道路改善工程 的英文怎麼說

中文拼音 [dàogǎishàngōngchéng]
道路改善工程 英文
road improvement
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ動詞1 (改變) change; transform 2 (修改) revise; alter; modify 3 (改正) rectify; correct 4 ...
  • : Ⅰ形容詞1 (善良; 慈善) good 2 (良好) satisfactory; good 3 (友好; 和好) kind ; friendly 4 (...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 道路 : road; way; path
  • 改善 : improve; ameliorate; perfect; better; mend; modify; improvement; perfection; melioration
  1. Construction of sewers and the north - east river wall and site formation work at tai o, the road improvement works for cheung chau old town, and the reclamation, road and drainage works at yung shue wan, lamma island are in progress

    大澳污水渠與東北河堤建造及地盤平整、長洲舊墟道路改善工程,以及南丫島榕樹灣的填海、及渠務,均在進行中。
  2. Major projects under planning include the traffic improvements to tuen mun road town centre section, reconstruction and improvement to tuen mun road, widening of the tolo highway fanling highway between island house interchange and fanling, the central - wanchai bypass and the island eastern corridor link, improvement to island eastern corridor between causeway bay and north point, central kowloon route, widening of gascoigne road flyover, route 4 between kennedy town and aberdeen and retrofitting of noise barriers on 8 existing road sections. hk - zhuhai - macao bridge hk project management office

    而籌劃中的項目有屯門公市中心段交通屯門公重建及舊政務司官邸附近交匯處與粉嶺之間的吐露港公粉嶺公擴闊中環及灣仔繞和東區走廊連接銅鑼灣至北角的東區走廊中九干線加士居行車天橋擴闊四號干線堅尼地城至香港仔及加建隔音屏障於八條現有
  3. Salisbury road underpass and associated road improvement works

    梳士巴利行車隧及相關的道路改善工程
  4. A climbing lane between nam wai and clear water bay road in the kowloon - bound direction was constructed in july 1992 and a substantial improvement to the junction of hiram s highway clear water bay road was completed in may 2000

    一條介乎南圍與清水灣之間往九方向的上坡慢線已於一九九二年七月建成。二零零零年五月,西貢公清水灣交界的
  5. In order to cope with the increasing traffic, an improvement to tuen mun road commenced in mid - 1994. the provision of a climbing lane each in three critical uphill sections of tuen mun road in the kowloon - bound direction, namely sam shing hui, so kwun wat and ting kau, was completed in august 1996

    為配合不斷增加的交通量,屯門公於一九九四年年中展開,以便在屯門公往九方向的三個重要上山段,即三聖墟,掃管笏及汀九,加建爬坡車全部已於一九九六年八月完竣。
  6. Road improvement to junction at victoria road and sandy bay road

    域多利及大口環交界處的道路改善工程
  7. Kam tin bypass and stage 2 improvements to kam tin road

    錦田繞和錦田第二期
  8. Hiram s highway improvement phase 3 : improvement between nam wai and ho chung upgrading local access roads

    西貢公第3期南圍與蠔涌之間的道路改善工程及區內通
  9. Minor road improvement works

    小規模道路改善工程
  10. Minor road improvement work

    小規模道路改善工程
  11. Salisbury road underpass and associated road improvement works updated

    梳士巴利行車隧及相關的道路改善工程更新
  12. Motorists are advised that in order to facilitate road improvement works by highways departm

    ,以便政署進行道路改善工程
  13. General areas requiring rural upgrading and access improvement are identified

    顧問公司已鑒定需要進行鄉郊道路改善工程的概括地區。
  14. Eastbound between fung shing street and jat s incline will continue to be closed to facilitate road improvement works

    清水灣東行由豐盛街至扎山之間的一段將仍然封閉,以便進行道路改善工程
  15. Tsing yi north coastal road, castle peak road and fan kam road ), drainage improvement works in yuen long and shenzhen river, site formation, slope works, landfill, reinforced fill works, reclamation, and work on rock tunnels and caverns

    這些務計劃包括了道路改善工程(例如青衣北岸、青山公和粉錦公) 、元朗及深圳河的排水渠、其他各類計劃的地盤平整及斜坡、填土及加筋填土、填海、開鑿巖石隧及巖洞等。
  16. Roads works, use and compensation ordinance chapter 370 - pwp item no. 6365th - castle peak road improvement between area 2 and sham tseng, tsuen wan - corrigendum

    、使用及補償)條例(第370章) - -務計劃項目第6365th號- -荃灣第2區與深井之間的青山公- -勘誤
  17. Hiram s highway improvement phase 2 flyover and junction improvement at junction with clear water bay road

    西貢公第2期:與清水灣交界處的天橋及
  18. To improve the junction between hiram s highway and clear water bay road, the construction of phase ii of the hiram s highway improvement works started in january 1997 for completion in 2000

    西貢公及清水灣的交界,西貢公第二期的已於一九九七年一月展開,預計於二零零零年竣
  19. The works mainly comprise the management and maintenance of public highways, slopes, highway structures, landscaping works and associated works, and minor improvement works in tai po and north districts but excluding the high speed roads

    主要包括在大埔及北區除快速公外進行公共斜坡構築物環境美化和相關的管理及維修,亦包括小規模道路改善工程
  20. The works mainly comprise the management and maintenance of public highways, slopes, highway structures, landscaping works and associated works, and minor improvement works in northern and western districts of hong kong island but excluding the high speed roads

    主要包括在香港島西北區除快速公外進行公共斜坡構築物環境美化和相關的管理及維修,亦包括小規模道路改善工程
分享友人