layer construction 中文意思是什麼

layer construction 解釋
分層鋪築
  • layer : n 1 放置者,鋪設者,計劃者。2 【賽馬】(一般)賭客。3 產卵的雞。4 【軍事】瞄準手。5 層;階層;地...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Construction technology of backfill and compact by layer of the refuse foundation

    矸石地基回填分層壓實處理施工技術
  2. To improve the binding strength between the deck slabs and deck surfacing layer of badong changjiang river highway bridge and to provide the surfacing layer with anti - cracking ductility, a series of technical measures has been taken in the construction of the deck surfacing of the bridge, including those of embedding binding reinforcement in the deck slabs, spraying inorganic binding agent between the slabs and layer, replacing part of the cement with micro expansion agent and adding appropriate amount of polypropylene fibers to the concrete

    摘要巴東長江公路大橋橋面鋪裝,通過採取預埋橋面粘接鋼筋、噴塗無機界面粘結劑、用微膨脹劑替代部分水泥、在混凝土中摻入適量的聚丙烯纖維等措施來提高橋面板與鋪裝層間的界面粘結強度和給橋面抗裂增韌。
  3. The method of close water test has been used for a long time, so richer experience has been achieved. however, it not only takes pains and time, but also consumes raw materials during the close water test because of miscellaneous working procedures such as bricklaying in the two ends of pipe, water - repellent layer plastering, maintaining and water offletting, brick - block backouting after the test, especially in the region short of water and some drainage pipe with prop - pipe construction. in order to satisfy the fast development of municipal construction, new detection methods should be developed

    閉水試驗方法因其應用時間較長,目前已積累了較豐富的經驗,但在閉水試驗時,管道兩端砌築磚堵、抹防水層、養護、灌水浸泡,以及試驗后的放水、磚堵拆除等繁雜工序,不僅費工、費時,而且消耗原材料,尤其是在缺水的地區以及頂管施工的無壓管道,這些矛盾更加突出;因此,為滿足迅速發展的市政建設需要,有必要探索新的檢測方法,閉氣試驗就是其中一種,但是閉氣試驗目前還不完善,有待于進一步深入研究。
  4. Through the experimental research, we think : the technological capacity of fiberglass asphalt macadam if weaker than asphalt macadam, however, if use elasticized capacity to solve blending technological problem. adjust the breed of fiber silk, extend its diameter, its paving capacity is still worth exploring, asphalt - rubber macadam structure lager have good deformed - become capacity and crazed - resistance capacity, small gap rate. good water - resistance capacity, good hot - stability and simple construction technology. therefore. pitch rubber spall is a good cover material which is suitable for the second class or lower whose asphalt pavement has split open because of fatigue. and is the good structural measure of preventing half - rigidity grass - roots unit shrink - rift reflecting. pave a thin layer of pitch rubber spall between asphalt - type pavement layer and half - rigidity basic level, although the cost of building is higher than paving togongbu in the middle, the construction technology, crazing - resistance and water - resistance are better than togongbu, not only could reduce greatly the reflex of half - rigidity grass - roots unit material, long then the use lifespan of pavement, but also it is possible to reduce suitably the thickness of asphalt mixture layer, though the cast of building in the early days becomes more, in the long - term opinion, it have fully important technological and economical significance

    通過試驗研究認為:玻璃纖維瀝青碎石的技術性能不如瀝青碎石好,但路用彈性性能較好,如能解決拌和工藝問題,調整纖維絲的品種,增大其直徑,其路用性能仍值得探討,瀝青橡膠碎石結構層具有變形性能和抗裂性能良好,空隙率小,防水性能好,熱穩定性較好,施工工藝簡單的特點,因此,瀝青橡膠碎石是二級及二級以下公路因疲勞而開裂的瀝青路面的良好罩面材料,也是防止半剛性基層收縮裂縫反射的良好結構措施,在瀝青類路面面層和半剛性基層之間夾鋪瀝青橡膠碎石薄層,雖然造價比夾鋪土工布高,但其施工工藝,抗裂性能和防水性能均優于土工布,不僅可以大大減少半剛性基層材料的反射裂縫,延長路面使用壽命,而且可能適當減薄瀝青混合料面層的厚度,雖然初期造價有所增加,從長遠來看,具有十分重要的技術和經濟意義。
  5. The article puts forward a solution that the fontal machine system for the problems of the data concentration, bank " s multi - channel join - in and the host " s dispose efficiency during the construction of finance eleclrolysation ; designs and realizes the fore - born child process communication layer of the fontal machine system

