鐵路跨線橋 的英文怎麼說

中文拼音 [tiěkuàxiànqiáo]
鐵路跨線橋 英文
railroad underbridge
  • : Ⅰ名詞1 (金屬元素) iron (fe) 2 (指刀槍等) arms; weapon 3 (姓氏) a surname Ⅱ形容詞1 (形容...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 動詞1 (抬起一隻腳向前或向左右邁) step; stride 2 (兩腿分在物體的兩邊坐著或立著) bestride; stra...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • 鐵路 : railway; railroad; rail
  • 跨線 : overline跨線橋 [交通運輸] flyover; overpass; gauntree; viaduct; overpass bridge
  1. At north pieces of railway deck bridge at tongji university way, treasure it designs to be at new urban thingseses at backbone of city distance by yang way yang project treasure, the red line of road is 45 meters wide, ward off the way of urban backbone built once

    寶楊拓寬改建工程:寶楊工程由北段鐵路跨線橋西至同濟,寶楊設計為新城區東西向城市主幹,道寬45米,一次闢築的城市主幹
  2. It calculate 60 driving speed kilometers / hour, it design 30 kilometers of speed of deck bridges road, ground of offices / hour, road calculate and load type standard cars standard bzz - 100s, iron do distance to city one for new urban north and southses by mountain path by road surface structure, calculation 40 driving speed kilometer / hour

    計算行車速度60公里/小時,處地面道設計車速30公里/小時,道面結構計算荷載標準bzz - 100型標準車,為新城區南北向城市次幹,計算行車速度40公里/小時。
  3. The haizigou bridge located at houyue railway dk62 + 688 in yicheng city, is a double line railway bridge, 88. 5meter in heigh, 370. 32 meter in total length

    海子溝大位於山西省翼城縣境內,侯月dk62 + 688處,是一座越黃土沖溝的雙高88 . 5m ,長370 . 32m 。
  4. The keqikesubutai bridge is a long span railway bridge with high - rise piers located in the strong wind pressure and active seismic region, and is also a key construction project and the highest bridge on the jinghe - ining - horgus railway

    摘要克其克蘇布臺特大是一座位於高風壓、高地震區的高墩大梁,是精伊霍的重點工程之一,為全最高
  5. The upper level is for cars and has a width of 22. 5 meters ; the lower level is railroad and has a width of 18 meter. the length of the bridge is 1670 meter ( 1 mile )

    5米;下層為雙,寬18米;全長1670米,正長156米,有兩臺8墩9米,每孔度128米。
  6. The upper level is for cars and has a width of 22. 5 meters ; the lower level is railroad and has a width of 18 meter. the length of the bridge is 1670 meter 1 mile

    長江大上層是公,寬為22 . 5米下層為雙,寬18米全長1670米,正長156米,有兩臺8墩9米,每孔度128米。
  7. The lantau link comprises the cable - stayed kap shui mun bridge and, of course, the spectacular tsing ma bridge, the span of which measures 1, 377 m, that making it one of the longest suspension bridge in the world carrying both road and rail traffic

    青嶼干由斜拉索結構的汲水門及宏偉壯觀凈度為1 , 377米的青馬大組成。青馬大更是世界上最長的道兩用吊之一。
  8. It comprises two bridges, where tsing ma bridge on ma wan channel is the world s longest road and rail suspension bridges with a main span of 1377 meters and a total length of 2. 2 kilometres, and also the main part of the lantau link

    由兩組組成,其中越馬灣海峽的青馬大,是現時世界上最長的行車兩用吊距達1377公尺,全長2 . 2公里,是青嶼干的最主要部分。
  9. The spokesman further explained that the whole bridge was relocated without dismantling the existing features and the shifting of the bridge across the existing railway line was the most difficult part of the operation

    發言人進一步解釋,遷移工序進行前並沒有拆卸體,而是將整座完整地過現有移到下游位置,是整個遷移過程中最困難的工序。
  10. Especially the bridge engineering has to be concerned with high, new and difficult technologies. new technologies firstly adopted are post - tensioned prestressed concrete simply - supported box girder, assembly two - way prestressed concrete simply - supported t - girder, reinforced concrete continuous rigid frame, and steel - concrete composite continuous girder. all these have formed a series of new bridge structures taking prestressed concrete simply - supported box girder as main feature

    由於秦沈客運專的特殊技術要求,在建設史上首次採用了后張法預應力混凝土箱形簡支梁、裝配式雙向預應力混凝土t形簡支梁、鋼筋混凝土剛構連續梁、鋼與混凝土結合連續梁等結構,形成了以預應力簡支箱梁結構為主要特徵的一系列梁新結構。
  11. This paper studies the key techniques involved in the construction of the deep water foundations, long - span prestressed concrete continuous rigid - framed girders and long - span concrete - filled steel tube arches of yichang changjiang river bridge on the newly built yichang - wanzhou railway, and also provides solutions to the possible problems thereof, which may be of certain guiding roles to the practical construction

    摘要對新建宜昌至萬州宜昌長江大深水基礎、大度混凝土連續剛構梁、大度鋼管混凝土拱等施工過程中遇到的關鍵技術問題進行了研究,並對各個問題提出了解決方案,對實施性施工有一定的指導意義。
  12. The construction space for gonghe cable - stayed bridge is not enough because it crosses over the main hada electric railway which is under reconstruction

    沈陽市公和斜拉主幹,加上哈大電氣化改造等原因,導致下施工凈空不足。
  13. In view of the characteristics of tin integration of rail transit elevated structure ad seamless route, this paper analyses tin metro design technical standards ( 2003 edition ) ad proposes the principles of value selection for elevated structure in the raw edition of code metro design

    摘要從分析城市軌道交通高架結構與無縫結合的特點入手,結合2003年版《地設計規? 》 ,對高架結構中結構豎向剛度、墩縱向水準剛度、相鄰墩臺沉降量之差等標準制定的依據和取值進行分析和探討。
分享友人