隧道模施工 的英文怎麼說

中文拼音 [suìdàoshīgōng]
隧道模施工 英文
tunnel form construction
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  • 施工 : be in the process of construction; be under construction; build; construction
  1. Pass through mechanical model calculate, discover the vault and arch foot part in the tunnel secondary lining thickness is weakness part, so at the design and construction must strengthen these part

    通過力學型計算,結構在拱腳與仰拱交接處以及拱頂部位為二次襯砌混凝土結構的薄弱部位,設計和時應著重加強。
  2. Based on the cause analysis for failure of water stop of tunnel ' s cast in site circular construction joint from theoretical and constructional point of view as well as the working mechanism of expansive water stop proposed in terms of width of construction joint, the relation between width of circular construction joint and water pressure resistance of water stop is established and its model test carried out

    首先從理論和角度分析了現澆環向縫止水條的失效原因,然後從縫張開度的角度提出了膨脹止水條止水的原理,在此基礎上建立了縫張開度與止水條抗水壓力之間的關系,並進行了型試驗。
  3. In order to achieve the optimized tunneling approach, first, tunneling procedures, shift length, horizontal jet grouting length, bench length and space length between c and d part of crd method are optimized ; on the basis of these results, two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved. as results of the optimized scheme, the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure. the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data

    為得出適合本段程的最佳路線,利用大型有限元通用軟體ansys對開挖順序、開挖進尺、水平旋噴長度、臺階長度及crd的c 、 d部相錯長度進行了有限元數值擬和優化分析,並利用這些分析結果,進行了兩個方案的三維有限元動態擬,得出了較優的方案,並利用后的地表沉降槽曲線,對sk3 + 355斷面處上方的煤氣管線的安全性進行了分析,得出了利用此方案不會造成此處煤氣管線破壞的結論。
  4. A good many case of approaching excavation are studied in this article, such as the study of infection of be coal mining to the huayingshan tunnel, technology study of strucked tunnels of metro in shenzhen, countermeasure study of tunnel approaching pile foundation of metro in guangzhou, excavation methods optimized of large cross section subaqueous tunnel approaching pile foundation of lrt in chongqing, etc. on the basic of analysing and concluding relative study production all over the the world by the numbers, classification of approaching excavation, partition of approach zone, formula of partition of approaching zone, approach degree and countermeasure grade of generalized approaching excavation of underground works are put forward. general methods studying and trea

    本文結合作者多年來對華鎣山減少壓煤量研究、深圳地鐵重疊第11頁西南交通大學博士研究主學位論文技術研究、廣州地鐵公紀區間廣紡聯段鄰樁對策研究和重慶輕軌大坪大斷面車站鄰近基礎淺埋暗挖法優化分析等諸多近接問題案例的研究,在系統分析和歸納總結國內外相關研究成果的基礎上,系統地提出了廣義的地下程近接的分類、分區、分區指標表達式、近接度與對策等級概念以及分區、分度準則,給出了研究和解決近接問題的普遍方法,如數值分析先行,型試驗、現場測試驗證等。
  5. It is also necessary to reconsider station functional arrangements, such as passenger mobility, and the locations of the passenger agent s office, station management office, and electric and mechanical room. all of these factors must be carefully assessed, since side platforms are to be constructed using the mf method

    (七)旅運量與營運式之探討,由於車站如以多圓形潛盾作,其月臺型式將為側式月臺,對旅客動線及相關站務人員、機房之安排需重新考量。
  6. Finally, the thesis primarily sets up the internal force model of the supporting structure system in the bi - arch tunnel, namely, the distribution model of the surrounding rock ' s pressure, the internal force model of the steel framework and the axial force model of the anchor bolt, and these results can have the guiding significance to the design and construction of the similar tunnel engineering

    最後,結合有限元的理論計算及現場實測數據的分析,初步建立了雙連拱支護結構體系的內力型,即:圍巖土壓力型、初期支護鋼拱架內力(主要為軸力和彎矩)型以及錨桿軸力型。充分理解和闡述了構件的作狀態,對今後類似程的設計和具有一定的指導意義。
  7. Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved

    6公里的雪峰山程,首先介紹了支護結構的常用分析計算方法;然後通過對過程中,洞室穩定性與支護結構相互作用機理的深入分析,建立了過程的空間計算型,提出了採用三維彈塑性有限元-無限元耦合的數值計算方法,綜合分析了在不同圍巖特性和圍巖類別條件下,以及不同開挖方案等對圍巖整體穩定和安全性的影響,從而解決了通用有限元方法難以解決的三維無限域問題;其可充分發揮有限元法在分析非線性方面的有效性和成熟性,以及無限元法在分析處理無限域和半無限域方面的精確性和簡便性,為過程中圍巖的穩定性分析開辟了一條新的途徑。
  8. 3. this thesis put forward the reasonablel suggestion on maintenance mode and how to put spare time synthesize scheme to rational use, operation and maintain, management organization, etc. especially to the establishments of qinling mountains tunnel maintain center and the specialities " join scheme in the same spare time and two hours spare time

    對秦嶺維修養護作業式及合理利用開天窗綜合作業方案、運營維護組織、管理機構等問題提出了合理意見,特別對「秦嶺養護中心的設置及在同一天窗內各專業作業相互銜接方案」及「兩小時天窗作業時間」提出了可行方案和依據。
  9. 3d elastoplastic numerical simulation of surrounding rock displacement in soft surrounding rock section during construction process

