expected time of arrival 中文意思是什麼

expected time of arrival 解釋
船舶到港預報
  • expected : 期待,期望
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  • of : OF =Old French 古法語。
  • arrival : n. 1. 到達,抵達。2. 到達者;到達物。3. 出現,登場。4. 新生嬰兒。
  1. In addition, airway winds, which are essentially grid - point wind and temperature data over the south china sea for 15 flight levels between 10, 000 and 43, 000 ft, are disseminated to the radar data processing and display system ( rdpds ) of the cad for calculation of the expected arrival time of aircraft at check points

    除此之外,氣象數據處理系統將飛機航道風的數據傳送至民航處的雷達數據處理及顯示系統,這些數據是風和溫度的網格點值,其水平范圍覆蓋南海,垂直范圍是由10 , 000至43 , 000尺之間的15個飛行高度;以上資料可用來計算航機抵達各定位點的時間。
  2. In addition, airway winds, which are essentially grid - point wind and temperature data over the south china sea for 15 flight levels between 10, 000 and 43, 000 ft, are disseminated to the radar data processing and display system rdpds of the cad for calculation of the expected arrival time of aircraft at check points

    除此之外,氣象數據處理系統將飛機航道風的數據傳送至民航處的雷達數據處理及顯示系統,這些數據是風和溫度的網格點值,其水平范圍覆蓋南海,垂直范圍是由10 , 000至43 , 000尺之間的15個飛行高度以上資料可用來計算航機抵達各定位點的時間。
  3. A new method is presented. the travel time, including the time delays associated with overland folw pathways, is obtained. it is expected that the hillslope velocity and the stream velocity are different, and different equation is used. in the method, the fact that velocity increases going downstream in river systems is taken into account. after the travel time of each cell being calculated, the frequency distribution of the times of arrival of individual water droplets at the catchment outlet - giuh, is obtained

    提出了一種匯流時間計算方法,匯流時間中包括坡地漫流時間和河道匯流時間。方法中坡地單元的匯流速度與河道單元的匯流速度採用不同的計算公式,同時考慮流速沿河道向下游的變化。流域中每一個網格單元的匯流時間得到后,將其看作隨機變量,進行統計分析后,得到匯流時間的頻率分佈? giuh 。
  4. 5 for cargo lots over 1, 000 m / t each, or any other lots less than1, 000 metric tons but identified by the buyer, the seller shall, at least10 days prior to the date of shipment, inform the buyer by telex or cableof the following information : the contract number, the name of commodity, quantity, the name of the carrying vessel, the age, nationality, andparticulars of the carrying vessel, the expected date of loading, theexpected time of arrival at the port of destination, the name, telex andcable address of the carrier

    一次裝運數量超過一千噸的貨載或其它少於一千噸但買方指明的貨載,賣方應在裝船日前至少10天用電傳或電報通知買方合同號、商品名稱、數量、船名、船齡、船籍、船隻主要規范、預計裝貨日、預計到達目的港時間、船公司名稱、電傳和電報掛號。
  5. 6 for cargo lots over 1, 000 m / t each, or any other lots less than1, 000 metric tons but identified by the buyer, the master of the carryingvessel shall notify the buyer respectively 7 ( seven ) days and 24 ( twenty - four ) hours prior to the arrival of the vessel at the port ofdestination, by telex or cable about its eta ( expected time of arrival ), contract number, the name of commodity, and quantity

    一次裝運數量超過一千噸的貨載或其它少於一千噸但買方指明的貨載,賣方應在裝船日前至少10天用電傳或電報通知買方合同號、商品名稱、數量、船名、船齡、船籍、船隻主要規范、預計裝貨日、預計到達目的港時間、船公司名稱、電傳和電報掛號。
  6. 5 for cargo lots over 1, 000 m / t each, or any other lots less than 1, 000 metric tons but identified by the buyer, the seller shall, at least 10 days prior to the date of shipment, inform the buyer by telex or cable of the following information : the contract number, the name of commodity, quantity, the name of the carrying vessel, the age, nationality, and particulars of the carrying vessel, the expected date of loading, the expected time of arrival at the port of destination, the name and telex of the carrier

    一次裝運數量超過1000噸的貨載或其他少於1000噸但買方指明的貨載,賣方應在裝船日前至少10天用電傳或電報通知買方合同號、商品名稱、數量、船名、船齡、船籍、船隻主要規范、預計裝貨日、預計到達目的港時間、船隻公司名稱和電傳。
  7. On receipt of this and similar information from other seismograph stations in different countries, ptwc would determine the location, depth and magnitude of the earthquake and assess the likelihood of a tsunami. it would send a message to participating countries and territories on details of any tsunami forecast including the expected arrival time and amplitude of the tsunami at different locations around the pacific

    太平洋海嘯警報中心收到各國地震站的地震資料后,會計算地震震中位置、深度和地震強度並且評估發生海嘯的可能性,並向參與的國家及地區發送詳細海嘯預測資料,包括預期海嘯到達太平洋沿岸各地區的時間及海嘯高度等。
  8. Etad expected time of arrival and departure

    船舶預計到達和離開時間
  9. Our expected time of arrival in london is 19 : 45, local time

    我們預計到達倫敦的時間是當地時間19 : 45 。
  10. Within 48 hours immediately after completion of loading of goods on board the vessel the seller shall advise the buyer by telex of the contract number, the name of goods, weight ( net / gross ) or quantity loaded, invoice value, name of vessel, port of loading, sailing date and expected time of arrival ( eta ) at the port of destination

    貨物裝船完畢后48小時內,賣方應即以電傳通知買方合同號、商品名稱、所裝重量(毛/凈)或數量、發票價值、船名、裝運口岸、開船日期及預計到達目的港時間。
  11. The emitter location methods commonly include : angle of arrival ( aoa ) measurement, time - difference - of - arrival ( tdoa ) measurement and aoa together with tdoa measurement. this paper derive some important techniques and theories bearing upon passive location in this field. three kinds of passive location algorithm in three - dimensional ( 3 - d ) space are deduced based on that of 2 - d space. at the same time each performance is analyzed, each graph of geometric dilution of precession ( gdop ) is emulated for different station position, different measurement error, and different target height. accordingly some valuable academic and emulational results are obtained by myself, which will provide researches in this field with definite technical refrence. at the end of this paper, the passive location method of jtids ( joint tactical distribution systems ) is discussed, which is expected to enforce the tactical performance of jtids in the intending development

    本文汲取了該領域有關被動定位的重要技術和理論,在二維平面無源定位演算法的基礎上推導出了三維空間內的三種無源定位演算法,並對各自的定位性能進行了理論分析和計算機模擬,模擬出不同的布站、不同的測量誤差以及不同輻射源高度的情況下,三種定位方法各自對應的定位精度( gdop )分布圖,同時對各自的定位性能進行了改進處理,得出了一些有價值的理論和模擬實驗結果,這些結論可為今後在此領域的研究提供一定的技術參考。
分享友人