鐵路隧道工程 的英文怎麼說
中文拼音 [tiělùsuìdàogōngchéng]
鐵路隧道工程
英文
railway tunnel work- 鐵 : Ⅰ名詞1 (金屬元素) iron (fe) 2 (指刀槍等) arms; weapon 3 (姓氏) a surname Ⅱ形容詞1 (形容...
- 路 : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
- 隧 : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 程 : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
- 鐵路 : railway; railroad; rail
- 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
-
In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented
摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道滲漏水調查情況和鐵路隨道涌水狀態分類,運用工程類比法提出適合該地區公路隧道防排水結構設計的隧道涌水類型劃分及對涌水類型校核與細分的三種方法。Our “ sun shine ” brand carbon steel fiber have been widely used in road, protection slops of highway, bridges, reservoir dyke, tunnels, airport taxiways, well lids of city project ( guard against theft ), mine laneway, port, railway sleepers and etc, and gain high praise from clients
本公司「雙興」牌碳鋼纖維廣泛應用於道路,公路護坡、橋梁、防浪堤、水庫堤壩、隧道、機場跑道、市政工程井蓋(防盜) 、礦井巷道、港口、鐵路軌道等方面,深受廣大用戶贊譽。And some ancillary equipment such as : dosing units, feeding systems etc., they allow to operate in the most different job - site conditions : from large tunnels to small caverns and mining, from swimming pools construction to large channels maintenance
另外還有一些輔助設備,如測量設備,上料設備等。該類機器被廣泛使用到礦山鐵公路隧道水電工程巖土工程地下建築地鐵和市政基礎設施建設中。With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places
摘要採用鐵路工程抗震設計規范、動三軸試驗及有效應力的理論分析相結合的方法,對南京地鐵南北線( 1號線)區間隧道開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當隧道底板坐落在5層且5層較厚時的液化區出現在隧道襯砌底板處;局部地段液化區出現在隧道頂部及拱腰;大部分地段的液化區出現在隧道頂板上方。Abstract : in this paper, the efficient stress method is used as main means, while the railway engineering anti - earthquake design specification and the dynamic triaxial test are used as additional means. the authors analyze the ground layer liquefaction of shield tunnelling built on powder soil or fine sand, whose top plate is buried under two kinds of depth, and conclude that the liquefaction area is different with different buried depth. finally, the rational buried depth is proposed
文摘:以有效應力原理的有限元計算分析為主、鐵路工程抗震設計規范及室內動三軸實驗為輔,對修建在粉土或粉細砂層中的盾構隧道進行了兩種不同埋深情況下的液化分析,得出了埋深不同液化區出現區域不同的結論,並提出隧道抗液化的合理埋深。Wwf hong kong is greatly disappointed by the decision of the environmental protection department to approve the kcrc s sheung shui to lok ma chau spur line environmental impact assessment report. we found the adverse impacts incurred by the spur line project to be environmentally unacceptable, and the eia report failing to meet the requirements of the technical memorandum for the eia process under the eia ordinance because of the following reasons
世界自然香港基金會簡稱世界自然基金會對環保署批準九廣鐵路的上水至落馬洲支線隧道高架橋方案環境影響評估報告下稱環評報告深表失望,認為支線工程會造成不可接受的環境影響,而且環評報告亦未能符合環境影響評估程序的技術備忘錄的要求,因為:The geological conditions are very complicated in hejiazhai tunnel which is located in guizhou shuibo railway, this tunnel is named " mashed tunnel " with the most difficult geological conditions such as the high dense gas and developed karst and gushing water assembled together, the geological hazards like the gushing water and sand, the collapse of tunnel, surface subsidence and slide, cracking of tunnel lining were often happened during construction period
摘要貴州水柏鐵路何家寨隧道,工程地質條件極其復雜,集「高瓦斯、強巖溶、大涌水」為一體,施工期間曾發生多次涌水涌砂、洞內坍方、地表塌陷與滑坡、支護襯砌開裂變形等地質災害,堪稱水柏鐵路施工難度最大的「爛洞子」 。The works that hyder has undertaken cover areas of railways, highways, tunnels, bridges, buildings, geotechnics, environmental science, water supply & sewage treatment, airport and harbors, etc
其工程咨詢經驗已有150年,從事項目包括鐵路、公路、隧道、橋梁、屋宇、巖土、環境科學、供水及污水處理,機場和海港設施等。On 18 september 2001, the chief executive in council endorsed kcrc s proposal to adopt the bored tunnel approach for the construction of the spur line project. kcrc has discussed the tunnel approach with government departments concerned and is preparing a new environmental impact assessment report for the project
於2001年9月18日,行政長官會同行政會議同意九廣鐵路公司的建議,採用隧道方案建造支線項目工程。九廣鐵路公司已就該隧道方案與有關政府部門蹉商,並正制訂一份新的環境影響評估報告。Standard for constructional quality acceptance of railway tunnel engineering
鐵路隧道工程施工質量驗收標準It is applied to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, to drill drainage holes and grouting pile holes on roof of tunnel gallery
