date tested 中文意思是什麼

date tested 解釋
試驗日期
  • date : n 1 日期。2 時期;時代,年代。3 〈美口〉(和異性的)約會;〈美俚〉約會的對象。4 〈口語〉同日;本...
  • tested : 測試
  1. In practice they have been type and routine check tested by the thousand according to the most up to date standards and safety regulations

    並且根據最新的標準和安全規則進行許多類型和程式檢測。
  2. The free technical service period is 12 months, which will be calculated from the date that tested to be qualified

    免費調試技術服務期為12個月,自本工程驗收合格之日起開始計算。
  3. Your gre score report will arrive at the center where you tested approximately 6 weeks after the test date

    您的gre成績大約在考試日6周後到達您參加考試的考點。
  4. We will credit nego. bank a / c at any bank of their choice seven working days from the date of reveiving your tested telex / authenticated swift by us stating lc no., amount, value date, dhl no. and date

    今天有一份沙特的信用證,要求在單據相符的情況下發電報給開證行通知他們議付情況,其中涉及到起息日的問題,覺得有點難以確定,請各位高手幫我看看,原文是這樣的。
  5. 5 summary a subsurface runoff model with water storage and recharge is developed in this paper based on the bous - sinesq - storage equation. the sensitivity of the model parameters is also tested. the subsurface runoff model is applied to a river basin with observed precipitation, observed air temperature data, observed runoff data, and a base flow separation algorithm in order to vali - date the model application

    5結論與討論基於boussinesq - storage方程發展了同時考慮水分儲存和入滲的地下徑流機制,分析了模型參數的敏感性,並針對淮河流域的的息縣控制站所控制的區域,利用降水徑流資料及通用的基流分離演算法進行了驗證
  6. Provide automatic test function of fiber diameter, directly observe fiber configuration on screen, and display the actual diameter of all fiber on - time. fast test speed, simple operation, and reduced personal error. automatically compute mean diameter, coefficient of variation and standard deviation of the tested fiber, the tested date can be printed out by excel

    提供了纖維直徑自動測量功能,可直接在顯示器上觀察纖維形態,實時顯示每根纖維的實測直徑;測量速度快,操作簡便,減少了人為誤差;可自動計算已測纖維的直徑平均值、變異系統和標準差,測試數據可以excel報表形式列印輸出。
  7. According to the requirement of a certain air - borne tracking system, we primarily finish the development of air - borne tws date processing system by using oriented object programming theory. the tws data processing system includes models such as, auto track initiation, auto track expiry, track maintenance, track initiation by hand, track expiry by hand, and communication i / o etc. the tws data processing system developed and encapsulated as engineering software is tested by radar simulator and practical radar

    根據某型機載對地跟蹤系統的研製要求,利用面向對象的程序設計思想,初步設計研製完成了機載對地tws數據處理系統,包括量測數據預處理,自動目標起始與終結,手動目標起始與終結,跟蹤維持,通訊介面等模塊。
  8. 33 “ performance certificate ” means the contractor ' s certification, stating the date on which the subcontractor ' s obligations shall be considered to have been completed, to be issued after the latest of the expiry dates of the period pursuant to sub - clause 9. 1, or as soon thereafter as the subcontractor has completed any outstanding work, including remedying defects, tested all the subcontract works, and fulfilled the subcontract, all to the satisfaction of the contractor

    "履行證書"指總包商所簽發的證書,其中陳述了分包商義務應被認為履行的日期,最晚在根據副條款9 . 1所述的期間期滿后簽發,或在其後當分包商已完成所有未決工程(包括修復缺陷) ,測試所有分包工程,履行分包合同,並均使總包商滿意后即刻簽發。
  9. To date, researchers have successfully tested several copper oxide - based prototypes that have been cooled to near 70 k with liquid nitrogen

    到目前為止,研究人員已經成功測試了數種,以液態氮降溫至接近70k的銅氧化物原型樣品。
分享友人