過度充電 的英文怎麼說

中文拼音 [guòchōngdiàn]
過度充電 英文
overcharge
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : Ⅰ形容詞(滿; 充足) sufficient; full; ample Ⅱ動詞1 (裝滿; 塞住) fill; charge; stuff 2 (擔任; ...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • 過度 : excessive; over; undue; ana-; hyper-
  1. First, a simple discussion for the mechanism about electrostatic atomization of the liquids has been given ; then the paper theoretically analyzed waving course, liquid drop producing course, and the liquid drop diffusing course in electrostatics atomization process., gave an analysis about the methods about carrying charges to the liquid drop, and analyzed that liquid with high electrical conductivity can be carried charges and atomized by electric field, while the isolated liquid with low electrical conductivity can be charged fully with the soakage electrode and inducing charge methods. at last the paper designed and configured the experimental equipment, conducted the atomization experiment to the three liquid medium - kerosene, emulsifier and alcohol under the same environment, handled the experimental results, then summarized the relationship between liquid electrostatic atomization effect and liquid surface tension, electronic conductivity and viscosity, along with the influence of voltage to electrostatic atomization and so on, found out the liquid atomization rule in high voltage electrostatic field

    首先,對液體介質的靜霧化機理作了初步的探討,理論上分析了液體霧化程中射流區、波紋區、霧滴區和霧滴擴散區;然後對液體荷方法進行了研究分析,對于高導率的液體,場致荷和接觸荷可以使其霧化,而對于導率較低的絕緣液體,需用浸潤極荷和感應荷方法使其分帶;最後,根據前面的研究分析,設計和組裝試驗裝置,在同一環境下對煤油、乳化劑、酒精三種不同液體介質進行高壓靜霧化試驗,並對試驗結果進行分析處理,總結出液體靜霧化與液體表面張力、導率和粘的關系及壓對液體靜霧化的影響等,得出高壓靜場中液體霧化的一般規律。
  2. After which, the battery will be charged by large constant current to allow the fast charging. finally, the constant voltage charging is adopted to guarantee the battery was charged to its full capacity. under the condition that the temperature has raised to a certain threshold at the constant current charging stage, the over temperature circuit is performing and it provides a compensation current which switches the system to constant temperature charging mode with the intention of protecting the ic

    即在初期採用較小的流對池進行預處理,對出現池進行修復和保護;然後採用較大的恆定流對,實現快速的目的;最後採用恆定壓,確保滿;在恆流階段,當晶元溫上升到一定程時,晶元熱保護路開始工作,該路以提供補償流的形式使進入恆溫模式,對晶元進行保護。
  3. Edit : i checked the overcharged cell temperatures with an ir thermometer : 127f. now being over 4000 ma * h, i pulled them from the charger to reduce the damage to my cells

    我用紅外線溫計測量了的池溫: 127華士。由於已經4000毫安時的容量,我把它們從器里取出以減少對池的損傷。
  4. For safe and full charge, after the charging is finished, charger will change into trickle charge process automatically and the trickle charge rate can be chosen according to battery ’ s self discharge amount

    后,為了補池因自放而損失的量,器將自動轉入涓流程,涓流速率可根據池自放的程來選擇。
  5. A serial of our products is popular among our domestic and foreign customer, such as mosta high precise powder metallurgy gear, high speed silicon steel sheet, cordless driver drill, charger and electro motion key for tyre of car

    企業生產的"妙達"高精粉末冶金齒輪、自扣式高速沖片(矽鋼片) 、式起子鉆等系列產品,全部通國家出口商品檢驗局的商品檢驗,並獲得國內外客商和一致好評。
  6. Many experiments on the effects with the change of several parameters, such as initial charging current, amplitude and frequency of positive pulses, variety of the amplitude of positive pulses among each charging stages, amplitude and duration of negative pulses, duration between positive and negative pulses, have been performed. the results of analysis and comparison of experimental data verify the validity and feasibility of the fast - charging method. on this basis, a new type of control strategy is advanced

    程中的起始流、正脈沖的幅值、正脈沖的頻率、各級之間正脈沖幅值的變化幅、負脈沖的幅值、負脈沖的持續時間、正負脈沖之間的停歇時間等幾個參數進行了大量的實驗,對實驗數據進行分析和比較,驗證了快速方法的有效性和可行性,在此基礎上提出了一種新型快速控制策略。
  7. All of the listed battery packs use the fresh grade a battery cells and are equipped with special circuit, which protect the battery packs against short circuit, over - discharge, over - charge, over - current and over - temperature

    所有手機池均用全新的a級芯製造,並內有特別設計路以保障池免受各種意外,例如短路,過度充電大,溫高等不良因素影晌及損害。
  8. All of the listed battery packs use the fresh grade a battery cells and are equipped with special circuit, which protect the battery packs against short circuit, over - discharge, over - charge, over - current and over - temperature. in order to safeguard your benefits and to provide a faster collection service, you

    所有手機池均用全新的a級芯製造,並內有特別設計路以保障池免受各種意外,例如短路,過度充電大,溫高等不良因素影晌及損害。
  9. In this circuit, reference current sources are used to charge and discharge capacitors. this oscillator ’ s output is very ideal through control circuit under 5. 7v reference voltage, and oscillator ’ s frequency and duty - cycle could be adjusted if reference current source or capacitors in the circuit was adjusted. and the changes of temperature and voltage affect stabilize of the frequency little

