed

    通過對我單位正在研製的主動失速風機進行建模,採用pi調器控制,運用bladed軟體對機組的進行模擬。
  18. By way of these tendons, precest beams and columns can be assembled conveniently, and the joints and frame are monolithic and continuous. consequently, compared with common reinforced concrete frams, this kind of frame systems possess higher reliability and solved the problems in the process of assembling prestressed concrete frames. also it forms the framework of subassemblage and prestressed concrete frames, and explores a new way for industrial production of prestressed structures. by analyzing this system, a series of conclusion are provided, incluing modulation of bending moment produced by vertical loads within beam end, secondary internal forces produced by pretress force, shear resistance of the end of beams, the influence of lateral restrains. theresearch results of this paper are proved to be practical. some advices are also brought forward on the design process

    后張預應力筋既可作為施工階段拼裝手段,又可在使用階段承受梁端彎矩,構成整體受力點和連續受力框架,克服了裝配式點受力可靠性差的缺陷,解決了預應力混凝土框架難以裝配的問題,形成預制預應力混凝土裝配整體式框架,開辟了預應力結構工業化生產的新途徑。本文針對預壓裝配式預應力混凝土框架,從豎向作用下的梁端彎矩調幅、施加預應力在框架中產生的次內力、梁端抗剪承力、考慮側限的無側移框架的承力分析四個方面對該種裝配式結構體系的性能做了詳細的研究。
  19. Pile and raft take the load of buildings together. it possesses good whole, high vertical capacity, small settlement of foundation and well performance of balancing differential settlements. it could bear large wind or seismic induced horizon load, and could have large capacity of resisting inclination

    樁筏基礎同時具有樁基礎和筏板基礎的優點,樁一筏共同承擔建築物的,它具有整體性好、豎向承力高、基礎沉降小、調不均勻沉降能力強的優點,同時可以承受風或地震引起的巨大水平力,抗傾覆能力強。
分享友人