連續接力 的英文怎麼說

中文拼音 [liánjiē]
連續接力 英文
endless relay
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ形容詞(連接不斷) continuous; successive Ⅱ動詞1 (接在原有的后頭) continue; extend; join 2 (...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 連續 : continuation; succession; series; continuity; continuing; running; continuous; successive; contin...
  • 接力 : relay
  1. This article offers a method for solving the frictional drag, that is, according to the various buckled shapes of coiled tubing in different hole sections, working out the mean contact counterforce in a screw pitch in solving the radial contact counterforce

    求解摩阻時,可針對油管在井身中不同結構段的不同變形形狀,採用求解徑向觸反時求一個螺距內平均觸反的方法加以解決。
  2. Secondly, detailedly analyzing reasons inducing these problems, author finds it is that not thinking of the slope of pipeline and the friction in the process of producing water hammer pressure functions, but, thinking of the effect of the slope of pipeline in the process of producing the consequent water hammer calculative continuity function, which results in the inconsequent illogicality in the whole process of producing

    著,對這些問題存在的原因進行了詳細分析,發現在當前推導水擊壓強公式的過程中沒有考慮管道的傾斜度和摩擦阻的影響,而在後面水擊計算的性方程的推導過程中則考慮了管道的傾斜度,這就導致了在當前性方程的整個推導過程中前後矛盾的不合理現象。
  3. This paper have studied some questions which included distributed load, lapped length, becoming less crowded purlins each other in the lap joints, mechanic analysis, lateral buckling and ultimate load - carrying capacity and construction of double purlin in the lap joins. according to result of test and analysis of theories, the author advances the suggestions, which may be a reference to steel structure design

    文章對z型檁條荷載分佈、搭長度、搭嵌套松動、側向穩定以及構件極限承載和雙檁條的構造等問題進行了研究,並根據試驗結果和理論分析提出了建議。
  4. Energy consume, electric strength, insulation resistance, ground conductivity, leakage current, microwave leakage, power input, normal temperature, humidity treatment, glow wire, horizontal flame, vertical flame, tracking, ball pressure, rainproof, water splash, dustproof, salt fog, endurance, motor load test, cord flexing, cord pulling, pull & torque test, lamp replacement, construction check etc

    能耗、電氣強度、絕緣電阻、性、泄漏電流、微波泄漏、功率、溫升、濕熱試驗、灼熱絲、水平燃燒、垂直燃燒、漏電起痕、球壓試驗、防雨淋、防濺水、粉塵、鹽霧、耐久性(壽命)試驗、電機負載試驗、電源線彎折、電源線提拉、拉扭測試、燈頭互換性、安全結構檢查等。
  5. Nevertheless, in these approaches the contact intethee are charactered sboly ed stiffeess k. and k. " which is not perfect and rigorous in thc vitw of solid mechanics and rather rough for the description of the behavior of the idtfores. in collbet, taken as a contact problem, the principal chatrs of the idtcthees can be reflected : ( l ) the cbntact inifore is of shear strength which implies tha a generic pair of contact points on the inidse will displace coincidentally if the tangential fbrce at this point has not reahed the 1imit resistance, else, relative s1ide betwee the points will occur along the tangental direction. ( 2 ) no matter the relative slide occurs or not, the contact bodies cannot invade each other in any wise

    本論文在對這兩種方法進行認真的分析后,說明它們對不面的描述並不合理,也無法反映出不面的主要學特性,同時指出,將帶有不面的巖土工程問題作為觸問題計算更為合理,它可將不面受變形的主要特點反映出來,即: ( 1 )觸面具有相應的「抗剪強度」 ,即當觸面上某一點處的切向應小於該點處的抵抗強度時,點對共同變形;達到強度時,則沿切向發生相對滑動; ( 2 )在整個變形過程中,發生觸的變形體不能相互侵入。
  6. Then fourier transformation is employed to solve equations of motion of the rings, bulkheads, stringers and fluid respectively, with their reactions ( moments ) expanded by the shell ' s in - vacuo modes. by means of continuity conditions on the interfaces between the shell and the stiffeners as well as the fluid, and inverse fourier transformation, the modal reactions ( moments ) are finally expressed by the shell ' s modal velocities

    然後用fourier變換分別求解環肋、艙壁、縱骨和流場的運動方程,將它們對殼體的作用矩)用殼體周向模態展開,利用它們與殼體在處位移條件以及fourier逆變換得到用殼體速度表示的模態相互作用矩) 。
  7. This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action

    考慮了乞今最為全面的初始條件和邊界條件,包括模擬壩體的實際升程過程,考慮了新老混凝土觸面上的初始溫度不,逐日的氣溫變化,混凝土的入倉溫度,水化熱溫升,邊界保溫,水庫蓄水過程,澆築間歇以及灑水養生等因素;應場的計算考慮了混凝土的自重,靜水壓,溫度應,常態混凝土與碾壓混凝土不同的自生體積變形,混凝土的彈性模量隨齡期的變化以及徐變的作用。
  8. The research aims at the demonstration and the mend of the design on the new purifier and presents a calculation method for solving the two - phase flow in fluid machine by the finite element method. after analyzing the two - phase flow in the new purifier by means of the continuum model, poisson equation, navier - stokes equation and continuous equation are derived and solved by using the finite element method. the solution on pressure, velocity and particle concentration simulates the departure well between oil and water, which proves the accuracy of the design on the new purifier

