重水反應堆 的英文怎麼說

中文拼音 [zhòngshuǐfǎnyīngduī]
重水反應堆 英文
heavy water reactor (hwr)
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (方向相背) reverse side 2 (造反) rebellion 3 (指反革命、反動派) counterrevolutionari...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ動詞(堆積) pile up; heap up; stack Ⅱ名詞1 (堆積成的東西) heap; pile; stack 2 (小山 多用於地...
  • 重水 : [化學] heavy water; deuteroxide重水冷卻堆 heavy water cooled reactor
  1. Pressurised heavy water reactor candu

    candu
  2. Candu canadian deuterium uranium reactor

    加拿大
  3. Candu is a pressurised heavy water reactor operated on natural uranium fuel u - 238 and uses heavy water d

    Candu是的一種,以天然鈾燃料u - 238運作,並以d
  4. Canadian deuterium - uranium reactor

    加拿大
  5. Iaea : iran to allow inspections of heavy water reactor

    聯合國原子能機構:伊朗將允許視察重水反應堆
  6. Light water cooled heavy water reactor

    冷卻重水反應堆
  7. Heavy water reactor

    重水反應堆
  8. Ntu " khpi " is the only higher education institution that trains specialists for such important branches of machine - building as turbine construction for atomic, thermoelectric, hydraulic power engineering, heavy electric machine - building, tractor - building, computer control systems for internal combustion engines, boiler - and reactor manufacturing, fat technologies and fat substitutes technologies, tank - building, electrical insulation, cable and condenser engineering

    哈爾科夫工業大學是唯一一所培養下列要部門的機器製造業專業人材:原子能、火電和電渦輪機製造,型電機製造,拖拉機製造,內燃機、鍋爐和的計算機控制系統,油技術和油替代技術,坦克製造,電氣絕緣,電纜和電容器製造。
  9. Under this circumstance, the project to construct beijing rnb facility on the basis of hi - 13 tandem accelerator has been proposed by china institute of atomic energy ( ciae ). apart from carrying out some interesting experments in astrophysics using the secondary radioactive beam line in being, the research work about the off - line rnbs on hi - 13 tandem accelerator can be also performed by making full use of ciae ' s 101 heavy - water reactor ( hwr ) or cyclone30 cyclotron

    除了利用我院現有的次級束流線來開展核天體物理感興趣的一些研究工作之外,還可以利用101 #重水反應堆和cyclone30強流質子回旋加速器,在hi - 13串列加速器上開展離線放射性核束方面的研究工作,為今後在將建成的北京放射性核束裝置上開展放射性核束物理實驗研究工作打下基礎。
  10. Heavy - water reactor

    重水反應堆
  11. The importance of the ratio of water to uranium in reactor physical design is indicated

    指出了鈾比在物理設計中的要性。
  12. A team of inspectors from the united nations international atomic energy agency ( iaea ) visited a heavy water reactor in iran on monday

    聯合國國際原子能機構核查小組星期一查看了伊朗的一個重水反應堆
  13. " if you look around the world at heavy water reactors of this size, virtually all of them have been used to make bombs.

    "如果你留意一下全球范圍內這一規模的重水反應堆,你就會發現它們幾乎全是用來製造炸彈的.
  14. A team of inspectors from the united nations international atomic energy agency iaea visited a heavy water reactor in iran on monday

    聯合國核查人員查看伊朗設施聯合國國際原子能機構核查小組星期一查看了伊朗的一個重水反應堆
  15. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高石壩原位觀測和潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進平,該兩項成果已用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已用於國家點工程甕福礦肥基地建設,效益顯著; 「克孜爾庫工程原型觀測數據庫與資料分析」咨詢項目為庫運行與管理提供了有力保證。
  16. Ordinary water, graphite and the more expensive heavy water are used as moderators for various types of commercial nuclear reactors

    商營核普遍採用普通石墨和較昂貴的作為慢化劑。
  17. Thus the b ( e2 ) value of the first excitation state of 64cu has been directly measured for the first time with this method using 64cu rnb in this work

    因此利用原子能院101 『重水反應堆,首次用低能庫侖激發實驗方法對『 tll第一激發態b田)值進行直接測量。
  18. The u. n. nuclear agency says iran will allow inspectors to visit its heavy water reactor as part of an agreement aimed at resolving questions about iran ' s nuclear program

    聯合國原子能機構說,伊朗將允許核查人員前往視察重水反應堆,作為解決伊朗核計劃問題的組成部份。
  19. Condensation of steam in the presence of noncondensable gases is an important heat transfer mode in the passive containment cooling system ( pccs ). in the past decade, great efforts have been made on the investigation of this regime

    含有不凝性氣體的蒸汽冷凝是先進非能動安全殼冷卻系統( pccs )中要的換熱方式,是當前核熱工力學研究的一個熱點。
  20. In the thesis, the relap5 code is made use of simulating and calculating the passive core makeup tank ( cmt ) of the next generation reactor ac - 600 of our country. and the calculative results based on the comparative character of the system are compared with the experimental results in the corresponding experimental devices of ac - 600 makeup water tank in nuclear power institute of china ( npic ). finally the thesis conclusion summarized is that the makeup water passively injected to the reactor coolant system by the core makeup tank depending on the gravity is viable in the middle and small locas

    本論文利用relap5程序對我國下一代先進ac - 600的一個具有非能動性能的芯補箱分系統進行了模擬計算,根據系統之間的可比性,把計算的結果和與之相對的中國核動力研究設計院芯補箱補實驗裝置的實驗結果進行了定性的比較分析,得到了論文的結論:在中、小破口失事故的工況下,芯補箱依靠力向冷卻劑系統實現非能動的補是可行的。
分享友人