防洪標準 的英文怎麼說

中文拼音 [fánghóngbiāozhǔn]
防洪標準 英文
flood control standard
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • 防洪 : flood protection; flood control; prevent or control flood
  • 標準 : (衡量事物的準則; 榜樣; 規范) standard; criterion; benchmark; pip; rule; ètalon (衡器); merits
  1. It is necessary and pressing to excavate and broaden the floodway to increase the capacity of flood discharge and enhance the standard of flood control

    因此,開辟淮河入海水道,擴大水出路,增加泄能力,提高下游地區的防洪標準是十分必要和緊迫的。
  2. It is based on the above reasons, the leading system of flood, windstorm, drought control and the construction of water conservancy information engineering and the principle of theory and practicality are combined. based on the continuous development the following contents are researched in this paper : 1. the flood occurred law on major rivers and flood problems and flood control measure

    正是基於這種考慮,本論文結合廣州市三指揮系統工程和廣州市水利信息化工程的建設,本著理論性與實用性相結合的原則,從可持續發展的角度,重點研究以下內容: 1 、廣州市主要河流水發生的規律及存在問題與措施; 2 、廣州市現有措施的防洪標準與可靠性; 3 、水預報與調度系統的方法與技術路線; 4 、現代管理。
  3. Sparedescription : based on the author s research and information from the usa and japan, the development trend of flood control and disaster mitigation in economically developed countries is introduced, including the follow aspects : flood risk management, floodplain management, flood control standard, city rainfall flood storage, levee construction technology, public participation, flood insurance, management of storage and detention zones, flood control investment, study on flood control and disaster mitigation, and formulation of related laws and regulations

    描述:根據美、日等國最新文件和資料,結合作者多年的研究,簡明地介紹經濟發達國家在減災方面的最新發展趨勢.內容涉及水災害風險管理、泛濫原管理、防洪標準、城市雨調蓄、堤建設技術、公眾參與、水保險、蓄滯區管理、投入、減災科學研究、法規建設等諸多內容
  4. The analysis starts with the criterion of flood control and the capacity of flood discharge of the watercourse, where the water - intake pump house lies. through an analysis of a large amount of historical hydrological materials, a mathematic model is set up and the calculation is done

    課題分析研究主要是從取水泵房所處河道的防洪標準和行能力兩大方面入手,通過對大量歷史水文資料的分析建立數學模型進行分析。
  5. Article 19 : building of dam, sluice gate, bridge, wharf and other structures blocking, crossing or bordering a river channel ; laying pipelines or cables across a river, must comply with state - specified standards for flood control and navigation as well as other related technical requirements

    第十九條修建閘壩、橋梁、碼頭和其他攔河、跨河、臨河建築物,鋪設跨河管道、電纜,必須符合國家規定的防洪標準、通航和其他有關的技術要求。
  6. Those reclaimed lakes should be put in order according to the standards set by the state for flood control and restored from farmland in a planned way

    已經圍墾的,應當按照國家規定的防洪標準進行治理,有計劃地退地還湖。
  7. However, current pearl river drainage system ( including guangzhou ) still cannot reach the flood control standard for preventing catastrophic flood

    據介紹,包括廣州在內,珠江流域的整體能力距離國家防洪標準還有一定距離。
  8. This article firstly explains the state of flood control in china, basic characteristics of flood, criterion and evaluation of river flood defense

    本文首先論述了我國減災的基本形勢、水災害的基本特點、江河防洪標準及其評價。
  9. With the stage i and stage ii works completed, the river section downstream of lo wu has been improved to the required flood protection standard of " one in 50 years "

    深圳河治理工程計劃的第i及ii期已完成,羅湖下游一段的河道已獲得改善,達到能抵禦五十年一遇暴雨的防洪標準
  10. The damming caused by a bridge pier is one of the aspects considered intentionly while building a bridge on a river which flood control standard is low and flood control cost is high so the study of damming is of important value

    橋墩壅水是在防洪標準低、費用高的平原河道上修建橋梁時必須重點考慮的問題之一,其研究具有重要價值。
  11. The application to qingjiang cascade hydropower plants shows that the proposed model can give the controlling rules for optimal dynamic flood storage and elevates the efficiency of reservoir system management and utilization of flood water

    該模型應用於清江流域梯級水庫,計算結果表明,在不降低水庫及梯級原有的防洪標準前提下,能有效利用上游水布埡水庫的庫容,分擔隔河巖水庫部分任務,並顯著提高梯級水庫發電量。
  12. Article 26 for those bridges, approaches, wharves and other engineering structures across a river which seriously intercept or block water, the water conservancy administrative department concerned may, according to the flood control standards, report to the people ' s government at or above the county level that will, within the scope of powers provided by the state council, order the construction unit to rebuild or dismantle them within a time limit

    第二十六條對壅水、阻水嚴重的橋梁、引道、碼頭和其他跨河工程設施,根據防洪標準,有關水行政主管部門可以報請縣級以上人民政府按照國務院規定的權限責令建設單位限期改建或者拆除。
  13. On one hand, technological difficulty exists in determining the number and flood routing for dam system. on the other hand, for dam system security and stability, single dam ’ s designing should take flood control standard of dams, hinge composing, building sequence as well as years of filling up into account

