進水管道 的英文怎麼說

中文拼音 [jìnshuǐguǎndào]
進水管道 英文
intake conduit
  • : 進構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 進水 : admission pipe
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  1. Compound quick air inbreathe - release valve for water supply pipeline

    復合式高速排氣閥
  2. It includes two aspects in content : one is the best choice for plane disposal of pipeline, and its methods follows as decision - making plot, simple trapeziform and optimizing trunkform etc ; the other one is optimizing pipe parameter when the plane disposal of pipeline has been fixed, and the methods of which are linear programming, unlinear programming, dynamic optimizing, direct optimizing, hereditary arithmetic and so on

    網優化設計包括兩個方面的內容:一是線平面布置的優化選擇;其方法有:決策圖法,簡約梯度法,優化樹法等。二是在線平面布置已定情況下參數的優化;其方法有:線性規劃法,非線性規劃法,動態優化法,遺傳演算法,直接優化法等。
  3. The tai po water treatment works together with the butterfly valley primary service reservoir in kowloon and the 12km long treated water aqueduct connecting the two waterworks form the tai po water scheme. this is one of the biggest water supply projects that the water supplies department ( wsd ) has undertaken in recent years

    大埔濾廠連同九龍的蝴蝶穀食主配庫,以及連接濾廠和配庫的十二公里長食,組成大埔濾廠供計劃,是務署近年來行的其中一項最龐大的供工程計劃。
  4. With regard to the second phase water supply pipe project of no. 4 dongguang waterworks, an introduction was given to the selection of pipe jacking system, measures for resistance alleviation, application of intermediate jacking room, and control of axes in jacking construction of long distance steel pipe with large caliber, these may provide the reference for the construction of resembling project

    摘要結合東莞市第四廠二期給工程過107國段的頂施工,介紹了大口徑鋼行長距離頂施工時頂機的選型、減阻措施的選用、中繼間的運用、軸線控制等問題,可供以後同類工程參考和借鑒。
  5. Gas thermal insulation coefficient under different transient flow in pressure pipeline system has been studied through physical experiments and theoretical analysis on thermodynamics

    本論文通過物理試驗與熱力學理論分析對不同瞬變過程中有壓輸內氣體的多方指數n的變化規律行了研究。
  6. Moreover, we also gave some theoretical studies on the resistant pipe - pushing construction technique for middle and long distance high pipes in sand soil layers, from which not only the difficulties in the rain pipe construction problem in jianyu road of yulin city have been overcome successfully, but also the new and valuable techniques and experiences for the pipe - pushing construction in sand soil layers have been obtained

    試驗研究表明上述技術措施的有效性,同時還對砂土層中長距離頂法施工技術行了一定的理論探討,從而使榆林市建榆路雨法施工開始完全不能尺的僵局予以打破而且為砂土地層中頂法施工提供了新的技術和經驗
  7. And the relation between these velocity was analyzed at last. this is the conclusion : ( 1 ) the distribution of the velocity and concentration are get in the open channel flow and as the sewage flow is gravity flow, the equations is fit for this too. ( 2 ) generally speaking, the self - cleaning velocity should be the starting velocity, and it could fit for the self - cleaning target in limited sense theoretically, but when facing some higher requirement, it is not large enough

    最後結合污流動的最小設計流速與顆粒起動流速、臨界不淤流速的關系行了分析,結論如下: ( 1 )文中所得出的速度分佈與濃度分佈是在明渠兩相流動情況下推得的,由於污流動多為重力流,是明渠流中的一種,所以文中的分析在認識污流動特性方面具有一定的參考價值。
  8. An analysis is made of the causes for the problems of the decrease in quench water flowrate, abrasive wear of the coal water pipes, and blockage of the heat exchanger for ash water and the revamp measures, and after an inquiry into them, improvement measures are proposed

    摘要對氣化裝置激冷流量的降低、黑磨損、灰換熱器堵塞問題的產生原因及改造措施行分析和探討,提出改措施。
  9. In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account