    本論文對金融電子化建設過程中面臨的數據大集中、多通道接入、銀行主機處理效率等問題,提出前置機系統解決方案;設計和實現了前置機系統的預先派生子進程的通訊層。
  6. Design and construction of groundwork in the sand layer

    砂墊層基礎的設計與施工措施
  7. The hanging wall of sag extended in southeast direction, with the tulage fault being the boundary fault. yinggete - bagemaode metamorphic core complex developed adjacent to northwest of chagan sag, which evolved from late jurassic to cretaceous with three - layer construction style. the kinematics mechanism of metamorphic core complex and chagan sag is a simple shear model, chagan sag extended and faulted as the metamorphic core complex rised

    在查干凹陷西北側發育英格特?巴格毛德變質核雜巖帶,可能具有三層結構模式,其形成與演化時代為晚侏羅世末?白堊紀;該變質核雜巖與查干凹陷的運動學機制為統一的簡單剪切模式;在變質核雜巖隆升的同時,查干凹陷發生伸展斷陷。
  8. To do the investigating and studying work about the achievements of tackling key problem of the quondam exploration of front - zone of mountain, to analyze and study the applicability about the gathering technology used in the seismic exploration of the complicated construction belt of front - zone of mountainous ; 2. combining the quondam achievements, researching the design method of observation system objective of the complicated construction belt based on seismic - geology model, firstly, building the surface level and deep layer seismic - geology model of complicated construction belt and analyzing the forward model, secondly, designing the observation system aiming at the overthrust nappe structure in section and in area ; 3. aiming at the complicated earth ' s surface condition of front - zone of mountain, how to select the exciting method and the parameter, how to optimize the environment of exciting method and reception, how to pledge the normal combination of the datum of different exciting method ; 4

    根據山前帶的地震地質條件特點,本文主要研究了以下幾個方面的內容: 1 、對以往山前帶地震攻關成果開展調研工作,分析研究在山地山前復雜構造帶所採用的地震勘探採集技術的適用性; 2 、研究基於地震地質模型的復雜構造帶觀測系統目標設計方法:如何建立復雜構造帶的表層、深層地震地質模型,利用正演分析目標區的觀測系統;針對逆掩推覆體構造,如何分區分段有針對性設計觀測系統等; 3 、針對復雜地表條件的山地山前帶,如何選擇激發方式、參數,如何優選激發、接收環境,如何保證不同激發方式的資料能正常拼接; 4 、山前帶巨厚礫石區的表層結構調查技術及靜校正方法研究。
  9. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要介紹了混凝土集裝箱堆場施工工藝與質量控制,工程採用振動梁和振動棒相結合的小型機械法施工,通過對關鍵工序如:施工測量、場區基層碾壓、二灰層施工、鋼筋施工、模板施工、混凝土面層的施工工藝與質量控制,表明小型機械法施工能滿足工程需要,工程完成後符合驗收標準,滿足了業主的使用要求,對于同類工程的施工具有借鑒意義。
  10. 3 the effect of soil layer construction on earthquake wave propagation the effect of soil layer construction on different waveform is not uniform