    一方面壩系整體調、數量的確定技術難度大,另一方面,小流域壩系中單壩的設計必須綜合考慮上下游壩的防洪標準、樞紐組成、建設順序、淤積年限等情況,才能保證壩系的安全和穩定。
  14. The paper selected changtan reservoir in guangdong province as case study site, investigated the impacts of 4 upstream reservoirs on changtan reservoir ' s design inflow floods and explored changtan reservoir ' s flood - protection standards, regulating rules and potential for integrated water resources utilization after newly - constructed upstream reservoirs being taken into account

    論文以廣東省長潭水庫為研究對象,闡述了受人類活動影響的水庫設計水調度研究方法,研究了水庫在其上游修建了若干個中小水庫以後,其設計水調度所受的影響程度,分析比較了研究結果,探討了水庫在考慮上游多個水庫影響下的防洪標準、調度原則及水資源綜合利用特點。
  15. This paper expounds, the necessity and urgency of formulating the flood control planning of the yangtze river basin after the 1998 flood and expounds that the newly formulated flood control planning of the yangtze river basin is the succession and development of 《 the brief report of the yangtze river comprehensive utilization planning 》, and also analyzes the new achievements of the newly formulated flood control planning of the yangtze river basin in respects of planning thought, determination of flood control district division and flood control standard, and planning of various structural and non - structural flood control measures, etc

    闡述了1998年大水后編制長江流域規劃的必要性和緊迫性;新編長江流域規劃是對《長江流域綜合利用規劃簡要報告》中長江流域規劃的繼承和發展,從規劃思路、區的劃分和防洪標準的確定、各類工程措施和非工程措施規劃等方面,解析了新編長江流域規劃的新成果。
  16. Though the flood control engineering system improved the flood control standard and reduce the frequency of flood inundation and enlarger the protected area, but at the same time, the risk of dike broken and dam failed were added. moreover, people found that human living environment become worsen increasingly and the river ecosystem was destroyed

    然而,在與水斗爭的過程中,人們發現雖然通過大規模的水利工程建設,提高了江河的防洪標準,減少了水泛濫的幾率,擴大了保護的范圍,但同時也增加堤、大壩潰決等的風險,而且人類發現生存環境日益惡化,河流生態系統被破壞等諸多問題。
  17. Article 40 local people ' s governments at or above the county level responsible for flood control and flood fighting shall, in accordance with the comprehensive plans for river basins, in the light of the actual conditions of flood control works and based on the flood control standards set by the state, formulate the flood prevention schemes ( including the measures for dealing with catastrophic floods )

    第四十條有汛抗任務的縣級以上地方人民政府根據流域綜合規劃、工程實際狀況和國家規定的防洪標準,制定水方案(包括對特大水的處置措施) 。
  18. Combining with case study, the application conditions of hydrologic meteorology forecast information and flood forecast information in dynamic control of the limit water level during flood seasons are also illustrated. ( 3 ) in order to relieve the contradiction between water discharge in flood seasons and water shortage after flood seasons, the manner of flood operation with fixed limited water level during fixed time should be adjusted

    ( 3 )為改變水庫汛期棄水而汛后又缺水的矛盾局面,調整現行水庫固定時間固定汛限水位的調度方式,利用短期氣象預報和水預報信息,在不改變現有防洪標準的前提下研究預報調度方式,實現與興利效益的轉換,提高水資源的利用率。
  19. Based on characteristics of middle and upriver drainage areas of a river in our country, this paper analyzes and studies some hydrological information and draws a conclusion of floodgates, flood prevention standards and structure safety requirement are adopted as premises and compositive parts of floodgates are studied from an economical point of view. an economical and reasonable structure type was selected as an optimization

    本文根據我國某河流中上游流域特徵,通過對該流域水文等資料進行分析與研究,得出在該河流建設水閘的結論,本文在水閘的結構布置設計中,以結構布置滿足防洪標準及結構安全要求為前提,以經濟角度對水閘的各組成部分進行方案研究與優選,選出經濟合理的結構型式。
  20. The reasons of wreckage of the reservoir are as follows : the inadequate, inefficient and outdated information about the reservoir, the lower anti - flood standard and the supervisor ' s ignorance of the reduction of reservoir capacity owing the a accumulated soils over years. so setting up the 3d model of danjiangkou reservoir : and mastering relevant information on water resources matter significantly not only to the dispatch and regulation of danjiangkou reservoir, but also to the forthcoming project of " water in the south to the north "

    水庫失事的原因多為:水文資料不足和未及時掌握水庫有關的水文資料,信息滯后,選用的防洪標準偏低;運行多年,庫內泥沙淤積使有效庫容大幅度減少而管理者對此又未及時掌握等。可見建立丹江口水庫三維模型,及時掌握有關水文資料,不僅對丹江口水庫的調度和管理,而且對即將實施的南水北調都有著深遠的意義。
分享友人