適用於水電站鐵路公路邊坡大噸位預應力錨固孔排水孔隧道口管棚孔的施工,以及預防滑坡巖石坍塌等地質災害治理工程。The wdii will provide land to build a sound road network comprising the central - wan chai bypass, the island eastern corridor link, the mtr north hong kong island line, a fourth cross - harbour rail tunnel and other roads
灣仔發展計劃第二期工程將提供土地用作建設道路網,包括中環灣仔繞道東區走廊連接路地下鐵路北港島線第四條海底鐵路隧道和其他道路。Zhejiang 8 amounting to tunnel engineering limited company is alley of well of bridge of road surface of channel of pilot a ship into a harbour of water and electricity of volume road tunnel, railroad channel, irrigation works, roadbed, mine, large cubic metro of earth and stone blow up the professional construction company that construction is an organic whole, have channel highway project to always contract two class aptitude
浙江八達隧道工程有限公司是集公路隧道、鐵路隧道、水利水電引水隧道、路基路面橋梁、礦山井巷、大型土石方爆破施工為一體的專業施工企業,擁有隧道公路工程總承包貳級資質。With the development of railway construction in china, more and more new multiple tracks are soon put into construction. because of topography and geology limit, nevv tunnel is close to existing tunnel, which frequently results in destruct existing tunnel structure and afifected safe run. these situations disturb safe construction of new tunnel, so it is necessary to research reliable construction technology of close - spaced tunnel
隨著我國鐵路建設事業的發展,越來越多的新建復線工程將投入建設,由於受地形地質條件等因素的限制,新建隧道與既有隧道之間設計距離較近,導致既有隧道結構破壞、影響運營安全的情況時有發生,也妨礙了新建隧道的安全施工,因此需要進行鄰近既有隧道安全施工技術的研究。Then the sponsor will invite a national each city subway construction conductor department, subway a programming a section, railroad construction, medium the iron tunnel survey design hospital, the railroad department first to investigate design hospital, medium the iron electrification survey design institute for research, the railroad department second to investigate design hospital, medium iron one bureau group etc. subway engineering in xian contract for a business enterprise to meeting visit to talk over
屆時主辦單位將邀請全國各省市地鐵建設指揮部、地鐵規劃部門、鐵路建設、中鐵隧道勘測設計院、鐵道部第一勘察設計院、中鐵電氣化勘測設計研究院、鐵道部第二勘察設計院、中鐵一局集團等西安地鐵工程承包企業到會參觀洽談。This subject directly investigates 14 construction enterprises and more than 40 construction sites. the types of the projects involve railway, bridges, tunnel, municipal, road, industry and civil construction, airport runway, hydraulic tunnel and others. this paper deeply analyzes and assesses the occupational health and safety management actuality of the construction site, points out the main problems in the process of hazard identification, risk assessment and risk control, and also analyzes why these problems exist
該課題研究直接調查了十四家施工企業和四十多個項目施工現場,項目類型涉及鐵路工程、市政公用工程、公路工程、房屋建築工程、機場場道工程、橋梁工程、水工隧洞工程、土石方工程等,對施工現場實際的職業健康安全管理現狀進行深入的分析、評估,指出了危險源辨識、風險評價、風險控制過程存在的主要問題,並分析了為什麼會存在這樣的問題。The railway tunnels along canton road and underneath the former marine police headquarters will be constructed by the bored tunnelling method to minimize impacts on the adjacent environment. other than the excavation works that need to be carried out within the works site near the canton road government offices for the new station and introducing the tunnel boring machine, the works that need to be carried out at the street level along canton road will be small in scale so as to minimize the impact on the environment in the neighbourhood
在廣東道沿路和前水警總部地底的鐵路隧道,會以鉆挖隧道方式建造,除了在廣東道政府合署現址附近的工地內挖開地面以便興建新車站及引進隧道鉆挖機外,需要在廣東道路面進行的工程規模會很少,以便盡量減少對毗鄰環境的影響。With the rapid development of the state highway construction, it becomes more and more important for the study of stability of peripheral surrounding rock and its forced condition of the structure during construction of railway or highway tunnels, especially of those long or extra - long tunnels
隨著我國高速公路建設的高速發展,鐵路、公路隧道,特別是長大和特長隧道施工過程中洞室周邊圍巖的穩定性與結構受力狀態的研究日益顯得重要。Yang is the key responsible for the design office no. 2, stedi
曾參與上海大連路隧道、翔殷路隧道、地鐵區間隧道工程的設計。This paper analyzes the effect of integrated geophysical well logging to the exploration of railway tunnels and results shows that this technique has become a useful method in hydrology and engineering exploration
這里闡述了某鐵路隧道鉆孔的綜合地球物理測井勘查效果,該方法已經成為一種行之有效的水文和工程地質勘查手段。分享友人