    3 、場地土層結構對地震波傳播的影響土層結構對不同類型的地震波的傳播有不同的影響。
  11. Yinggete - bagemaode metamorphic core complex belt with three - layer construction is put forward, which evolved from late jurassic to cretaceous. the extensional simple shear model of the chagan fault depression is established. the tectonic evolution and the dynamics character of chagan fault depression and its adjacent mesozoic - cenozoic basins are discussed : at the end of triassic continental orogeny increased crust thickness crust uplift and denudation were happened ; jurassic was a period of local partly extensional collapse of erogenic belt and cretaceous was a period of widely extensional collapse of postorogenic erogenic belt ; cenozoic was a period of the development of stable intracontinental depression with the character of long distant collision response and weaked compression flexure

    討論了查干凹陷及鄰區中-新生代盆地構造演化及其地球動力學特徵,三疊紀(印支期)為陸內造山作用與地殼增厚、隆升剝蝕階段;侏羅紀(燕山早期)為造山後造山帶的局部伸展垮塌階段;白堊紀(燕山晚期)為造山期后大規模伸展垮塌作用與伸展盆地的發育階段;新生代(喜山期)為遠距離碰撞效應與弱擠壓撓曲性質的穩定大陸內坳陷的發育階段。
  12. Three groups of six single layer construction, building common services for the outsourcing industry to undertake the modernization of buildings

    三組錯落有致的六大單體建築,共同構建為承接服務外包產業的現代化樓宇。
  13. Some significant results were obtained. 4. on the basis of statistical analysis, effect coefficients of the platform values and the characteristic periods for three kinds of soil layer construction were obtained by comparing them with those of norm profiles 5

    將不同土層結構的計算結果,按不同地震動輸入和場地類別分組統計,然後與其對應的不含軟夾層的正常剖面的計算結果進行比較,統計得到不同土層結構對反應譜平臺值和特徵周期的影響系數。
  14. Modified ak - 16a anti - skid layer construction

    型抗滑表層的施工
  15. This machine adopts two species of drillingtechnique of direct and reverse circulation, the efficiency enhances observably in the process of ovum, gravel and rock layer construction

    該機可採用正反循環兩種鉆進工藝,在卵、礫、巖層施工中,效率顯著提高。
  16. In this paper, according to current practical requirement of information technology and sales management, a new conception putting the idea of customer relationship management into sales management system of erp is put forward, and the contents and methods of their integration are studied. then a method of customization - oriented quotation is proposed. by means of the model of double - layer construction combining c / s and b / s, the sales management system based on erp is researched and developed

    本文結合當前信息技術和銷售管理的實際需要,提出了將客戶關系管理的理念融入erp銷售管理系統的構想,研究了它們的集成內容和方法;探討了面向客戶化定製的產品報價方法;並採用c s與b s相結合的雙層架構模式設計和開發了基於erp解決方案的銷售管理系統。
  17. 3. for three kinds of different soil layer construction, the characters of the platform values and the characteristic periods of ground surface acceleration response spectra were studied

    3系統地研究了軟夾層在底部、中部和頂部的三種土層結構的反應譜平臺值和特徵周期的主要特徵。
  18. 2 according to the analysis of sem, ftir and xrd, we can draw such conclusion : intercalation of cms into kaolinite has collapsed the layer construction of kaolinite, which makes the single layers dispersed in the bodies of cms. the experimental results show that intercalation of cms into kaolinite improves the electrorheological effect

    2通過羧甲基澱粉的二次插層,結合xrd圖譜,紅外圖譜及sem圖分析可知, cms的插層引起了高嶺土片層之間的剝離,其單一片層分散於羧甲基澱粉中,形成剝離型納米復合材料。
  19. How to consider the effects of soil layer construction and adjust the response spectra according as soil layer construction is an important subject in current site study

    如何考慮場地土層結構對設計反應譜的影響,併合理的規定設計反應譜是當前場地研究中的重要課題之一。
  20. Then introduced the basic conception, model and their solving schemes for the electronic commerce. discussed the electronic commerce application system construction, already from traditional 2 layers develop the n layer construction

    然後介紹了電子商務的基本概念、模型及解決方案。討論了電子商務應用系統結構,已從傳統的2層發展到n層結構。
分享友人