    路利用系統內部基準源產生的流信號來對容進行,然後經控制路作用后,產生的輸出振蕩波形的上升時間和下降時間非常小,更接近理想矩形波形;通調節基準源流信號或者容值大小,可調節振蕩波形的頻率和占空比,同時溫壓的變化對振蕩器輸出波形頻率穩定的影響很小。
  10. The recharging device if provided shall provide the rated charge performance specified by the battery manufacturer to charge the battery within 24 h over the rated ambient temperature range and when operating at voltages within the range of 0. 9times the rated operating voltage ( range ) and 1. 06times the rated operating voltage ( range )

    當工作在壓為額定壓的0 . 9倍到1 . 06倍范圍內,在超額定環境溫范圍時器應能達到由池生產廠家規定的對池24小時的規定的性能。
  11. Besides, the battery under and over temperature protection module, battery status detection module, and power status detection module are also added in the system to allow the intelligent control of the charging process

    此外本文還增加了池溫保護功能、池狀態檢測功能、源狀態檢測功能等,實現了對程的智能化控制。
  12. The module will itself react if a dangerous situation should occur, which including under - voltage, over - voltage, over - current and short - circuit. it can block the operation of the battery and stop work, even completely shut down the working circuit to protect the battery. in the module we design the liquid crystal display to show the characters and the running state of the battery

    池運行狀態監控模塊關注于池的壓、流和溫的採集以及soc等參數的計算方法;利用總線方式使池能夠與智能器和主機通訊;模塊內部設計了池保護路,當池在使用程中出現壓、欠壓、流和短路時,對池進行控制使其停止工作甚至切斷工作迴路達到對池的保護作用;為了更直觀的了解池當前的運行狀態,還為模塊設計了液晶顯示屏來實時顯示池當前的運行狀態。
  13. Temperature of the battery will be rise after charging or using

    以後或使用后,溫會升高。
  14. Further requirements such as higher electrochemical capacity and better reversibility are advanced to lithium ion battery with the development of our society. in the first cycle of lithium ion battery, solvent decomposition reaction on the surface of electrode will lead to the formation of a passivating layer, commonly named solid electrolyte interface film ( sei film )

    在鋰離子池的程中,極和解質界面區由於解質與極材料之間的相互作用而在極表面形成一層厚在幾個納米范圍的表面層,這個表面層被稱為固體解質中間相( solidelectrolyteinterfacefilm ,簡稱sei膜) 。
  15. Technological conditions of the cathode material lini1 - xcoxo2 using like sol impregnation method at air atmosphere have been investigated systematically. the structure and cycling performance of the sample linio. 7coo. 3o2 obtained at optimal conditions have been further studied too. the results indicates that the sample exhibits good electrochemical properties when cycled at low current density, and the material has little volume changes, showing good stru

    對不同流下材料的xrd圖譜的特徵及循環穩定性的分析,發現空氣中合成的lini _ ( 0 . 7 ) co _ ( 0 . 3 ) o _ 2材料以低流密時具有良好的化學穩定性,當材料以低流密在0 . 3 1 - y 1 . 0范圍內進行脫/嵌鋰反應,材料的體積變化較小,結構穩定。
  16. Charge batteries within an ambient temperature range of 0c to 40c. charging current : above 0. 1c, control conditions time, voltage, temperature, etc. shall be carefully selected

    0 . 1c的流,要選擇合適的控制條件如時間- v溫,否則嚴重的會對池性能造成損害
  17. The charge related to esd can be compensated by oxygen environment, oxygen environment works mainly through making up oxygen vacancy and repairing energy band distortion in time. heating the sample and reducing defect concentration can reduce the charge related to inner defects

    對于樣品表面子受激解吸造成的可通氧環境提供補償,氧環境主要是通及時補氧空位、修復能帶扭曲起作用的;對于子束調制內部缺陷造成的可通加熱試樣減輕缺陷濃來補償。
  18. It is also wavelet transformation that transient wave formed in the charged process of line, the accurate length of line can be got by using singularities and idea of fault location presented in the paper

    再者對線路剛的暫態程形成的暫態波進行小波分析,利用奇異性檢測理論及本文提出的測距方法的核心思想,得出線路的準確長
  19. The overheating charging will damage the battery and even cause explosion, on contrary, it is difficult to charge the battery to its full capacity at the under temperature condition

    保護:鋰高會損壞池並可能引起爆炸,溫低則很難將滿。
  20. The real - time control strategy ( rtcs ) presented here determines the ideal operating point of the vehicle ' s engine and motor by genetic algorithms ( ga ). the approach implicitly incorporates the effects of many factors which include the vehicle ' s fuel economy, vehicle ' s emission, soc of battery, regenerative energy, temperature of engine, operating history of the vehicle and so on

    本文針對eq7200並聯混合動力轎車制定了實時控制策略,採用了遺傳演算法實時確定發動機和機的工作組合點,控制程綜合考慮了車輛燃油經濟性、車輛的排放性、蓄池的狀態( stateofcharge ,簡稱soc ) 、制動能量、發動機的溫及車輛的操作等因素。
分享友人