    軟弱圍巖段過程中圍巖位移的三維彈塑性數值
  10. And then according to every process of tunnel construction, simulated analysis is carried out. by combining with monitoring and instrumentation of surround rock periphery displacement and the face of land to sink, surround rock with spray laminating force, surround rock body internal displacement, anchor rod axle force and protect and lining build strength, we have carried out scientific analysis and synthesis judgement of the stability of tunnel wall rock and the security of timbering structure

    然後,根據的各個序進行擬分析,並結合對圍巖周邊位移、地表下沉、圍巖與噴層壓力、圍巖體內部位移、錨桿軸力、支護及襯砌強度進行的量測與監控,對量測結果作出了科學分析,從而對圍巖的穩定性和支護結構的安全性做出了綜合評判。
  11. The dissertation detailedly explains the engineering geology conditions of zhe gu mount tunnel area, and has researched the crustal stress development process and the regulation of distribution. according to mounts of site tracing investigations, author has researched the formation mechanism of wall rocks at zhe gu mount tunnel. on the base of engineer geology analysis, applying the modern support theory and construction conception of underground engineer, and combining with modern monitor technique and numerical simulation, has researched and discussed about support, forecast and information design - construct etc. three phase on large deformation " prevention

    本文詳細闡明了鷓鴣山程地質條件,對區地應力場演化過程及分佈規律進行了研究;基於大量的現場跟蹤調研,研究了鷓鴣山圍巖大變形的形成機制;在程地質分析的基礎上,運用地下程現代支護理論和理念,結合現代監測技術和數值擬方法,從大變形的支護、預測、信息化設計三個方面對大變形的防治進行了探討。
  12. Also, 40m - length fore - and - aft antique city walls will be utilized to establish the 3d elastic finite - element model. in this case, a reasonable construction technique will be attained as the impact of tunnel construction on terrestrial sedimentation of antique city - wall sectors as well as the stability of mid -

    以及取古城墻前後40m的長度范圍,建立三維彈塑性有限元型,考慮對古城墻段的地表沉降的影響以及中隔墻在時空上的穩定性,得出較為合理的方式。
  13. Monitoring and fem numerical simulation analysis for expressway tunnels construction

    高速公路監測與開挖擬分析
  14. Centrifuge model test technique preferably solves two problems : one is the gravity loss of the model soil, the other is the coupling problem between the seepage field of the ground water and the stress field of the stratum, which is a guidance for other deformation controls under the similar condition

    離心型試驗技術較好的解決了在地下程研究中型土體的自重損失和地層位移分析中地下水滲流場和地層應力場相互耦合作用問題,對于在相似條件下富水地層開挖如何控制地表沉降變形的研究方面具有指導意義。
  15. In this paper, it is studied and analyzed characteristic of stress, distortion etc. of pipe liner structure combining dahuofang transport water tunnel practice project, tunnel boring machine construction, and it is considered that affects internal force of pipe liner for early stress of underground structure and digging load. in nonlinear finite element calculation model, folium cells have been simulated among pipe liner and pipe liner and wall rock. under varies load condition, it has educed that changing rule of stress, distortion and load characteristic pipe liner in kinds of wall rock tunnel by analysis and calculation

    本文結合實際程,分析研究了大夥房水庫輸水程在採用掘進機方法的情況下,利用管片襯砌的結構應力、變形等受力特性,考慮地下結構初始應力和開挖荷載對襯砌內力的影響,採用薄層單元擬襯砌管片之間、襯砌管片與圍巖之間的非線性有限元計算型,通過分析計算得出不同荷載況下各類典型圍巖段襯砌管片受力特徵、應力和位移變化規律。
  16. Based on continuous porous medium seepage model, it is assumed that if waterproofing board of complex lining is perfect, the secondary lining is leakproof, thus the formula of external water load on secondary lining with a grouting loop is deduced

    以連續孔隙介質滲流型為基礎,假定復合襯砌中防水板完好二次襯砌是封閉阻水情況,推導出了有注漿堵水圈的襯砌結構外水荷載計算公式。
  17. Finally, construction technology and the mechanical equipment matching, such as formwork of full - circular monolithic lining for single - line railway tunnel, are studied and some suggestions are given

    最後對相配套的設備- -單線鐵路全環整體築襯砌臺車和藝進行了研究,並提出建議。
  18. 4. the platform and the construction technology for full - circular monolithic lining are studied

    對單線鐵路全環整體築襯砌臺車和藝進行了研究。
  19. 3d finite element simulation on deformation of soil mass during shield tunneling

    地鐵盾構法過程中地層變位的三維有限元
  20. This paper uses system study theory and fuzzy mathematics method to analyze all man - machine - environment factors of rock - loading and transportation process to the influence of construction safety, confirms the hierarchy structure of the transportation system and weight of the safety assessment indes, offers the reliable basis for safety assessment of the tunnel constructrion

    本文運用系統學理論和糊數學方法分析了裝巖運輸過程中人機環境諸因素對安全的影響,確定了運輸系統層次結構及安全評價指針的權重,為安全評價提供了可靠依據。
分享友人