tunnel slot 中文意思是什麼

tunnel slot 解釋
封閉槽
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  • slot : n 1 狹縫,窄孔;【機械工程】漕溝;自動售貨機投錢口。2 【航空】翼縫。3 〈美口〉(集體或系列中的)...
  1. A slot was cut in the back plate of the double - foil shield to improve the flow field with air diversion method. the flow field and droplets trajectory near the shield are simulated in wind tunnel by fluent software to analyze the wake flow affecting the spray drift. from simulation, the improved shield spray in reducing drift is better than double - foil shield spray and conventional spray in six types of wind velocity

    本文採用導流法在雙圓弧罩蓋上開口,利用fluent模擬分析和比較罩蓋噴霧流場,並模擬該流場下的霧滴運動軌跡來分析霧滴的飄失性,模擬結果表明:結構改進后的罩蓋噴霧流場得到改善,其減少霧滴飄失的效果好於原罩蓋,更優于常規無罩蓋噴霧。
  2. Water invasion bursten out during the railway - tunnel construction is usually the mainly problem in constructing or operating, also which brings surface water to exhaustion and pollutes environment or effects ecology, etc. the geleshan tunnel which crosses through guan - yin gorge anticline which trend is near south north, is located between tuanjie village and jingkou village of the shapingba zone, chongqing city, which is belongs to the inducting segment of yu - huai railway. the guan - yin gorge anticline appears to ridge and slot interlacing in land form, and is composed of clastic rock and carbonate rock from jurassic xintiangou group to triassic

    歌樂山隧道位於渝懷線引入段重慶市沙坪壩區團結村至井口村之間,隧道穿越近南北向的觀音峽背斜,地貌上表現為脊、槽相間,觀音峽背斜由侏羅系新田溝組至三疊系下統碎屑巖和碳酸鹽巖組成,歌樂山頂大部分出露可溶巖地層,地表巖溶發育,有大量泉水和暗河出口,並修建有多個中小型水庫、大量池塘和水井。
  3. First, on the base of investigating geleshan geologic environments, the author carefully analyzes them, studies their water storage structure, discusses the relationship of underground water dynamic changes and tunnel drainage by desiccation ; secondly, the author makes the dynamic analysis, regression analysis, routine hydrochemistry analysis, isotope analysis, so draws to guan - yin gorge anticlire east and west slot ' s karst developing features, alternated conditions underground water and supplying drain ways ; thirdly, by stating the fissuring ' s surveying data, the author calculates the seeping tensor

    作者在進行歌樂山地質環境調查的基礎上,仔細分析了大量觀測資料,研究其儲水構造,掌握地下水動態變化與隧道施工涌水的關系,及補給受降雨的影響情況。對隧道周圍的地下水進行動態分析、回歸分析、常規水化學分析以及同位素分析,得出觀音峽背斜東西翼槽谷的巖溶發育特徵,及地下水的循環交替條件、補給排泄途徑;統計分析裂隙測量數據,計算滲透張量。
  4. The different drawbacks in the original design and construction of the emergency gate slot of the releasing tunnel of zhelin hydropower station in jiangxi province resulted in the disjunction of most slot corner plates under the parapet walls of two sides of the left hole and the damage of the second - phrase concrete in these slot corner plates, after the gate is closed and under the action of seepage water pressure

    江西省柘林水電站泄空洞檢修門槽,由於原設計和施工均存在不同的缺陷,致使閘門關閉后,在滲透水壓作用下,造成左孔兩側胸墻以下大部分門槽護角板被擠壓脫開,護角板裏面的二期混凝土損壞。
  5. The flow regime inside of the tunnel, the characteristics of hydrodynamic load, the hydrodynamic pressure feature at the gate slot and the vent air speed during the shutting of the gate is studied through model test, and then the reliability of the gate, the feature of the vent air speed and the pressure at the gate slot during the shutting of the gate are analyzed based on the test result concerned

    通過模型試驗研究了事故閘門關閉過程中泄洪洞內的水流流態、門體的水動力荷載特性以及門槽段動水壓力特性、通氣孔風速,並根據試驗結果分析了該閘門動水下門過程中的可靠性,通氣孔風速特性和門槽段壓力特性。
分享友人