second-stage cofferdam 中文意思是什麼

second-stage cofferdam 解釋
第二期圍堰
  • second : adj 1 第二的;第二次的;二等(的)。2 次等的;較差的;劣於…的 (to)。3 〈美國〉較年輕的。4 另一...
  • stage : n 1 講臺;舞臺;戲院,劇場;〈the stage〉戲劇,戲劇藝術;戲劇文學;〈the stage〉戲劇業;劇壇。2 ...
  • cofferdam : 沉箱
  1. Design of demolition blasting of complicated structure of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游圍堰砼防滲墻復雜結構拆除爆破設計
  2. Blasting monitoring and safety control during the demolition blasting of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游圍堰混凝土防滲墻拆除爆破震動監測與安全控制
  3. This paper analyzes and explores stress strain model and principle of the project of concrete diaphragm wall after concluding other engineers and project practices and describing the seepage and deformation character of the plastic concrete used in the cofferdam of the second stage of the three gorges project. we analyze and forecast the change trend by using mathematics statistics regression, then we get the best regression equation. finished it, we used this way to the cofferdam of the second stage of the three gorges project. it proves that the method which i have introduce in this article is effective for the stability of concrete diaphragm wall and it is also a valid for supervising cofferdam security after using it in many projects

    本文在總結前人和其他工程實踐的基礎上,結合三峽二期土石圍堰實例綜合分析塑性混凝土防滲墻的滲透和變形特性,對三峽二期圍堰砼防滲墻的應力應變模型、原理進行了分析、探討,在監測分析資料的基礎上進行數學統計回歸分析,並對變形進行預測,通過對砼防滲墻及堰體的應力應變監測數據進行數學統計回歸分析,得出了最佳回歸方程,並對三峽二期圍堰變形進行預測,達到了對圍堰安全性監測評價的最佳效果。
  4. Experimental research of blasting demolition of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游圍堰混凝土防滲墻拆除爆破試驗研究
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  7. Strategies for draining pit water during construction of the second - stage cofferdam of the three gorges project

    三峽工程泄洪壩段蓄水初期實測滲流性態分析