隧道定位 的英文怎麼說
中文拼音 [suìdàodìngwèi]
隧道定位
英文
layout of tunnel- 隧 : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 定 : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
- 位 : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
- 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
-
Aiming at the present design fashion of domestic bigger tunnel, simulating a bigger tunnel with catholic characteristic, confirming the parameters of traffic inducement and controlling ( tunnel length, traffic, the selection and location of detection equipments, amount of roadway indicative lamp, etc ) on the base of the analog tunnel, discussing the controlling and revulsive mode of tunnel. briefly discussing the constitution of tunnel surveillance and controlling system and the executive means of traffic controlling and inducement subsystem and network structure of tunnel controlling system. finally discussing the conformation of emulational tunnel ' s database and detailed executive program by programming the computer emulation of controlling induce subsystem
論文圍繞「交通誘導與控制」這一中心展開,探討長大隧道交通誘導與控制設備及其控制誘導方式;結合國內外對交通流模型研究的成果,提出一套適合長大隧道交通流特點的交通流模型;並針對目前國內長大隧道的普遍設計方式,模擬一個帶有普遍性特徵的長大隧道,確定了關于交通誘導與控制方面的參數(隧道長度、交通量、檢測設備的選取和位置、車道指示燈的數目等) ;以此模擬隧道為基礎,進一步探討隧道的具體控制與誘導方式;簡要探討隧道監控系統的構成、交通控制與誘導子系統的實現方式,隧道控制系統的網路架構;最後通過編程實現控制與誘導子系統的計算機模擬,討論關于模擬隧道數據庫的構建,具體編程實現等。Besides, this paper adopts the random finite element method, uses geometric and physical mechanical parameters that are relevant to lining weight of surrounding rock, coefficient of lateral pressure, height or buried depth of vertical loading, elastic resistance coefficients of surrounding rock, elastic modulus of support structure, unit weight of concrete, thickness of the structure as well as torsional strength and compression strength of concrete and etc., as random variables, applies the monte - carlo method to sampling by computer, preliminarily evaluates the reliability of bearing capacity and stability of molded concrete lining of the xuefeng mountain tunnel, and obtains the related displacement of the lining, mean value and variance of internal force, and computed the reliability index of lining structures
此外,本文採用隨機有限元方法,將圍巖容重、側壓力系數、垂直荷載高度或埋深、圍巖的彈性抗力系數、支護結構的彈性模量、混凝土容重、結構的厚度以及混凝土的抗扭與抗壓強度等與襯砌結構有關的幾何與物理力學參數作為隨機變量,應用蒙特卡洛理論進行計算機隨機取樣,對雪峰山隧道模注混凝土襯砌的承載力與穩定性的可靠度進行了初步評估,得出了襯砌的相關位移與內力的均值和方差,並計算出了相應的襯砌結構可靠指標。In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future
本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。It makes decision on stability state of countryrock according to in - situ surveying datum, and grey prediction model is formed using the deformation curve of country rock. this model can predict latter displacement of country rock. deeper analysis is also been counducted on countermeasure and mechanism of softrock tunnel, and gradation analysis method is applied to select the optimum bracing plan
再結合現場實測資料對地下洞室圍巖的穩定狀態進行判別,利用圍巖變形曲線建立灰色預測模型,採用該模型對圍巖位移的後期變形進行預測。對軟巖隧道的支護對策、支護作用機理進行了較深入的分析研究,並利用層次分析法選擇最優的支護方案。And then according to every process of tunnel construction, simulated analysis is carried out. by combining with monitoring and instrumentation of surround rock periphery displacement and the face of land to sink, surround rock with spray laminating force, surround rock body internal displacement, anchor rod axle force and protect and lining build strength, we have carried out scientific analysis and synthesis judgement of the stability of tunnel wall rock and the security of timbering structure
