full load test 中文意思是什麼

full load test 解釋
滿載試驗
  • full : adj 1 充滿的,裝滿的。2 充分的,豐富的;擠滿的;(吃、喝等)盡興的,3 (精神)飽滿的。4 完全的,...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. The test shall demonstrate to the satisfaction of the owner that the equipment meets all specified performance criteria, is properly installed and anchored, and operates smoothly throughout the specified speed range without exceeding the full load amperage rating of the motor or excessive motor heating

    測試應該讓用戶滿意,證明這些設備符合所有規定的性能標準,經過正確的安裝和錨固,在額定轉速范圍內運行平穩,沒有超過電機的額定滿負荷運轉電流安培數,或發生電機過熱。
  2. Full load safety test, overload device and brake tests

    安全設備滿載試驗,超載感應器和制動器試驗
  3. Full load test

    最高載重測試
  4. Braking test when laden : the braking track shall not be longer than 2. 5 meters after a cute braking when the ruck is traveling in full speed with 1. 5 m / t test load on the forks

    荷重時剎車檢定:牙叉荷重1 . 5噸砝碼時,以全速(最高速)行駛,在緊急剎車時,其剎車痕跡不得超過2 . 5公尺。
  5. A load - displacement full - process analyzing program of cfrp - confined rc eccentrically loaded columns is given. the computed results of load - displacement coincide with test results

    編制荷載-撓度全過程計算程序對碳纖維布約束偏壓柱進行數值分析,程序計算曲線與試驗曲線吻合良好。
  6. Braking test when laden : the braking track shall not be longer than 2. 5 meters after a cute braking when the truck is traveling in full speed with 1. 5 m / t test load on the forks

    荷重時剎車檢定:牙叉荷重1 . 5噸砝碼時,以全速(最高速)行駛,在緊急剎車時,其剎車痕跡不得超過2 . 5公尺。
  7. Full - range of loading to the reinforced concrete columns with reinforced concrete cover during second stage of loading is analyzed by computer - test nonlinear developed in the text, in consideration of the condition that they are not unloaded or partly unloaded. based on the analysis, a simplified method is put forward in the paper to calculate the load capacity of cross - section of axially and eccentrically compressive rc columns with reinforced concrete cover. a theoretical calculation method is given to the practical engineering

    本文針對實際工程中經常採用的外包鋼筋混凝土加固鋼筋混凝土柱的加固方法,考慮到實際加固工程是在不卸載或部分卸載情況下進行,利用計算機對外包鋼筋混凝土加固柱二次受力后進行非線性全過程分析,在此基礎上提出外包鋼筋混凝土加固柱軸心受壓和偏心受壓正截面承載力的簡化計算公式,為實際工程中外包鋼筋混凝土加固柱的結構設計提供了理論計算方法。
  8. A way to avoiding crack or reducing crack width of concrete or reducing distortion of member is using prestressed concrete. the writer tried to make full use of the merit of the prestressed concrete and designed prestressed concrete mandril to control crack of structure. the prestressed concrete mandril, which was firstly applied high pressure on a small concrete bar, and then was made in concrete, so it would act as reinforced bar and resist load. in this thesis the writer designed 24 mmnbers and had experimental study of them, reached the conclusion that the effect of resisting crack of the prestressed concrete mandril was good when the load was not large, it can enhance the capacity of resisting crack and reduce the crack distance and crack width, but when the loads was large, the effect of resisting crack was not good, when we used the prestressed concrete mandril and reinforced bar together in member, the effect of resisting crack was very good. the writer analysed the adherence mechanism and wreck mechanism of the prestressed concrete mandril in anxial tension members, and according to the character of the prestressed concrete mandril, the writer constructed the bond model of it. then the writer introduced the analysis theory of crack including the bond - slip theory, the non - slip theory, the synthesis theory and mathematics stat method. the different theory had different theory base, they considered that the primary affection of crack width was different. in this test, the crack distance and crack width of members which placed reinforced bar were match to the compute value of the code gb 50010 - 2002 very well. to the members which

    本文共進行了24根試件的試驗研究,得出了預應力混凝土芯棒能較大地提高構件抗裂承載力,在荷載小於預應力混凝土芯棒的開裂荷載時有較好的抗裂效果,能較大地減小裂縫間距和裂縫寬度,但是當荷載較大預應力混凝土芯棒開裂時預應力混凝土芯棒的抗裂效果不是很好,若將普通鋼筋和預應力混凝土芯棒一起使用時則有很好的抗裂效果。本文分析了預應力混凝土芯棒在軸拉試件中的粘結機理和破壞機理,根據預應力混凝土芯棒本身的特點,提出了預應力混凝土芯棒與后澆混凝土之間的粘結模型。然後本文詳細介紹了經典的裂縫分析理論粘結滑移理論、無滑移理論、綜合理論和數理統計方法,各理論有著各自不同的理論基礎,認為影響裂縫寬度的主要影響因素也各不相同。
  9. Timely monitor of their stress in each working conditions can ensure the safe of support and main arch circle with full - automatic data acquisition system. the results of dynamic - load and dead - load test of the bridge indicate that the main arch has enough strength and rigidity and reachs design requirements

    使用全自動數據採集設備和處理系統,對每一工況下的支架、拱圈應力進行適時監控,確保了施工過程中支架和主拱圈的安全。成橋靜動載試驗表明許溝大橋主拱結構具有足夠的強度和剛度,達到了設計要求。
  10. The assumption about deformation character and constitutional relationship of high strength concrete and reinforcement under elevated temperature is proposed making use of the general regularity of high strength concrete compression - flexure member. the ultimate load capacity and deformation of high strength concrete compression - flexure members under elevated temperature are analyzed by means of full - range and non - linear analysis method. the computing results and test data are in good agreement

    根據高溫時高強混凝土壓彎構件的一般規律,給出了高溫時高強混凝土和鋼筋變形特徵的假設和本構關系,利用全過程非線性分析方法分析了高溫時高強混凝土壓彎構件的極限承載力和變形,計算結果與試驗結果吻合較好。
  11. Full rated load test

    十足最高額定負載測試
分享友人