    本文根據南椏河姚河壩電站的設計方案,對輪機調節系統,按長引復雜引系統、彈性擊、調速器為pid調節規律,在小波動情況下,對包括引、調壓井、尾輪機、發電機、調速器在內的輪機調節系統建立數學模型,並計及引力摩阻損失,對輪機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序行計算機模擬計算。
  10. Carefully clear inlet piping system of foreign matter and mount regulator with the flow arrow pointing in the direction of flow

    小心清洗系統的外來物質,安裝調節閥時要使得流箭頭指向流方向。
  11. Based on optimization theories of genetic algorithms and the linear programming, a series of optimal design mathematics models and methods of water transmission conduits and water distribution networks have been presented, in the light of their characteristics. the results are as follows : 1 the linear programming models and calculations of the pressure gravity conduit, the gravity pressure conduit and channel, the pressure conduit with pump station and the pressure conduit in considering pump station flow variations are presented respectively

    本文針對不同類型的輸線和配網系統的特點,應用遺傳演算法和線性規劃等優化設計理論和方法,對其優化設計問題行了較為系統的研究,成果如下: 1分別建立了重力輸系統、重力輸渠系統、泵站加壓輸系統以及考慮流量變化的泵站加壓輸系統優化設計的線性規劃數學模型,並提出了計算方法。
  12. This results showed the program can be used to simulate the variation of sewage qulity validly and exactly in a sewer which has the same characteristic with that sewer. analysing the real data and simulation data ss and xs decreased apparently ; xbh increased apparently ; snh, snd, and xnd have little variation

    對西安市某污質測定和模擬,各組分實測值與模擬值的相對誤差均小於5 . 0說明兩者較為吻合,應用模擬程序可以對具有上述特徵的排質變化行有效和較為準確的模擬。
  13. Research on water hammer with gas in pressure conduit system through physical experiments, researches on pressure conduit system with gas releasing and liquid column separating, which consist of observing flow patterns, testing the conditions under which liquid column separation brings into existence and the water hammer in water interception collision, and studying effects resulting from gas content and different water velocities in pipeline, was done

    3 、輸系統中含氣錘研究通過物理試驗,對有壓輸系統中的氣體釋放與液柱分離行了研究,觀察其流態、測試液柱分離發生的條件及斷流彌合錘壓力,研究了含氣量、流速等參數對液柱分離的影響。
  14. To minimise this pollution, sewer connections for some of the premises in the vicinity of the sam dip tam stream are in progress, and a public sewer for the catchment area of the pai min kok stream is being constructed in phases, with a scheduled completion date of 2009

    為了減低污染,政府已開始在三潭溪附近一些樓宇行污接駁工程,另外也分階段在排棉角溪集區內興建公共污,工程預計在2009年完成。
  15. For the sake of the research about hydroelectric interfere among machines, the article utilized the simulink in matlab as simulating tool, meanwhile established the simulating model about two high head diversion water turbines regulation system in violent fluctuating pressure sharing one head race tunnel and surge tank and one penstock. then calculated the load rejection transition process by means of the real parameters of a hydro power station, analysed the interfere of hydro power station safety and stable nenring brought by hydroelectric interfere and put forward a series of measures that lightening the hydroelectric interfere

    為了研究機組間的力干擾,本文採用matlab下的simulink作為模擬工具,建立共用有壓引、調壓井、壓力主的兩臺高頭引輪機調節系統大波動時的模擬模型,引入實際電站的參數,對甩負荷過渡過程行了模擬計算,分析力干擾對電站安全、穩定運行所造成的影響,並提出了一系列減輕力干擾的措施。
  16. To avoid the pollution of groundwater resource and adjacent environment caused by drainage pipe leakage, current criterion in our country stipulates that there must be a pressurization test before drainage pipes are used

    為防止污滲漏而導致污外滲污染地下資源和周邊的環境,我國現行的規范規定,無壓在竣工交付使用之前必須的嚴密性試驗。
  17. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站口型式研究;鋼襯鋼筋混凝土引研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  18. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站口型式研究;鋼襯鋼筋混凝土引研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  19. The intake pipe is going to wash them up right inside the water treatment piant

    進水管道會將他們沖處理廠
  20. One of chongqing ' s largest drinking water suppliers said the water level had fallen below most of the pipes the company uses to draw water from the river

    一家重慶的供公司說,由於長江位持續下降,大部分進水管道已經露出面,無可供了。
分享友人