place of loading 中文意思是什麼

place of loading 解釋
裝貨處
  • place : n 1 地方,場所,處;所在,位置;〈抽象名詞〉空間 (opp time)。2 (書中的)處所,頁。3 市區;市,...
  • of : OF =Old French 古法語。
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  1. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑灌注樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的施工工藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。
  2. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  3. In any situation whatsoever and wheresoever occurring and whether existing or anticipated before commencement of or during the voyage, which in the judgment of the carrier or the master is likely to give rise to risk of capture, seizure, detention, damage, delay or disadvantage to or loss of the ship or any part of her cargo, or to make it unsafe, imprudent, or unlawful for any reason to commence or proceed on or continue the voyage or to enter or discharge the goods at the port of discharge, or to give rise to delay or difficulty in arriving, discharging at or leaving the port of discharge or the usual or agreed place of discharge in such port, the carrier may before loading or before the commencement of the voyage, require the shipper or other person entitled thereto to take delivery of the goods at port of shipment and upon failure to do so, may warehouse the goods at the risk and expense of the goods ; or the carrier or the master, whether or not proceeding toward or entering or attempting to enter the port of discharge or reaching or attempting to reach the usual place of discharge therein or attempting to discharge the goods there, may discharge the goods into depot, lazaretto, craft, or other place ; or the ship may proceed or return, directly or indirectly, to or stop at any port or place whatsoever as the master or the carrier may consider safe or advisable under the circumstances, and discharge the goods, or any part thereof, at any such port or place ; or the carrier or the master may retain the cargo on board until the return trip or until such time as the carrier or the master thinks advisable and discharge the goods at any place whatsoever as herein provided ; or the carrier or the master may discharge and forward the goods by any means, rail, water, land, or air at the risk and expense of the goods

    四、不論任何地方任何情況,不論是在開航前或航程中存在或預料到的,只要承運人或船長認為可能有導致捕獲、扣押、沒收、損害、延誤或對船舶或其貨物不利或產生滅失,或致使起航或續航或進港或在卸貨港卸貨不安全、不適當、或非法,或致使延誤或難于抵達、卸載或離開卸貨港或該港通常或約定的卸貨地,承運人可在裝貨或開航前要求發貨人或與貨物權利有關的其他人在裝貨港口提回貨物,如要求不果,可倉儲貨物,風險和費用算在貨主頭上;承運人或船長,不論是續航至或進入或企圖進入卸貨港,或抵達或企圖抵達港口通常的卸貨地,或企圖在此卸貨,也可將貨物卸在倉庫、檢疫站、駁船,或其他地方;船舶也可續航或回航,直接或間接地,抵達或停留在船長或承運人在此情況認為安全或適當的任何港口或地點,全部或部分將貨物卸在此港口或地點;承運人或船長也可將貨物留在船上,直到回航或直到承運人或船長認為適當時將貨物卸到本合同所規定的任何地方;承運人或船長也可卸貨並將貨物用任何交通工具,經鐵路、水路、陸路、或空運轉運貨物,風險和費用算在貨主頭上。
  4. Provided that when damage to the ship is discovered at a port or place of loading or call without any accident or other extraordinary circumstance connected with such damage having taken place during the voyage, then the wages and maintenance of master, officers and crew and fuel and stores consumed and port charges incurred during the extra detention for repairs to damages so discovered shall not be admissible as general average, even if the repairs are necessary for the safe prosecution of the voyage

    如果船舶的損壞是在裝貨或停靠港口或地點發現的,而且航程中沒有發生過與此項損壞有關的任何意外事故或其他特殊情況,則在修理上述損壞的額外停留期間所支付的船長、高級船員和一般船員的工資、給養和消耗的燃料、物料和港口費用不得認作共同海損,即使這項修理是安全的完成航程所必需的。
  5. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄洪閘預應力閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力錨索的點位施加錨索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。
  6. It should be noted that the chosen place of delivery has an impact on the obligations of loading and unloading the goods at that place

    需要說明的是,交貨地點的選擇對于在該地點裝貨和卸貨的義務會產生影響。
  7. It is provided by the result of observing for the trial of pile, if the cast - in - place is constructed according to strict technological process, the limit load - bearing capacity of single pile is more larger then its calculational value, and under the function of the most trial loading, the frictional drag haven " t occur yield in every major loading layer, so the pile have greatly safety reserve in engineering

