bridge-tunnel 中文意思是什麼

bridge-tunnel 解釋
跨海大橋
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  1. According to time of operation, the buses are divided as follows : numbers that start with " 2 " are morning and evening rush hour buses, numbers that start with 3 are night buses ; according to location, buses are divided as follows : puxi buses, pudong buses, buses that cross the river including tunnel and bridge lines, and suburban area buses [ 700s & 900s ] ; according to payment method, the buses are divided into : single - ticket rmb 1 ( lines of 13 kilometer or less from end to end ) and rmb 1. 5 ( lines of 13 kilometers or more from end to end ) ticket - sellerless buses ( most two digit city buses and three digits buses starting with " 1 ", " 2 ", " 7 " are of this kind ; no change will be made, but terminal stations and hubs will have rmb 1 and rmb 1. 5 ticket booklets for sale, 50 non - refundable tickets per booklet ), and also single ticket rmb 2 air - conditioned buses and scaled - price ticket special lines ( including specialty coach lines starting with " 5 ", pudong specialty lines starting with " 6 ", mid - size coaches that start with " 8 ", double - decker buses and air - conditioned coaches that start with " 9 ", as well as the ten air - conditioned tourism lines [ and airport buses ] )

    按運營時間分,有:日間公交車、 「 2 」字頭的早晚高峰車和「 3 」字頭的夜宵車;按地域范圍分,有浦西的、浦東的、過江的(含大橋、隧道線)和郊區線;按票務方式分,有單一票價1元(全程13公里以下的線路)或1 . 5元(全程超13公里的線路)的無人售票車(市內公交號碼為兩位數的或三位數中「 1 」字頭、 「 2 」字頭、 「 7 」字頭的線路絕大多數是無人售票車,自備零錢,不找零,公交終點站、各主要交通樞紐均有1元和1元5角兩種面值的公交預售票出售,每本50張,售出不退) ,還有單一票價2元的空調車和多級票價的專線車(有「 5 」字頭的大巴專線、 「 6 」字頭的浦東專線車、 「 8 」字頭的中巴專線和「 9 」字頭的雙層車或空調大巴,還有十條空調旅遊專線) 。
  2. Wind tunnel testing for stonecutters bridge tower

    昂船洲大橋橋塔的風洞測試
  3. Miscellaneous tolls such as tunnel, bridge and parking tolls are excluded from the tariff and only charged on actual consumption basis

    所有雜費包括隧道停車場橋費出入閘費等實報實銷
  4. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  5. Chesapeake bay bridge - tunnel

    切薩皮克海灣大橋
  6. Tunnel and bridge tolls

    隧道費過橋費
  7. Your limousine is a luxurious mercedes benz e class for up to four passengers to and from hong kong international airport, including all luggage handling charges, tunnel and bridge tolls and driver gratuities

    我們特別安排了可供4人乘坐的豪華e - class賓士房車,接載您往返香港國際機場。為讓您的旅程倍感舒暢,行李處理費隧道過橋費及司機小費已包括在內。
  8. The entire hzmb is a 35km dual 3 - lane carriageway in the form of bridge - cum - tunnel structure comprising the 29km zhujiang section from the landing point at gongbei of zhuhai and a prola of macao to the boundary of the hksar, and the 6km hong kong section from the boundary of hksar to the landing point at san shek wan of lantau island. the project includes

    整條港珠澳大橋分為珠江和香港兩段,珠江段長約29公里,從位於珠海拱北和澳門明珠的大橋陸點至香港特別行政區區界,而長約6公里的香港段則由香港特區區界至位於香港大嶼山石灣的香港側陸點,工程范圍包括: -
  9. Introduction to bridge - tunnel combination solution for quanzhou bay cross sea passage project

    泉州灣跨海通道工程橋隧組合方案介紹
  10. The shanghai yangtze river bridge - tunnel, currently under construction, will provide strong impetus to the development of dongtan

    正在建設中的上海長江橋隧工程,成為東灘開發強勁的推動力。
  11. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、橋梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。
  12. The synthetic maintenance corporation on the principle of " one job with multi - duty " and reducing the fixed number of employees and departments, is in charge of regular maintenance of track, signal, bridge, buildings and tunnel structures, intermediate and overhaul repair of signal, buildings and structures, supply of water and electricity

    固定設備的其他養護維修由綜合養護維修公司負責,按照維修中心模式統一管理固定設備的養護維修,按照一職多能、壓縮機構、減少定員的原則。公司不設置線路、橋隧和路基等大修單位,需要時可以對外招標承包完成。
  13. Brief introduction of engineering case for treatment of bridge and culvert soft foundation with gravel pile and of tunnel soft foundation with high - pressure jet grouting pile

    簡單介紹了採用碎石樁進行橋涵軟基處理,採用高壓旋噴樁進行隧道軟基處理的工程實例。
  14. The production of hong kong eagle union construction materials widely applies to the airport, the railroad, the bridge, the tunnel, the municipal administration, the real estate, the room inside and outside decoration, water conservancy facilities, etc

    香港鷹聯建材公司穗美特產品廣泛應于機場、鐵路、橋梁、隧道、市政、房地產、室內外裝飾、水利設施等相關行業。
  15. Danbi bridge is actually the main road in the temple of heaven between the hall of prayer for good harvest and imperial vault of heaven. it is 360 meters long and 29. 4 meters wide. a tunnel passes through under the path, so it is called a bridge

    丹陛橋是連接祈年殿和皇穹宇的南北大道,長360米寬29 . 4米,因道下有一隧洞與其交叉,故名橋。
  16. The difference in level between the road surface in the tunnel and that on the bridge can hardly be less than 10m.

    隧道內的路面和橋上的路面之間的高差幾乎不可能小於10米。
  17. In order to ensure the quality of filling and the construction stability of the high - speed railway subgrade. " prescription of design of line, bridge, tunnel and station of high - speed railway " regulated that the filling used in the bottom of high - speed railway subgrade must be the type of a, b or improved soil

    即將修建的京滬高速鐵路對路基的填築質量要求很高,為了嚴格控制高速鐵路路基的變形,使未來的高速鐵路具有一個穩固的軌下基礎,適應列車高速運行的要求, 《京滬高速鐵路線橋隧站設計暫行規定》對高速鐵路的基床底層填料性能提出了具體要求,必須使用a 、 b組填料或改良土。
  18. Value range and contraposing design measure of anchorage topology parameter is put forward to provide theoretical basis for optimum design of suspension bridge tunnel anchorage

    給出了錨碇拓撲參數的取值范圍和針對性的設計措施,為懸索橋隧道式錨碇的優化設計提供了理論基礎。
  19. Yuanfang brand yfd branch s cable is rational because of the structure, technology advanced person, measuring strictly, product quality is in the leading level of the same trade, but apply to distribution systems, such as house, high - story office building, tunnel, hotel, hospital, market, etc. extensively, can apply to the main pole thread and have illuminations system that branch thread requires too ( the highway, bridge, tunnel and airfield runway )

    遠方牌yfd分支電纜由於結構合理、工藝先進、嚴格檢測,產品質量處于同行業領先水平,可廣泛應用於住宅、高層辦公樓、隧道、賓館、醫院、商場等配電系統,也可應用於主桿線有分支線要求的照明系統(公路、橋梁、隧道及機場跑道) 。
  20. Prior to joining the international bridge, tunnel and turnpike association, one of the founding members of its america, schuster also held positions with the motor vehicle manufacturers association

    在加入國際橋梁、隧道及公路協會之前,舒斯特,作為美國智能交通協會的創始人之一曾就職于汽車製造業協會。
分享友人