anchor order 中文意思是什麼

anchor order 解釋
錨令
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  • order : n 1 次序,順序;整齊;(社會)秩序,治安;狀況,常態;健康狀態;條理;會場秩序;議事程序,日程;...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. Article 28 for cases of opening kilns, burning wasteland for growing crops, lay anchor, drag anchor, fishing by using explosives or dig sand in the legally demarcated power facility protection zone thus endangering the safety of power facilities in violation of the provisions of this set of regulations, the power administrative departments shall order the violators to stop operation, restore to the original and compensate for the losses

    第二十八條違反本條例規定,在依法劃定的電力設施保護區內進行燒窯、燒荒、拋錨、拖錨、炸魚、挖沙作業,危及電力設施安全的,由電力管理部門責令停止作業,恢復原狀並賠償損失。
  3. By noon the sea went very high indeed, and our ship rid forecastle in, shipp d several seas, and we thought once or twice our anchor had come home ; upon which our master order d out the sheet anchor ; so that we rode with two anchors a - head, and the cables vered out to the better end

    我們的船頭好幾次鉆入水中,打進了很多水。有一兩次,我們以為脫了船錨,因此,船長下令放下備用大錨。這樣,我們在船頭下了兩個錨,並把錨索放到最長的限度。
  4. Obeying this order, we found, or rather, i found - for the gamekeeper was a poor hand at reading anything but print - the following important news : - old anchor inn, bristol

    遵照這個指示,我們發現了,或者毋寧說是我發現了因為獵場看守人除了能看圖畫外,對閱讀任何東西都無能為力下面的重要信息:
  5. However, i had a farther design that he knew nothing of, and that was to make a mast and sail and to fit her with an anchor and cable : as to a mast, that was easy enough to get ; so i pitch d upon a strait young cedar - tree, which i found near the place, and which there was great plenty of in the island, and i set friday to work to cut it down, and gave him directions how to shape and order it

    我在船頭還做了個前帆,以便逆風時行船。尤其重要的是,我在船尾還裝了一個舵,這樣轉換方向時就能駕御自如了。我造船的技術當然不能算高明,然而知道這些東西非常有用,而且是必不可少的,也就只好不辭辛勞,盡力去做了。
  6. In order to find out an economical, practical and reliable supporting method, some relevant technical personnel and i, based on successful experiences and project instances, designed the pre - stress anchor board supporting system, which is to exert pressure on the anchors and to independently support slopes. this system has successed and replaced the pile - anchor supporting system used in past

    為探索一種經濟、實用、可靠的支護方法,結合一些成功的經驗和工程實例,筆者與有關技術人員一起設計了預應力錨板墻支護技術,在錨桿上施加預應力,主動、獨立支護邊坡,取代了過去了常用的樁?錨支護體系,並實施成功,成為島城近年來深基坑支護主要技術之一。
  7. In order to satisfy the demands of the main pylon measure benchmark stakingout and the cable anchor - pipe positioning for cable - stayed bridge, a new georobot relative datum 3d polar coordinate method is presented

    摘要結合斜拉橋索塔基準放樣及斜拉索預埋鋼管的精密定位的需要,提出了一種新的基於測量機器人的三維相對基準放樣方法,並成功用於灌河特大橋斜拉橋主橋的施工放樣。
  8. For example, frp reinforced concrete is used to support or surround magnetic resonance imaging ( mri ) medical equipment, and frp is also used for the constructions of some seawalls, industrial roof decks, base pads for electrical and reactor equipment, anchor in rock and ground engineering and concrete floor slabs in aggressive chemical environments in order to promote the wide usage of frp and frp reinforced concrete structures, financed cooperatively by nationa l natural science foundation ( item : the research on mechanical performance of frp reinforced concrete beam reinforced ; number : 59978046 ) and henan illustrious youth science foundation, connected with the analysis methods of modern steel reinforced concrete structure, the thesis further studies the flexural performance of frp reinforced concrete beam through the systematic study on experimental data got from this kind of beams, systematically establishes the theoretical calculating system of the flexural performance of frp reinforced concrete beam in cooperation with the up - to - date analytical methods for reinforced concrete, which suits the properties of frp

    例如,纖維增強塑料筋應用於支撐和圍繞磁共振成像醫療設備的混凝土中及海堤、工業頂棚、電設備、反應設備的基座、巖土工程中的錨桿、侵蝕性環境的混凝土結構等海洋工程、橋梁工程、路面工程、巖土工程、醫療及化工工程的建設。為了推動纖維增強塑料筋及其混凝土結構在工程中的廣泛應用,本文在國家自然科學基金(項目名稱:纖維增強塑料筋混凝土梁力學性能的研究;編號: 59978046 )和河南省傑出青年基金的資助下,通過對纖維增強塑料筋混凝土梁正截面受彎性能試驗數據的系統分析,結合現代鋼筋混凝土結構學的分析方法,對纖維增強塑料筋混凝土梁正截面受彎性能進行了深入的研究,較系統的建立了適合於纖維增強塑料筋特點的纖維增強塑料筋混凝土梁正截面受彎性能的理論計算體系。
  9. In this paper, several novel techniques of immobilizing indicators are developed in order to anchor the indicators in supporting materials of the sensing layers

