隧道片 的英文怎麼說
中文拼音 [suìdàopiān]
隧道片
英文
tunnel sheet-
This paper deals with seismic response of a tunnel - soil system immersed tunnel , as an underground structure , must be compatible with the deformation of the surrounding soil thus the simplified model for a tunnel - soil system is established through two steps at the first step , an mdof system is developed for modeling the foundation soil to this end , dynamic behavior of the foundation soil is analyzed a typical section of the foundation soil simplified as a single mass - spring system on the basis of some equivalent criteria those mass are linked longitudinally by elastic springs to form an mdof system at the second step , the tunnel is treated as a beam on elastic foundation ; that is , the tunnel is connected with the soil massed to form a tunnel - soil system this model has been applied to the seismic analysis of huangsha fangcun immersed tunnel across the pearl river in guangzhou design recommendation is proposed on the basis of this analysis
研究沉管隧道在地震條件下整體受力的分析方法分兩步建立計算模型第一步通過分析場地地基土切片的動力特性,根據等效原則將其化為等效單質點體系,然後在縱向用等效彈簧連接而成為多質點體系的地基土計算模型;第二步將隧道看作彈性地基梁與上述多質點體系通過等效彈簧連結而得到土隧道體系的計算模型本文結合廣州黃沙芳村珠江水下隧道工程實例建立了具體的計算模型並對多種不同的約束條件,進行了縱向與橫向地震響應時程分析,為該隧道的抗震設計提供依據Over here, you can visit the famous movie kingdom - universal studio. experience and learn the movie productions. you will also be in major movie shot locations and experience the special affections of star war, earthquake, volcano, ten commandment. just to name some
參觀拍攝電影的幕後世界-環球製片廠,親身體驗電影世界神奇的一面,這里有數以百計的著名電影道具,數十座的大攝影棚,由廠內攝影專家一一為您介紹影片中的特殊效果,稍後分別游觀山洪爆發海水分開星際大戰大白鯊時光隧道等動態布景現場,親臨其境,趣味無窮。Nonlinear stress analysis on blade of tunnel fan
隧道通風機葉片非線性應力場分析On environmental hygiene, the department launched a new publicity drive in mid 2004, which included television and radio announcements, advertisements at various road tunnel entrances, and at bus shelters and railway stations. banners, posters and pamphlets were also produced
在環境?生方面,本署亦於二零零四年年中展開新的宣傳活動,包括在電視播放宣傳短片和在電臺廣播宣傳聲帶在一些隧道口巴士站及火車站展示廣告懸掛橫額張貼海報,以及派發單張。Application of high performace concrete in lining segment of shield driven tunnel
高性能混凝土在盾構隧道管片中的應用Study on factors influential in metro shield tunnel segment joint bending stiffness
地鐵盾構隧道管片接頭剛度影響因素研究In this paper, it is studied and analyzed characteristic of stress, distortion etc. of pipe liner structure combining dahuofang transport water tunnel practice project, tunnel boring machine construction, and it is considered that affects internal force of pipe liner for early stress of underground structure and digging load. in nonlinear finite element calculation model, folium cells have been simulated among pipe liner and pipe liner and wall rock. under varies load condition, it has educed that changing rule of stress, distortion and load characteristic pipe liner in kinds of wall rock tunnel by analysis and calculation
本文結合實際工程,分析研究了大夥房水庫輸水隧道工程在採用掘進機施工方法的情況下,利用管片襯砌的結構應力、變形等受力特性,考慮地下結構初始應力和開挖荷載對襯砌內力的影響,採用薄層單元模擬襯砌管片之間、襯砌管片與圍巖之間的非線性有限元計算模型,通過分析計算得出不同荷載工況下各類典型圍巖段隧道襯砌管片受力特徵、應力和位移變化規律。Excavation and support technology for deep foundation pit with overhead shield tunnel of existing metro
三區間隧道盾構工程襯砌管片接縫防水技術Application of the mf method normally involves construction of an intermediate column at every 4 meters. on a crossover section, which serves as a passage for train change directions, intermediate columns placed at 4 - meter intervals would block the route of a turning train. therefore, a solution must be found to the problem of location of intermediate columns on crossover sections
(四)轉轍段( crossover )處以多圓形潛盾工法施作之可能性,由於轉轍段系為提供電聯車換軌功能之處,兩軌道間不能有任何障礙物,而多圓形隧道環片間每隔四米即需中間柱,于設計上有何解決之道。Through simulating model tests of shield tunnel passing through the yellew river in the diversion project from south to north china, a systematic analysis on the primary factors affecting joint stiffness, including arrangement of joint bolt, thickness of annular packing of bolt, behavior and thickness of cushion material between two tube plates, magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc., are performed. the study results may provide reference for tube plate design of shield tunnel
通過南水北調穿黃盾構隧道模擬模型試驗,對影響接頭剛度的主要因素即連接螺栓的布置、螺栓墊圈的厚度、管片與管片之間墊層材料的性能和厚度、連接螺栓的預緊力的大小及管片接頭不同的受力狀態進行了系統的分析,為盾構隧道管片設計提供了參考。Abstract : through simulating model tests of shield tunnel passing through the yellew river in the diversion project from south to north china, a systematic analysis on the primary factors affecting joint stiffness, including arrangement of joint bolt, thickness of annular packing of bolt, behavior and thickness of cushion material between two tube plates, magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc., are performed. the study results may provide reference for tube plate design of shield tunnel
文摘:通過南水北調穿黃盾構隧道模擬模型試驗,對影響接頭剛度的主要因素即連接螺栓的布置、螺栓墊圈的厚度、管片與管片之間墊層材料的性能和厚度、連接螺栓的預緊力的大小及管片接頭不同的受力狀態進行了系統的分析,為盾構隧道管片設計提供了參考。Homecoming of this hong kong debut does not merely replicate the one in venice but with new creative works tailored for local audience and venue. with 1 : 5 large - size model, video installation, wide format supergraphics, walk - through tunnel, photographic documentaries and interviews recording, " vice versa " in hong kong is an inventive representation of the venice exhibition, vastly acclaimed by international reporters and critics
是次回應展展出的作品及場地設計亦是特別為本地市民及因應是次展覽場地而重新構思及創作,如1比5大比例模型、錄像裝置、巨型平面作品、供參觀者漫遊的隧道、相片記錄及訪問。" milky stagnant water shown in the picture of one of the press reports is actually the sedimentation pond of west rail s tai lam tunnel works
發言人表示,有關報道內的照片顯示一池奶白色的死水實為大欖隧道工程的沉澱池。Along the coast of pingtan island, fujian in the west of the strait, there is an area with vast distribution of granite, which is ideal for the construction of the tunnel terminal
海峽西端的福建平潭島是大片的花崗巖分佈區,場地開闊,是理想的隧道終端。In this picture, the tunnel on the mountain was the right one which we passed through by bus
像片里山上的隧道正是我們乘坐巴士要經過的地方。This paper discusses the design of the tunnel, and the main contents are the line route simulating, the conformations of lining rings, the structure design and waterproofing
闡述了該隧道的設計概況,主要內容包括:盾構隧道的線路擬合,襯砌環的構造形式,管片的結構設計和結構防水。分享友人