防滲帷幕 的英文怎麼說

中文拼音 [fángshènwéi]
防滲帷幕 英文
impervious curtain; cut-off
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : 名詞(帳子) curtain
  • : 名詞1 (覆蓋用的布、綢、氈子等; 帳篷) covering cloth silk or felt; tent 2 (掛著的簾子) curtain...
  • 帷幕 : parocheth; paroket; heavy curtain; drapery
  1. It is suggested that the impervious wall combined with curtain grouting should be taken as the main vertical impervious body for seepage control, and that the full use of slope wash and fully weathered zone as horizontal impervious blanket should be taken to reduce work load for seepage control

    建議採取截墻結合灌漿作垂直體為主的措施,同時充分利用坡積土和全風化帶作為水平鋪蓋以減少處理工作量。
  2. The cutoff wall near the dam axis, the consolidation grouting and the curtain grouting for the foundation, and the high pressure jet - grouted cutoff wall at the toe of the dam form a vertical anti - seepage system for the dam foundation

    大壩軸線附近的墻、基巖固結和灌漿,以及上游壩腳處的高壓擺噴墻,在壩基構成了垂直體系。
  3. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和性能,對趾板進行了固結和灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  4. The finite element analysis of 3d seepage field for surrounding rock mass of cavern groups of underground powerhouses was performed based on the nodal virtual flux method for solving the non - pressure seepage field and the improved drainage substructure technique for accurately simulating the complex seepage behaviors of densely distributed drainage holes, with emphasis placed on the seepage properties of the anti - seepage concrete curtain and drainage curtain in the anti - seepage and drainage system

    摘要在求解無壓流場結點虛流量法的基礎上,結合可精細模擬密集排水孔復雜流水力行為的改進排水子結構技術,付某地下廠房廠區洞室群圍巖區三維流場進行了有限元求解分析,著重研究了排水系統中的和排水流特性。
  5. Power intake dam section foundation impervious curtain grouting in the dachaoshan hydropower plant

    大朝山水電站進水口壩段壩基防滲帷幕灌漿施工
  6. Design and construction of dam foundation impervious curtain grouting for dachaoshan hydropower station

    大朝山水電站大壩基礎防滲帷幕灌漿設計與施工
  7. Gin is the abbreviation for grouting intensity number. it is showed by the product of the final grouting pressure p ( unit : mpa ) on the grouting section and the grouting volume v ( unit : l / m ) on every one meter of the grouting section, which means the energy consumed on every one meter of grouting section. according to gin method, if during the grouting construction, same energy is consumed on every grouting section, i. e. gin keeps to be a constant, an approximately uniform impervious curtain can be obtained

    Gin ( groutingintensitynumber )即灌漿強度值,它用灌漿孔段上最終的灌漿壓力p ( mpa )和單位灌漿段長度漿液灌注量v ( l / m )的乘積表示,其含義為單位灌漿段上消耗的能量, gin法灌漿認為在灌漿施工中,保持各灌漿孔段上消耗一致的能量,即保持gin為常數,便可形成一道大致均勻的防滲帷幕
  8. Combining achievements in past scientific research, this thesis summarizes some problems in the process of decreasing water, the problems contains : important parameters such as percolation coefficient, interfering radius etc ; designers get parameters from their experience and make their choice of limited prospecting materials too simply, because of the limits, designer ca n ' t make quantitative analysis on groundwater ; differences on breakwater effect of setting water - tight screen is still existed, although research evolvement in this field is done ; they ca n ' t grasp the hydrogeology parameters accurately in that it influences rightness of designing in deep excavation water - decreasing

    本文結合以往的研究成果,總結了降水過程中存在的一些問題,主要包括:重要設計參數,如地層透性、基坑降水影響半徑等,設計中僅從個人經驗出發取值,對有限的勘探資料進行取捨和過分地簡化。這些局限使設計者不能對地下水進行科學的定量分析,盲目性較大;深基坑降低承壓水引起的周邊地面沉降的研究雖已取得很大的進展,但是一些主要問題仍未解決,對防滲帷幕的實際擋水效果存在不同看法;對於弱透水層的水文地質參數一直難以準確把握,影響了深基坑降水設計的正確性。
  9. Through analyzing the seepage observation data of huangtankou concrete gravity dam, foundation seepage behavior are reasonably evaluated. the reason of seepage force rising of individual monolith is impervious elements " flaw and drain holes " block. 4

    分析黃壇口大壩壩基流監測資料,正確評價了壩基排水系統的工作狀態,指出了個別壩段透壓力升高是由於壩基防滲帷幕缺陷和排水孔被堵造成,為工程加固提供了科學依據。
  10. For example, after the collapse of ditong dam in idaho, may 5, 1976, it was found that it was not impervious very well, the impervious curtain was built poorly. when the seepage went through the impervious curtain, the exit water from the pervious material of the downstream or the right side of dam through the foundation or certain line between the foundation and the dam caused contact scour and piping

    如美國愛得華州提堂壩於1976年5月5日潰決,事後調查分析,因壩基透水性大,防滲帷幕施工質量差,流穿透,經地基或地基與壩的接觸面從壩體下游側透水料區逸出或從右壩肩繞經下游壩體逸出,出逸的水流引起了接觸沖刷和管涌,導致潰壩。
  11. Some conclusions are drawn and suggestions put forward, which provide a good basis for safe operator of dam. fourthly, with the optimized seepage coefficient, the seepage state of dongzhang dam foundation and effect of grouting are appraised by comparing several different seepage control schemes, and then some seepage control measures are concluded

    4 、對東張水庫大壩壩基體的流參數進行了優化反演分析,用優化反演得出透系數來評價地基流性態及效應,在此基礎上對不同控方案進行對比研究,提出了控加固措施。
  12. Application of underground grouted seep control curtain technique to water - repellent construction of soil and stone cofferdams for bridge foundations

    地下錨固壓漿防滲帷幕技術在橋梁基礎土石圍堰水施工中的應用
  13. ( 3 ) water - tight screen model experiment is done and based on it, its actual effect is surveyed

    (三)進行防滲帷幕模型試驗,觀測防滲帷幕的實際擋水效果。