    本論文提出了幾種新的熒光指示劑染料的固定化方法,將熒光指示劑牢固地固定在敏感層支持體材料上。
  10. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
  11. No one shall go out to meet a ship bringing wine or other merchandise coming to the town, in order to buy anything, before the ship be arrived and come to anchor for unlading ; and if any one does so and is convicted, the merchandise which he shall have bought shall be forfeited to the king

    在運送葡萄酒或其他貨物前往本城的商船抵達並且拋錨卸貨之前,任何人都不能前往購買葡萄酒或其他商品;倘有人違法並被確認,他購買的貨物將被沒收上繳王上。
  12. On the basis of stability analysis, the author takes the k27 + 825 slope from the type of slope which has lest stability as an example. according to its basic feature, the design ueses the choosed best reinforce and control scheme : lattice beam, anchor wire, grouting and abstraction of water. in the course of design, the author takes into account not only reasonable optimize of whole control plan but also local measure such as whether the unstable block will shear from vnlnerable sections when control plan is laid out concretely, in order to reach the goal of reasonable design and effective control

    在穩定性分析的基礎上,以邊坡穩定性最差的一類中的k27 + 825邊坡為例,結合其自身的特點,用優選出的加固防治方案:框架梁+錨索斗灌漿+排水進行設計,設計中既考慮總體防治方案的合理優化,又充分考慮了加固工程的具體布置時是否存在不穩定體從錨索或框架梁的薄弱部位剪出的可能性等一些細部措施,以達到合理設計,有效及經濟治理的目的。
  13. In order to optimize the perpetuation tensioning tonnage of prestressed pier anchor wire of goupitan arch dam, first the scheme contrast method is adopted to define the perpetuation tensioning tonnage combination of the primary and secondary anchor wire, but the optimization result is that the pull - anchor coefficient is too big ; then the body form of the pier is optimized ; finally the anchor wire perpetuation tensioning tonnage is optimized by using ansys optimization design module based on parametric fem, the optimization result is acceptable and the pull - anchor coefficient is lowered down

    摘要為優化構皮灘拱壩中孔預應力閘墩錨索永存張拉噸位,首先採用方案優選的方法確定主次錨索永存張拉噸位組合,但優選結果拉錨系數偏大,再對閘墩體型進行優化,然後採用基於參數化有限元的ansys優化設計模塊對主次錨索永存張拉噸位進行優化,優化結果滿足應力控制要求,降低了拉錨系數。
  14. In order to restrict the displacement of relaxed rock effectively, the factors affecting the efficacy of anchor measures are analyzed according to mechanism of action of anchor. in terms of principle orthogonal design, the influence of parameters of anchor to displacement of excavation slope are elevated by computing using finite element method simulation, and the optimal scheme of anchoring parameters including length of anchors and space between bolts and thickness of shot concrete are defined. finally, the optimal scheme of anchor parameters are determined with considering results of theory analyse and numerical calculation, which provide theory bases for engineering

    為了有效防治邊坡開挖后巖體的鬆弛變形,根據錨桿的作用機理對影響錨固效果的主要因素進行分析,並利用處理多因素試驗的科學方法?正交設計原理,以有限元數值計算為手段,以有效約束邊坡開挖位移為標準,評價了錨桿長度、錨桿間距、混凝土噴層厚度等錨固參數對邊坡變形的影響大小和規律,經過比較分析最終提出了錨固參數的優化設計方案,為工程設計提供了理論指導。
  15. In order to discuss the similarities and differences of the interaction in different terms, adopt single factor alteration method to analyze it more in the paper. discuss the influence each factor alteration makes the horizontal displacement and stress of stabilizing pile from three aspects, earth parameter of sliding plane ( c 、 ), anchor cable parameter ( pres - tress 、 stiffness ), pile parameter ( burying deep 、 space between ), ascertaining the main factors that influence stabilizing pile with anchor cable

    論文中主要從滑裂面土體的抗剪強度參數( c 、值) 、錨索的參數(錨索預應力大小和錨索的剛度)和樁參數(樁的埋深和樁間距)三個方面來討論每個因素變動對樁身水平位移和兩側結點應力的影響,從而確定影響錨索抗滑樁的主要因素。
  16. The main factors have been determined to be the depth and width of hole, the strength of surrounding rock, the types of detonator, the decoupling coefficient, burden and unit consumption form what has been discussed, the author make use of those major factors as standard of affection and studied bp neural networks " work principle, structure and defectiveness. a model of modified bp neural networks has been used to built model in order to identify selection and optimize of blasting in rock anchor beam. triumphant parameter design of blasting were selected as a example, in order to perform network of parameter design

    確定以炸藥類型、最小抵抗線、孔深、炮眼間距、不耦合系數、線裝藥量、巖石強度和巖體完整度為主要影響因素;把改進的bp演算法應用在爆破參數優化設計中,建立以炸藥類型、最小抵抗線、炮孔深度、炮眼間距、線裝藥量、不耦合系數、巖石強度和巖體完整度為主要影響指標,選擇45例國內外成功的爆破參數設計實例為樣本,利用bp神經網路進行爆破參數優化設計,並通過現場保護層和巖臺修面爆破試驗以及對其松動圈范圍進行聲波測試,其測試結果最優的爆破方案其松動圈最小,這與神經網路進行參數優化設計的爆破方案相吻合。
分享友人