work load test 中文意思是什麼

work load test 解釋
運動負荷實驗
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. The test must work in a specify rotation spectrum, temperature spectrum and load spectrum to analogize the reality condition

    實驗器要在一定的載荷譜、溫度譜、轉速譜條件下工作,模擬軸承的實際工況。
  2. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  3. The main purpose of this paper is to study crack growth rate of a class of nonlinear viscoelastic materials under the condition of constant load and small - strain. in this paper : the new test program is raised by referencing the existing test programs and by our trial and error ; in the new test program, facilities involved in the nonlinear viscoelastic crack tests are relatively few, the test process is relatively simple and the data obtained from the experiments are credible. on this basic, the calculation of j integral of nonlinear viscoelastic double cantilever beams specimens and the parameter of fracture work of corresponding nonlinear viscoelasticity are derived

    具體成果包括: 1 、證實了雙懸臂梁試件用於非線性粘彈性裂紋擴展實驗研究的優點:雙懸臂梁試件在實驗中能觀測到的擴展過程持續時間比較長,在計算j積分時,計算方法簡單; 2 、得到了改性聚丙烯材料用於非線性粘彈性裂紋擴展實驗的兩種有效的試件構形和相應的試件尺寸;採用不斷改善夾具的方法使得加載穩定; 3 、經過連續四個多月的時間得到了一組有用的實驗數據; 4 、得到了裂紋長度與時間的關系、裂紋擴展速度與時間的關系、裂紋擴展速度與裂紋長度的關系。
  4. Dynamic test has been performed on three strengthened girders after they were being put into service. according to the measured data from the dynamic test and the calculated results of the proportion of the load distribution on steel diagonal braces and steel crane girders as well as the increased carrying capacity after strengthening in consideration of the principle of cooperative work between braces and crane girders, the feasibility, rationality, and economy of this strengthening scheme have been verified. this scheme can be applied extensively to strengthen crane girders system including concrete crane girders system hereafter

    最後結合對已經加固施工並投產使用的3榀鋼吊車梁的現場實際動測結果,按考慮下部鋼斜撐與鋼吊車梁二者協同工作的原理對鋼吊車梁與下部斜撐之間的荷載分配比例以及加固后鋼吊車梁的承載能力進行了進一步的計算驗證和對比分析,論證了採用鋼斜撐方案加固已有鋼吊車梁的合理與有效性。
  5. The specimen of the test was stimulated by viscoelastic model and the wheel load was stimulated by special function, which are brought into viscoelastic equation. after solving the equation, we can work out the theoretical answer. thus we can figure out the ds and the deformation curve

    本文應用粘彈性理論研究車轍試驗,應用粘彈性模型模擬車轍試驗的試件,擬合車轍試驗的輪載,帶入粘彈性本構方程,獲得理論解,從而獲得車轍試驗的變形曲線和動穩定度值。
  6. The load control system has already passed the test ' s validate. it shows that the design of whole system is correct. the system can truly simulate the real air - stream and put it on missile ' s wings to make them work on the same force situation as in the real spread process, so the relationship of explosive stuff and attack angle can be confirmed

    本文所設計的加載控制系統已通過實際系統的驗證,說明整個系統的設計是合理正確的,它能夠真實地模擬類似真實氣流阻力的載荷,並施加於彈翼或尾翼,模擬其在真實工作環境下的受力狀態,可以測算導彈攻角與火工品填藥量的關系。
  7. Via the practical engineering of improving the soft foundation with the low intensity piles composite foundation the field test study is done. these work is done : ( 1 ) the method of improving the soft foundation of the bridge approach with the low intensity piles composite foundation is summarized ; ( 2 ) the field test method of improving the soft foundation of the bridge approach with the low intensity piles composite foundation is summarized ; ( 3 ) the strain character of the low intensity piles composite foundation under the embankment load is studied ; ( 4 ) the stress character of the low intensity piles composite foundation under the embankment load is studied and the differences of the pile - soil stress ration and what make them is discussed ; ( 5 ) the calculating mode of bearing capacity of low intensity piles composite foundation is discussed

    本文藉助于低強度樁復合地基處理橋頭深厚軟基的實際工程,對低強度樁復合地基加固橋頭軟基進行了試驗研究,做了以下工作: ( 1 )對低強度樁復合地基加固高等級公路軟基的方法進行了總結; ( 2 )對低強度樁復合地基加固軟基的試驗方法進行了總結; ( 3 )研究了低強度樁復合地基在堆載作用下的變形性狀; ( 4 )研究了低強度樁復合地基在堆載作用下的應力場特徵,並對不同性質荷載作用下低強度樁復合地基樁土應力比進行了比較,分析了存在差異的原因原因; ( 5 )對低強度樁復合地基承載力的計算方法進行了探討。
  8. Base on these studies, we implement a performance test for the load balancing schemes. at the end of the paper, summary and successive work are given

    在此基礎上選擇測試工具,進行了web服務器集群系統的負載平衡策略的性能分析和測試,最後是對工作的總結並提出以後的研究方向。
  9. The load test for bridge no. str18 foreground has been completed while work continues on the construction of the abutments pier for bridge no. str19 background

    鄰近於長沙橋編號str18的樁柱負載測試經已完成前景觀與及繼續進行橋編號str19的橋墩和中間橋墩的工程後景觀
分享友人