rock filling 中文意思是什麼

rock filling 解釋
巖石充填
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • filling : n. 1. 裝滿,填裝;填補。2. 填料;填土。3. (糕點內的)餡。4. (織品的)緯紗,漿料。
  1. The technology, which is developed on the basis of perfora ting techniques for oil wells and cement injection techniques, can not shoot thr ough the frozen pipe wall at predetermined ground location using energy - gatheri ng - blasting techniques, but also consolidate shaft wall rock by cement injectio n and filling along the frozen pipe and perforated hole s trajectories, achievi ng leakageproof of shaft walls and reducing vertically - added force

    它利用聚能射孔爆破技術,在預定地層位置將凍結管射穿,同時在地面利用凍結管及射孔彈道對特定地層進行注漿充填加固,既可實現井壁堵漏,又能減少由於地層沉降對井壁的垂直附加力。
  2. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  3. Apart from dredging and rock - filling works, several piles have been erected in the harbour

    維港內除了挖泥和填土工程外,已豎立了數根樁柱。
  4. This is the other main reason for the overpressure in kuche depression to be preserved. we analyzed the effect of fracture in the gas deposit formation and hold that different kinds of fracture have different effect : hydrocarbon dissipation and relief effect of crossing salt bed faults that run through source rock, reservoir, and caprock ; filling effect of under salt bed faults that run through source rock and reservoir ; slippage faults that did not connect source rock have no effect to hydrocarbon accumulation and dissipation ; adjusting faults in reservoir have effect of adjusting formations for hydrocarbon distribution

    分析了斷裂在天然氣成藏中的作用,認為不同類型的斷裂在天然氣成藏過程中的作用是不同的:貫通生、儲、蓋層的穿鹽斷層對油氣散失和泄壓作用;貫通源巖和儲層的鹽下斷層對抽氣運聚的充注作用;不連接源巖的滑脫斷層對油氣聚散無作用;儲層內調整斷層對油氣分佈起調整層位作用。
  5. Abstract : the paper is based on the working particle for sever al bridges in the construction of w8 section of sheng - yan railway project. it sy stematicaly instructs the construction method of bore - hole filling pile in the rock area with under - earth mined - out layer

    文摘:筆者以神延鐵路w8標段多座橋梁工程實踐為基礎,系統介紹了有地下采空層的巖石地區鉆孔灌注樁施工的方法
  6. He was deeply impressed to see the workers breaking large bars out of steep walls of rock and filling the valley with thunder. greywacke becoming gravel through massive hammer strokes

    當時,工人們震天動地從巖壁上取下巨石以及用錘把硬砂巖敲打成碎石的情景給他留下深刻的印象。
  7. It is considered that the sequence evolution in the palaeozoic went through the following three stages, the filling of evaporate platform, the filling of carbonate and detrital rock mixed deposits in epiric sea, and the filling of detrital deposits of lake - deltas in paralic inland sag

    認為研宄區古生界層序演化經歷了以下三個階段:蒸發臺地充填階段、陸表海碳酸鹽巖與碎屑巖混合沉積階段,以及近岸內陸坳陷的湖泊三角洲碎屑巖沉積階段。
  8. Trial production blasts of the rock filling materials for shuibuya concrete face rockfill dam

    水布埡混凝土面板堆石壩填築料開采爆破試驗
  9. So far as the mixing material for building the earth - rock fill dam with clay core for shiquanhe hydropower station is concerned, the effect from the variation of the sand content for the filter material on the maximum dry density and the relevant parameters are to be determined within the variation area of the mixing mass ratio of ( 46 ~ 54 ) : ( 54 ~ 46 ) through this experiment, due to the max, dry density is largely influenced by the mixing ratio of both the lifter material and the clay and the sand content of the filter material, so as to determine the actual filling compactness of the mixing material of the core

    摘要由於獅泉河水電站粘土心墻土石壩摻合料的最大幹密度受反濾料與粘土料的摻合比例、反濾料含砂率的影響較大,因此擬通過本試驗確定摻合質量比在( 46 ~ 54 ) : ( 54 ~ 46 )范圍變化時,反濾料含砂量變化對最大幹密度的影響程度及相關參數,從而確定心墻摻合料填築的實際壓實度。
  10. Experiment on self - compacting concrete filling rock - fill

    自密實混凝土充填堆石體的試驗
  11. Support of filling behind brickword for high stress soft rock

    高應力軟巖巷道壁后充填支護研究
  12. Rock mechanics analysis of structural parameters of stope using back - filling method

    階段空場嗣後充填采礦法采場結構參數的巖石力學分析
  13. With teeny - bop, hard rock and classic rock, maine ' s summer music menu is filling up

    有金屬搖滾、重搖滾和輕搖滾,緬因的夏季音樂套餐的菜單正在被填滿。
  14. Through the statistic and analysis of rock core crack, sonic wave velocity test, microcosmic structure of core slice observation by electron microscope, core strength test to the sampled damaged slope rock mass, it indicates that the damage degree of smooth blasting to slope rock mass has no obvious relation with blasting scale but with the line density of explosive filling and the strength of the rock in damaged area decreases evidently

    通過受損邊坡巖體取樣巖芯裂隙的統計分析、聲波速度測試、巖芯切片微觀結構的電鏡觀察及巖芯的強度試驗,發現光面爆破對邊坡巖體的損傷程度與爆破規模無明顯關系,而與光爆孔的線裝藥密度有關,損傷區巖石的強度明顯降低。
  15. Because the rock quarrying and filling are greatly influenced by the climate, the construction method and quality control are the most key link in the construction of rockfill dam

    由於堆石料的開采與填築等施工受氣候的影響較大,因此施工方法和質量控制是最關鍵的環節。
  16. The study consists of construction technologies of rock - fill filling of concrete facing rock - fill dam in negative temperature condition, manufacture and fill of cushion layger, exceedingly frost - resisting property of concrete facing and the protection of concrete facing in winter etc. these technologies have been come up to advanced domestic standards and some gaps in the fields of same technology has been filled in

    這些技術包括砼面板堆石壩在負溫條件下壩體堆石填築及墊層料的制備與填築技術、高抗凍性面板砼技術、面板砼的越冬防護技術等。
  17. ( 4 ) through the constant application of value engineering, make the merit maximization as the direction of construction, and ' then productivity of rock - fill material constantly increased, therefore construction schedule of embankment filling were quickened and the engineering construction were completed 120 days before the limited time

    ( 4 )應用價值工程,以功能價值最大的項目作為改進方向,隨著價值工程的不斷深入,價值的不斷提高,堆石料的生產率也不斷上升,加快了大壩填築施工進度,使得整個主壩填築工程施工工期提前了120天。
  18. Regard this as the starting point, this paper deduces the random error formula of the filling and opening fractured rock mass by using the transmission law of the error and calculates the error combined with the actual project

    以此為出發點,利用誤差的傳遞定律推導出了充填裂隙巖體和張開裂隙巖體的隨機誤差計算公式,並結合實際工程問題分別對充填裂隙和張開裂隙兩種情況下利用隨機誤差公式進行了的誤差分析。
分享友人