重路由站 的英文怎麼說

中文拼音 [zhòngyóuzhàn]
重路由站 英文
heavy route station
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : causereason
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. He was luxuriously stretched in a good english calash, with double springs ; he was drawn by four good horses, at full gallop ; he knew the relay to be at a distance of seven leagues

    他現在舒舒服服地躺在一輛華麗的英國馬車里,身下有雙彈簧座墊,四匹好馬拉著車子疾駛。他知道離前面的驛只有二十哩了。
  2. We want to see trams along p2, pedestrian crossings at grade at both northern corners of tamar, and street level visual corridors into the city and to the harbour. the mtr island northern line with stations at tamar and hkcec should be publicly confirmed at an early date. " christine loh said in order for the area to attract resident and visitors, the design briefs for the tamar site, including central government offices, legco buildings and public space, need to be drastically altered

    小組表示:我們不希望看見添馬艦用地變成平臺,公眾用地必須要拆細發展,讓市民及遊客可隨時享用這些地方,能夠創造不論晝夜或假期都可使用的空間設施是十分要的, p2道網亦需要作出改變,我們希望電車能夠支援這個p2道網,行人道添馬艦的北面起,通過長廊直達中區及海傍,亦希望地鐵港島北支線可盡快落實,並於添馬艦及香港會議展覽中心設
  3. Close to the tseung kwan o cemetery, yau tong mtr station was used by a large number of grave - sweepers during the chung yeung festival. the station control plan formulated by police and the mtrc proved to be successful for both crowd management and railway operation

    於地鐵油塘座落於將軍澳墳場附近,大量的掃墓人士在陽節期間經該前往掃墓,總區及地下鐵公司共同制訂的車控制計劃,對人潮管制及鐵運作具顯著成效。
  4. Although china telecom has planned to increase the speed of its backbone by eight folds and its bandwidth, network delay is unavoidable if the distance between the user and the website server is too great

    盡管中國電信計劃將骨幹網提速8倍,並且增加帶寬,但是如果訪問者和網之間的距離太遠的話,它們之間的通信一樣需要經過轉發和處理,網延誤不可避免。
  5. Chongqing expressway networking toll data communication network cotains 2 - ring and 8 - ray network structure based on expressway physical structure, setting up a trasmission trunk layer of sdh stm - 4 ( can be up - graded to stm - 16 ), and channel protection business entry layer consisting of sdh onu / olt stm - 1 ( can be up - graded to stm - 4 ). data exchange layer, through ip route exchange network above sdh network, forms 3 - level computer network structure of account settlement center - road section management company - toll station. to ensure obtaining original and reliable toll data from communication network, 2m circuitous chain is established between each toll station, accountsettlement center and road section management company, and also pstn dialing backup chain is set up between toll station and account settlement center. in order to maintain clock synchronization of the whole communication network, a proposal of sub - stage clock sychrononization signal network for differet network construction scale has been put forward in this design. in view of sensitivity and importance of toll data, this design particularly gives considerations of network safety and information safety for external and internel of network. therefore, communication safety, smoothness and reliability of networking toll system can be able to maintained in many ways

    慶高速公聯網收費數據通信網的結構是根據高速公的物理結構構築了2環8射的網狀結構,建立了以sdhstm - 4 (可升級到stm - 16 )的傳輸主幹層,以sdhonu / oltstm - 1 (可升級到stm - 4 )組成的通道保護業務接入層。數據的交換層是在sdh網之上的ip交換網,形成了結算中心-段管理公司-收費之間的3級計算機網結構。為從通信網上保證收費數據的原始性和可靠性,每個收費和結算中心、段管理公司之間建立了2m迂迴鏈,同時在收費和結算中心之間建立了pstn的撥號備份鏈
  6. The new unit has following technical features : ( 1 ) the unit ' s load is balanced by means of the accumulator and hydraulic cylinder with special structure ; ( 2 ) the installed power of the unit can be reduced greatly by adopting the accumulator ; ( 3 ) variable frequency speed regulation ensures good energy saving effect, and the closed oil circuit requires less hydraulic oil ; ( 4 ) a bi - directional hydraulic lock in the oil circuit ensures the stability and safety of the operation of the pumping unit

    新型機具有4個技術特點: ( 1 )於活塞柱塞式液壓缸的特殊結構和液壓蓄能器的配合使用,在平衡抽油機大部分載荷時,不需另外增加配,可減小抽油機體積、質量和佔地面積; ( 2 )抽油機下沖程時,與活塞柱塞式液壓缸相連接的蓄能器吸收能量,上沖程時儲存在蓄能器中的能量補充載荷上行所需的能量,大幅度降低抽油機裝機功率; ( 3 )利用變頻容積調速節能效率高,閉式油節省液壓油,同時大大減小液壓泵的體積; ( 4 )在閉式油中採用雙向液壓鎖可使抽油機的啟停更加平穩、迅速,其工作的穩定性和安全性更好。
  7. The chongqing electric power load system was set up in 1992, and by 1996, a control center composed by novell network, six bi - directional relay transmit stations, 2 unilateral transmit stations and 1260 diversified terminals have been established, which covered areas managed by the former electric power bureau of chongqing. the system scope of the established electric power system was on the top place among the large and middle cities over the country

    慶電力負荷控制系統始建於1992年,到1996年時,已建成了一個novell網構成的控制中心、 6個雙向中繼轉發、 2個單向轉發、各類型終端1260多臺,覆蓋原慶電業局所轄供電區域。系統規模在當時全國各大中城市建立的電力負荷系統中居首位。
  8. Therefore, we study on the survey method for the statistics of whole industry waterway transportation volume based on the basic units of ships management and waterway traffic safety superintendence - port and waterway superintendence units ( pws units ). in this dissertation, we mainly studied and solved the following three problems : 1

    此對依託我國的水上安全監督和船舶航行管理的基層單位? ?港航監督所、監督和監督點(以下簡稱為:港航監督所)開展全行業水運輸量統計調查進行了研究,本論文點研究和解決了方案設計中以下三方面的問題: ( 1 )依託港航監督所,進行全行業水運輸量抽樣調查的具體方法研究和篩選。
  9. Zb transformer substation named european style cubical substation, which as a new type of electricity supplying equipment, with more advantages than traditional substation, because of small dimension, compact structure, and decreases the construction cost, at the same time, its installation is very easy, and the supply is very fast, and no need watching people, especially it is into the load center, which is very important for improving the supplying quality, decreasing the loss, improving supplying reliability and reforming electricity network

    Zb型箱式變電谷稱歐式箱變,作為一種新型供配電裝置,它比傳統土建變電具有許多優越性。於它體積小,佔地面積小,結構緊湊,便於搬遷,因而大大縮短了基建的周期和佔地面積,也減少了基建費用。同時,箱式變電現場安裝簡單,供電迅速,設備維修簡單,無須專人值守,特別是它可以深入負荷中心,對提高供電質量,減少電能損失,增強供電的可靠性以及對配電網改造都是十分要的。
  10. The automation in power station is the only way to lift the power station supplies power on the dependability, continuance and indicator of quality, and it is the very significant actual sense to research the automation in power station

    自動化是進一步提高電供電的可靠性、連續性及其質量指標的必,對其進行研究有很要的現實意義。
  11. Router delays : packets are re - assembled when received by routers and buffered in memory until they can be transmitted on the next hop

    延遲:包被器接收后新組裝並保存在緩沖區中直到他們發送到下一
分享友人