隧道排水工程 的英文怎麼說
中文拼音 [suìdàobèishuǐgōngchéng]
隧道排水工程
英文
tunnel drainage works- 隧 : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 排 : 排構詞成分。
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 程 : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
- 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
- 排水 : drain off water; drain away water; dewatering
-
In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented
摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道滲漏水調查情況和鐵路隨道涌水狀態分類,運用工程類比法提出適合該地區公路隧道防排水結構設計的隧道涌水類型劃分及對涌水類型校核與細分的三種方法。It is applied to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, to drill drainage holes and grouting pile holes on roof of tunnel gallery
適用於水電站鐵路公路邊坡大噸位預應力錨固孔排水孔隧道口管棚孔的施工,以及預防滑坡巖石坍塌等地質災害治理工程。The panels discussed the recent problems encountered in the tunnelling works project under the strategic sewage disposal scheme ssds stage i and expressed concern on the consequential delay in completion of the project
兩個事務委員會討論策略性污水排放計劃第i階段的隧道挖掘工程最近出現的問題,並對該等問題引致工程完成日期受到延誤一事表示關注。The panels discussed the recent problems encountered in the tunnelling works project under the strategic sewage disposal scheme ( ssds ) stage i and expressed concern on the consequential delay in completion of the project
兩個事務委員會討論策略性污水排放計劃第i階段的隧道挖掘工程最近出現的問題,並對該等問題引致工程完成日期受到延誤一事表示關注。Fc approved a commitment to increase the approved project estimate of 320ds from 487. 6 million by 115. 0 million to 602. 6 million in money - of - the - day prices for ssds stage i : completion of sewer tunnel system from kwai chung to stonecutters island
財務委員會批準一項承擔額,把320ds號工程項目"策略性污水排放計劃第i階段:完成葵涌至昂船洲污水隧道系統"的核準工程預算增加1億1 , 500萬元,按付款當日價格計算,由4億8 , 760萬元增至6億260萬元。Pwsc endorsed a commitment to increase the approved project estimate of 320ds from 487. 6 million by 115. 0 million to 602. 6 million in money - of - the - day prices for ssds stage i : completion of sewer tunnel system from kwai chung to stonecutters island
工務小組委員會通過一項承擔額,把320ds號工程項目"策略性污水排放計劃第i階段:完成葵涌至昂船洲污水隧道系統"的核準工程預算增加1億1 , 500萬元,按付款當日價格計算,由4億8 , 760萬元增至6億260萬元。The ground water inflow into the tunnelling works is settled and filtered to acceptable level prior to discharge into kam tin river, " he said
從隧道工程產生的水流,會經過處理、多重沉澱和過濾,至水質合符標準,才會排放至錦田河。Discussed shallowly the tunnel guards against the dewatering excavation design and construction main point
隧道防排水工程設計與施工要點Proposed works for drainage tunnel in tsuen wan
荃灣雨水排放隧道的擬建工程Tsing yi north coastal road, castle peak road and fan kam road ), drainage improvement works in yuen long and shenzhen river, site formation, slope works, landfill, reinforced fill works, reclamation, and work on rock tunnels and caverns
這些工務計劃包括了道路改善工程(例如青衣北岸道路、青山公路和粉錦公路) 、元朗及深圳河的排水渠改善工程、其他各類計劃的地盤平整及斜坡工程、填土及加筋填土工程、填海工程、開鑿巖石隧道及巖洞等。The panels also discussed the papers on the progress of tunneling works under the stage i of ssds
兩個事務委員會亦討論有關下列事宜的文件:策略性污水排放計劃第一期隧道工程進展The most important task object of all in the process of tunnel construction is karst groundwater. without investigating thoroughly basic condition and dealing appropriately with drainage problems, enormous economic loss would be occurred with hazards to tunnel construction
巖溶地下水是隧道施工建設過程中最主要的工作對象,如果未能搞清楚巖溶地下水的基本情況,解決好排水問題,將會給施工帶來嚴重危害,造成重大的經濟損失。The panels also discussed paper on the updated information on the current situation and the latest progress with the works for the six sewage collection tunnels under ssds stage i
兩個事務委員會又討論載述策略性污水排放計劃第i階段6條污水收集隧道的工程的最新情況及進度的文件。分享友人