填築面積 的英文怎麼說

中文拼音 [tiánmiàn]
填築面積 英文
reclaimed area
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • 面積 : [數學] area
  1. Hotel, located in the city center, was opened from the auguest of 1998. itis build up by filling in the sea, so surrounded by sea on three sides, and the mountain on one side. to the east is the international convertion and exhibition center

    酒店東側為國際會展中心,與國際會展館共海114畝,酒店建39000平方米,由新加坡東升置業有限公司與煙臺虹口餐旅業集團共同投資興建。
  2. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    公路沿線廣泛分佈有昔格達地層,昔格達地層能否用作高速公路路基料,國內沒有先例,本論文就是結合導師的科研項目,在非典期間,現場長達5個月的工作,完成了從試驗、現場施工工藝到路堤分層沉降監測等工作,是對生產實際,認識昔格達地層的性質和其作為地基、路基和料應用中臨的問題進行的研究。主要的研究內容有:對攀西地區地層巖性、構造等地質環境和昔格達地層的沉歷史過程作了系統的分析,研究表明西攀高速公路主要受安寧河斷裂和昔格達斷裂影響,通過地區地震活動頻繁,差異沉降較大,對公路建設、安全運行和沿線構物設計有較大影響;由於昔格達地層在有些路段作為地基、有些作為路基,對其基本性質進行了研究:包括天然密度、含水量、塑液限、顆粒級配等指標的試驗研究。研究成果表明:昔格達地層為湖相沉,主要為砂巖和泥巖,它以細粒組為主,同時粘粒的存在,使其具有一定粘性。
  3. Based on the gross floor area of hunghom peninsula ( including the shopping arcade, residential buildings and carpark ), it is roughly estimated that approximately 200, 000 tonnes of construction materials are involved. if these materials are disposed of in landfills, the handling costs will be about $ 25 million

    以整個紅灣半島(包括商場、住宅樓宇和停車場)的樓粗略計算,所涉及的建物料約為二十萬公噸,如果以堆方法處理這個數量的物料,則約需二千五百萬元。
  4. The plan encompasses the same gross floor area as currently proposed for the central government offices and legislative council, as well as for the commercial developments on the central extension outline zoning plan. it also includes many green open spaces, a central wanchai bypass and it accepts the current reclamation as given

    計劃中,政府總部立法會大樓,與及中區擴展部分分區計劃的商業發展,均採用與政府建議相同的建,亦包括不少綠化的戶外空間及中環灣仔繞道,為現正進行的海工程予以認同。
分享友人