    本文採用兩相流介質模型,由兩相分離流動理論得到控制方程,採用chorin的直速度-壓mac法的思路,對新型油水分離裝置內油水兩相流動作了細致的分析,同時首次把科氏慣性引入兩相流模型中,進行分析和計算,將研究擴展到三維,並用有限元法分別解poisson方程、 n - s方程、方程的方法,對流場內壓場、速度場、濃度場進行了分析和計算,較好地模擬了新型油水分離裝置內油水分離的現象,證明了設計方案的正確性。
  9. The devices for detecting phase - to - ground fault in ineffectively grounded systems are seldom functionary at present. based on thousands of experiments in high - voltage laboratory in north china electric power university, the reasons for misjudgment and the effective measures to avoid it are presented in this paper : to change pt connection form to prevent from ill - effects of ferro - resonant overvoltage ; to increase soft measures to resist against interference ; to adopt neural network method to obtain the virtual value of the detect way

    依據上千次實驗,我們找到了一些導致選線誤判的影響因素,並提出幾點防止誤判的措施,包括改變pt線方式,避免鐵磁諧振對選線的影響;通過對故障檢測方式的處理和使用判斷技術增強裝置的軟體抗干擾能;嘗試採用神經網路演算法設定選線方法的有效域等。
  10. ( 3 ) it is known that load effect is not consistent with the section resistance incommon section continuous composite beam. a kind of composite beam with itsrational section size is suggested, which is consist of the t shape concrete beam andsteel girder. this kind of composite beam not only has enough carrying capacity, almost has same positive and negative resistance moment, but can decrease theamount of the steel

    ( 3 )分析可知組合梁的跨中、支座截面處荷載作用效應及截面抗規律不匹配,本文提出了採用t形混凝土梁和工字鋼代替一般的混凝土板和工字鋼的組合梁截面形式,並給出了截面尺寸比例,能使正負截面抵抗矩近,符合組合梁受特徵,減少了材料用量,滿足承載和剛度等要求。
  11. On the long working step, internal force of beam - on - foundation can be calculated as inverse continuous beam on cutting slope surface operated by slope pressure with linear distribution

    在工作階段,可直按倒扣于坡面上的梁來計算地梁內
  12. Yet, in the present cycle, the lag lasted for around a year and the recovery in loan growth has not been anywhere near as pronounced as the economic recovery

    可是,在目前的經濟周期中,兩者的時間差距近一年,反彈的度也有天壤之別。本地貸款兩年收縮,是絕無僅有的。當然,
  13. In recent years, the company has finished a series of key projects of provincial level in order to " create a famous brand and expand the scale ". during 1997 - 1999, it accepted many decorating projects for many famous buildings one after another like jinan longquan building, shandong civil administration building, jinan qilu gold shop and jinan yinzuo commercial building. it has become a new born strength army in the building trade by its novel decorating style, high - quality construction quality and perfect after - sale service

    近幾年公司為「創品牌、上規模」 ,精心施工,完成一系列省市級重點工程, 1997 - 1999年間,先後承了濟南市龍泉大廈、山東省民政大廈、濟南市齊魯金店、濟南市銀座商城等知名項目的裝飾工程,並以新穎的裝飾風格、優質的施工質量、完善的售後服務成為建築行業中的一支新生軍。
  14. Meanwhile, a modified newmark difference scheme and computational procedures has been proposed for fem dynamic incremental load method to the non - linearity of geometry and material

    其後,對撞擊觸的動學數值計算原理及關鍵理論方法在介質學框架下進行了初步研究與歸納。
  15. The use of time delays on these vehicles helps to eliminate transmission and motor damage by providing even and controlled acceleration. the delay is adjustable between 0 to 5 seconds and can be wired independently of other delays or alternatively these delays can be wired in cascade so that it is necessary for the first delay to switch on before the following commences timing etc. suppression is included in the delay circuit to prevent damage by voltage transients

    延遲開關可以調整延遲時間0 ~ 5秒,並可數個延遲開關來逐步控制動作之時間(復數時,第一個開關要啟動下來的開關才會跟著動作)避免電動車起動初期之電脈沖,達到平順的起步動作,可預防電壓無端變動造成之電路故障
  16. We are trying our best to develop a system of collective leadership and a flow of successors

    我們努在發展集體領導體系及班人們出現。
  17. An interface analysis model was established based on the interface stress element method for discontinuous medium mechanical problem to simulate the pull - out tests and tensile tests, and the calculated results are in good agreement with those of experiments

    應用解決不介質學問題的界面應元法建立交界面的分析模型,對拔出試驗和拉伸試驗進行了數值模擬,數值模擬計算結果與試驗結果近。
  18. The slip between the concrete slab and the steel girder of complete - shear - connection prestressed steel - concrete composite beams is small enough to justify the assumption of complete interaction between the interface under service load

    按完全剪設計的預應組合梁的界面滑移很小,在正常使用階段,可以認為組合截面整體共同工作。
  19. With different clearance value, displacement curves and velocity curves of generalized coordinates as well as slider displacement error curves in a motion period are obtained. these curves are discussed. results show that if manufacturing cost is kept invariableness, in order to improve precision of mould - cuting, fitting precision of joint connecting the crank and coupler has priority to be considered to increase

    採用四階rong - kuta法求解觸模型的動學方程,得到了一個運動周期內運動副間隙取不同值時,各廣義坐標的位移、速度曲線和滑塊位移誤差曲線,並通過曲線分析,得出了要提高模切機主切機構精度,在相同加工成本條件下,應優先考慮提高曲柄與桿鉸處的配合精度的結論。
  20. Direct identification of the parameter model of continuous dynamic system using hartley transformation

    變換實現學系統參數模型直辨識
分享友人