輻射段爐管 的英文怎麼說

中文拼音 [shèduànguǎn]
輻射段爐管 英文
heating tube in section of radiation chamber
  • : 名詞(車輪中車轂和輪圈的連接物) spoke
  • : Ⅰ動詞1 (用推力或彈力送出) shoot; fire 2 (液體受到壓力迅速擠出) discharge in a jet 3 (放出) ...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 輻射 : radiation; exposure; radio; beaming
  1. Abstract : the in servie tubular heaters built early in refineries and chemical plans have low thermal load and low heat efficiency, therefore measures for technical reform are offered, including ( 1 ) enlarging the surface area of convection tubes to increase the thermal load of rhe convection section ; ( 2 ) increasign the heat interchanging area of radiant tubes ; ( 3 ) changing the height of the chimney ; ( 4 ) using new burner with forced air supply to increase calorific capacityu ; ( 5 ) adding air preheater between the convection section and chimney to enhence the temperature of the air entering the furnace ; ( 6 ) adopting high temperature radiant coating to improve the effect of radiant heat interchanging

    文摘:針對早期建造的煉油廠和化工廠在役式加熱熱負荷和熱效率低的狀況,提出了若干技術改造措施包括,增大對流表面積以增大對流的熱負荷;增加的換熱面積;修正煙囪高度;換用新型燃燒器,變自然通風為強制供風,以增大燃燒器的發熱量,減小過剩空氣系數,節省燃料2 % 3 % ;在對流和煙囪之間增設空氣預熱器以提高空氣入溫度;採用高溫塗料增強換熱效果,從而增加熱源對壁的傳熱量和的傳熱量等。
  2. The in servie tubular heaters built early in refineries and chemical plans have low thermal load and low heat efficiency, therefore measures for technical reform are offered, including ( 1 ) enlarging the surface area of convection tubes to increase the thermal load of rhe convection section ; ( 2 ) increasign the heat interchanging area of radiant tubes ; ( 3 ) changing the height of the chimney ; ( 4 ) using new burner with forced air supply to increase calorific capacityu ; ( 5 ) adding air preheater between the convection section and chimney to enhence the temperature of the air entering the furnace ; ( 6 ) adopting high temperature radiant coating to improve the effect of radiant heat interchanging

    針對早期建造的煉油廠和化工廠在役式加熱熱負荷和熱效率低的狀況,提出了若干技術改造措施包括,增大對流表面積以增大對流的熱負荷;增加的換熱面積;修正煙囪高度;換用新型燃燒器,變自然通風為強制供風,以增大燃燒器的發熱量,減小過剩空氣系數,節省燃料2 % 3 % ;在對流和煙囪之間增設空氣預熱器以提高空氣入溫度;採用高溫塗料增強換熱效果,從而增加熱源對壁的傳熱量和的傳熱量等。
分享友人