然後,根據隧道施工的各個工序進行模擬分析,並結合對圍巖周邊位移、地表下沉、圍巖與噴層壓力、圍巖體內部位移、錨桿軸力、支護及襯砌強度進行的量測與監控,對量測結果作出了科學分析,從而對隧道圍巖的穩定性和支護結構的安全性做出了綜合評判。Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf
因此,查明采空區的具體位置,在此基礎上對場地進行工程適宜性評價,對整個工程建設具有重要的指導意義。本論文在總結前人對地下采空區勘察及有關穩定性研究方法的基礎上,以山西大寧煤礦鐵路專用線五龍溝1 ~ # 、 2 ~ #隧道采空區為研究實例,在詳細的地表工程地質調查和測繪的基礎上,結合通過對采空區有關人員的探訪,首先對主要開采礦層的空間展布進行地質判斷;然後採用國內外較為先進的工程勘探與檢測儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側一定范圍內(共40米)進行了面波測試,對采空區的可能出露部位進行了較為準確的判斷;最後通過鉆探加以驗證,表明面波儀的測試結果是較為合理可信的。Based on the gathered data, especially displacement data, statistically analyzing and feed back according to various empirical methods, theoretical norm and fem computation are conducted so as to grasp the rules of deformation and stress of ground and structure, assess the stability of ground and structure as well as determine reasonable support time and parameters, ultimately achieve safety without compromised safety
根據獲取的量測信息,尤其是位移信息進行統計分析,依照各種經驗方法和極限應變準則,以及有限元計算綜合進行反饋,把握重疊隧道採用先上後下多臺階開挖工法時圍巖和隧道結構的變形和受力規律,確認圍巖和隧道結構的穩定性,確定合理的支護時機和支護參數,保證施工安全的基礎上追求經濟性。The thesis analyses the influenced factors on the stratum displacement and earth pressure, for example, the thickness of grouting layer, soil property, stiffness of linings, the relative depth of burial, and so on. the results reveal the laws that stratum displacement and the distribution of earth pressure vary with those factors. those results may have some reference value to the construction of shield tunnel
論文較全面地分析了注漿體厚度、土質條件、襯砌剛度、隧道相對埋深對地層位移和襯砌土壓力分佈的影響,揭示了地層位移和土壓力的分佈特徵隨各影響因素的變化規律,這些結果對盾構法隧道的施工和設計具有一定的參考價值。As an important bearing structure, the middle wall in the multi arch tunnel, often dominates the success and safety of a project
中隔墻作為連拱隧道的中樞結構和重要承載構件,其受力及位移情況往往對工程成敗和安全起著決定性作用。Some key technical problems about construction method, vehicle velocity and clearance of the tunnel scheme were discussed according to the geographical location, engineering geological conditions, request of the harbor entrance and shipping, localization of the tunnel and some principal technical criterions
根據泰州公路過江通道的地理位置、工程地質條件、港口航運要求、通道工程定位以及工程的主要技術標準等,對泰州公路過江隧道方案的隧道建設方法、隧道行車速度和建築限界等若干關鍵技術問題進行了分析論證。Through the numerical calculation for improved soil layers, there is an economical and reasonable improved zone whose depth is a constant but whose width is decided by the controlling residual deformation of subway structure. and a empirical formula for the subway residual deformation is given which can consider the improvement depth and width
通過對加固后的地基進行多次有效應力模擬,發現南京市地鐵地基合理的加固深度基本上保持不變,而合理的加固寬度則可由控制震后殘余變形來決定,並給出了計算加固后的地鐵隧道震后殘余位移經驗公式。The process and methods of monitoring measurement in the course of construction are detailed the measuring data analyzed and treated are studied. besides the forecast and calculate of tunnel surrounding rock stably displacement are deeply researched, and according to the uncertainty of geotechnical engineering, grey verhulst model is put forward to forecast tunnel surrounding rock displacement based on optimizing gm ( 1, 1 ) model
介紹了隧道施工監控量測的過程和方法,對量測數據的處理技術與分析方法進行了研究,深入地研究了隧道圍巖穩定位移的預測預報,並針對巖土工程的不確定性,在優化gm ( 1 , 1 )模型的基礎上,提出了用灰色verhulst模型預測隧道圍巖位移。Another major consideration on alignment design is the joints between the tunnel tubes of the existing mtr cross harbour tunnel tsuen wan line. mtrc maintenance requirements stipulate that those joints cannot be obstructed by the cwb to ensure regular inspection and necessary repair works
-定線設計的另一主要考慮因素是現有地鐵過海隧道荃灣線管道之間的接駁位,地鐵公司的維修規定訂明,中環灣仔繞道不得阻礙這些接駁位,以便進行例行檢查和所需維修。分享友人