deep-water cofferdam 中文意思是什麼

deep-water cofferdam 解釋
深水圍堰
  • deep : adj 1 深的;深處的;…深的,有深度的。2 深遠的;深奧的,奧妙的;深謀遠慮的。3 深陷…中;埋頭…中,熱...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • cofferdam : 沉箱
  1. The design amp; construction of single - wall steel pile cofferdam in deep water

    深水基坑單壁鋼板樁圍堰設計與施工
  2. Application of steel sheet pile cofferdam on excavation of deep water foundation pit

    鋼板樁圍堰在深水基坑開挖施工中的應用
  3. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下巖石爆破,浮運鋼圍堰就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。
  4. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  5. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  6. Based on the construction practice of steel cofferdam for pier base of main pier no. 6 close to the pylon of sutong bridge, the key techniques for design and construction of the deep water double - wall steel cofferdams of the bridge are described

    摘要以蘇通大橋近塔墩主6號承臺鋼圍堰工程實踐為基礎,介紹該橋深水雙壁鋼圍堰設計、施工的關鍵技術。
  7. With reference to the hydrologic data and geologic conditions of the changjiang river over the years, this paper analyzes the features of and key technical problems to be resolved in the construction of in - water pier foundations in the north river branch of tianxingzhou changjiang river bridge. accounts for the construction organization principle preparation and construction implementation of the foundations, comparison and selection of working platform and steel cofferdam to be used at each pier site, and also summarizes the construction methods for the deep water steel cofferdams of the bridge

    摘要根據長江歷年水文資料、地質情況,分析了天興洲長江大橋北汊水中墩基礎施工的工程特點和要解決的關鍵技術,介紹了施工組織的原則制定和實施過程、各墩位平臺及圍堰的方案比選,總結了該橋深水鋼圍堰的施工方法。
  8. Its main span, which is 60m long, is made up of prestressed concrete continuous beam. the fourth pier, one of the main piers, adopts the compound foundation constituted with double - siding steel cofferdam and drilled shafts which stands on the deep - water and slopping river bed where geological condition is very complex, so the cofferdam has the trend of slippage

    渝懷鐵路第20標段阿蓬江大橋全長343 . 06m ,主跨為60m的預應力混凝土連續梁, 4 #墩是其一個主墩,基礎採用雙壁鋼圍堰與鉆孔樁相結合的復合基礎。
  9. The construction method using steel boxed cofferdam is a chief method for construction of pile caps in deep water

    摘要鋼吊箱圍堰施工方法是深水承臺施工中的一種主要施工方法。
  10. Acting as the major component for construction of pile caps in deep water, the rational design of the cofferdam has a direct bearing to the construction quality of whole bridge

    鋼吊箱作為深水承臺施工的主要構件,其設計的合理與否關繫到整個橋梁的施工質量。
分享友人