    樁試驗的觀測結果證明,按照嚴格工藝流程施工的鉆孔灌注樁,其單樁極限承載能力遠大於計算值;在最大試驗荷載作用下,各主要持力層均未出現摩阻力屈服現象,樁有較大的工程安全儲備。
  8. Fair average quality at the time and place of loading shall be assessed upon the basis of london corn trade association ' s official ' s f. a. q. standard

    裝運地裝貨時的平均中等品質,以倫敦穀物貿易協會官方平均中等品質為準。
  9. Fair * * * erage quality at the time and place of loading shall be assessed upon the basis of london corn trade association ' s official ' s f. a. q. standard

    裝運地裝貨時的平均中等品質,以倫敦穀物貿易協會官方平均中等品質為準。
  10. This article aims at the characteristics of a baibie harbor great bridge, by the spot construction test and mechanicses, limited an analysis, dissolve to the construction technics and loading capacity, stake deliver mechanism, bearing stratum and glazing rock depth area curve etc. s of the borehole cast - in - place concrete pile in the karst terrain do the some study research

    國內外對于巖溶地區鉆孔灌注樁的研究,主要是針對具體工程的施工方案描述和施工故障及處理措施,對巖溶地段基樁的承載機理及承載力的綜合研究則未見報道。本文針對白墅港大橋的特點,通過現場施工試驗及力學、有限元分析,對巖溶地區鉆孔灌注樁的施工工藝、荷載傳遞機理、持力層厚度及嵌巖深度等方面做一些探討性研究。
  11. A material nonlinear finite element analysis for the cast - in - place reinforced concrete hollow slab that occurs from initial loading, cracking, yielding to failing is carried on. the cracking load, ultimate load, the displacement rules and the principal stress distribution rules of the hollow slab under the vertical loads are obtained. a material nonlinear finite element analysis for the single span hollow flat - plate floor is also carried on

    其次對空心板進行了從加荷、開裂、屈服直至破壞的全過程材料非線性有限元計算,得到了空心板在豎向荷載作用下的開裂荷載、極限荷載及位移和應力分佈規律;還對單跨無梁樓蓋進行了材料非線性有限元計算,通過分析主應力場明確了柱上暗扁梁的作用;有限元計算的結果驗證了以上的理論分析並得到了一些重要的結論,對改進現澆空心板無梁樓蓋的構造措施有重要的參考價值。
  12. Note for the transporters : this document must accompany the consignment ( 2 ) from the place of loading for dispatch until it reaches the point of destination

    運輸注意事項:本份文件從裝運港直到貨物抵達終點港都必須跟隨貨物。
  13. The work presented in this thesis is part of the research project - similitude laws and nondestructive diagnosis on concrete pavements, which is supported by china national science foundation. 9 slabs were tested to failure with factors of slab thickness, size ratio of geometrically similar slabs and loading place taken into account

    本課題在國家自然科學基金項目「混凝土路面板相似理論與損傷診斷研究」 (批準號59978015 )資助下,進行了不同厚度、不同幾何相似比的9塊剛性路面板的試驗研究。
  14. Then, the size of the snap - back zone propagating towards the loading end increases until snap - back of the entire system takes place

    遠離加載端的區域先回跳,然後回跳區域逐漸擴大,向加載端傳播,直到整個系統都回跳。
  15. Provided that when damage to the ship is discovered at a port or place of loading or call without any accident or other extraordinary circumstance connected with such damage having taken place during the voyage, then the wages and maintenance of master, officers and crew and fuel and stores consumed during the extra detention for repairs to damages so discovered shall not be admissible as general average, even if the repairs are necessary for the safe prosecution of the voyage

    如果船舶的損壞是在裝貨或停靠港口或地點發現的,而且航程中沒有發生過與此項損壞有關的任何意外事故或其他特殊情況,則在修理上述損壞的額外停留期間所支付的船長、高級船員和一般船員的工資、給養和消耗的燃料、物料不得認作共同海損,即使這項修理是安全的完成航程所必需的。
  16. [ article 10 ] the time of arrival or departure, the place of stay, any moving during their stay and the time for loading or discharging the cargoes or articles of all inbound and outbound vessels, trains and aircraft shall be notified in advance to the customs by the carrier or related communications and transport units

    第十條進出境船舶、火車、航空器到達和駛離時間、停留地點、停留期間更換地點以及裝卸貨物、物品時間,運輸工具負責人或者有關交通運輸部門應當事先通知海關。
  17. The steps necessary to place a computer in fully operational status ; it, typically, consists of loading the operating system

    使計算機完全進入運行狀態必需的步驟,它通常包括裝入操作系統。參閱coldboot 。
分享友人