拱底 的英文怎麼說
中文拼音 [gǒngde]
拱底
英文
intrados-
Bases which carry horizontal load, for example under arches, are usually called abutments.
承受水平荷載的底座,例如拱底下的底座,一般稱為拱座。The palace was a little less than it sounded, a narrow palladian facade, mossy steps, a dark archway of rusticated stone.
那些大廈比傳聞的小些,帕拉底奧式的門面很狹窄,石階上長滿苔蘚,陰暗的拱廓用粗琢的石頭建成。On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries
在此基礎上論文詳細歸納了以相對沉降為依據確定單位面積端承力q _ b的計算方法,並考慮擴底樁的「拱效應」特點引入了有效樁長的概念,最後結合公路規范推出了比較實用的人工挖孔擴底樁軸向承載力計算公式。論文運用了marc程序對地基土的應力和位移進行了有限元數值計算分析,得到了地基土的應力和位移場的變化曲線和在加載過程中樁側土摩阻力和樁端反力各自所承擔的比例;本文還在總結各國挖孔擴底樁應用情況的基礎上就擴底樁的構造進行了詳細的歸納。It was an obstinate pair of shoulders; they could not seem to learn the trick of stooping with any sort of deceptive naturalness.
無奈那隻肩膀兒一拗到底,怎麼學那種拱肩縮背的樣子,看上去都有點兒不大自然。In this essay a kind of auxiliary energy dissipator arplying to underflow energy dissipation of low froude number is developed. it mainly applies to the small - sized projects, especially to the canal system structures
本文研究了一種適用於低佛氏數底流消能的輔助消能工? ?拱形網板(簡稱拱網) ,它特別適合於小型工程尤其是渠系建築物。Driving before it a loose drift of rubble, fanshoals of fishes, silly shells. a corpse rising saltwhite from the undertow, bobbing landward, a pace a pace a porpoise
自得像鹽一樣的屍體從退浪底下浮上來,又一拱一拱的,像海豚似地漂向岸去。( 7 ) the destroyed area came into being in the condition of supports, such as tensile at vault and floor, shearing at nance and corner of wall
而且,錨桿支護對圍巖變形有較好的控製作用, 3 . 5m長錨桿可使拱頂下沉下降40左右,底板隆起下降34 。But the base of tunnel is not regarded in tunnel design, which cause tunnel disease
我國鐵路隧道設計中普遍存在「重拱輕底」的思想,由於基底結構薄弱而引起的隧道病害問題嚴重。Arch net floor has opened up a new way for the small - sized works, expecially for the canal system structures of low frouda number underflow energy dissipation
拱網為小型工程特別是渠系建築物低佛氏數底流消能開辟了一條新途徑。Experimental research on uplift force acted on a piece of floor of arch invert water cushion pool and estimation to limit thrust load at skewbacks
反拱水墊塘底板塊上舉力變化規律的試驗研究( 2 ) according to the forming model of the deep pull cracks, they can be divided into three classes pulled cracks -, pressed cracks and sheared cracks. ( 3 ) based on the two - dimensional and three - dimensional finite element methods. the following results can be affirmed : in the slope excavating process, the base surface will rebound in the direction of the excavating surface ' s excerior normal. the maximal displacements of the left and right bank are + 3. 6cm and + 2. 4cm ; the arch abutment will rebound in the direction of the river valley, the maximal displacements of the two bank are + 3. 5cm and + 2. 2cm ; the upstream and downstream surface will rebound in the direction of the normal direction. the maximal displacements are + 2. 1cm and + 1. 7cm. ( 4 ) the natural slope is stable
( 3 )通過二維及三維有限元分析得知,左右岸拱肩槽邊坡在開挖過程中,開挖底面主要表現為朝開挖面外法線方向發生回彈,左右岸最大位移量分別為+ 3 . 6cm 、 + 2 . 4cm ;拱端面主要表現為向河谷方向發生側向回彈,左右岸最大位移量分別為+ 3 . 5cm 、 + 2 . 2cm ;上下游坡面主要表現為向臨空方向的回彈,左右岸最大位移量分別為+ 2 . 1cm 、 + 1 . 7cm ;開挖使巖體產生由卸荷回彈導致的傾倒拉裂現象。A hundred maidens who came to my cold stone door, thinking they would live to serve me in some palace of arching caverns underearth
一百個少女來到我的石門前,想著她們的餘生都要在地底的拱形石頭宮殿中服侍我。With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places
摘要採用鐵路工程抗震設計規范、動三軸試驗及有效應力的理論分析相結合的方法,對南京地鐵南北線( 1號線)區間隧道開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當隧道底板坐落在5層且5層較厚時的液化區出現在隧道襯砌底板處;局部地段液化區出現在隧道頂部及拱腰;大部分地段的液化區出現在隧道頂板上方。The paper mentions the design of three - dimensional graphics modeling in the mine such as shaft, laneway, and equipment of transport and mining. human - computer interaction and viewpoint rambling in the demo system are realized so that the simulating staff may look at circumstances from different viewpoint and positions. under the precondition of limited resources holding, the contradiction between the fidelity of image display and real - time feature of system interaction process is better resolved with using of display list and model culling technology
論文中採用了opengl圖形庫的基本繪圖函數進行三維圖形的模型設計,並詳細給出了立井、拱形巷道、梯形巷道以及工作面支架和井底運輸巷道設備的三維圖形設計方法;並著重分析人機交互與視點漫遊功能的技術在系統中的實現;在佔用有限資源的前提下,為了提高場景實時顯示速度,論文中採用顯示列表和模型淘汰等技術,並編制出了一個虛擬礦井實例。Research on characteristics of hydrodynamic pressure of the slabs of ring in arch invert cushion pool
反拱水墊塘拱圈底板動水壓強變化規律的研究A few paces off is an enormous pillar, and another ? seven in all down the length of the hall, supporing in the centre line the springing arches of the double groining
幾步開外有根高大的柱子,接著又一根,再接著又是一根;大廳縱深一共豎著七根大柱,支撐著雙拱屋頂落在橫向正中的拱底石。Its displacement could reduced to 40 percents at vault and 34 percents at floor in the condition of support, especially in the condition of cable support
在拱頂和底板以張性破壞為主,而在拱腰和墻腳以剪切破壞為主。噴層對圍巖塑性破壞的限製作用顯著。The principal stress value arised alteration, the magnitude of stress closed to 25 ~ 32mpa, its influence scope was within the scope outside of tunnel opening 10 ~ 15 meter, maximum tense focused at vault and middle of floor about half meter. shearing stress focused at corner of vault and wall, always been sheared
主應力量值也發生了較大改變,壓應力可達25 32mpa ,其影響范圍在隧道邊墻外10 15m ;拉應力集中在拱頂和底板中部約0 . 5m范圍內,最大可達10mpa ;在拱腰和墻腳常為剪應力集中區,易發生塑性剪切破壞。With the increase of lateral pressure modulus, the magnitude of principal stress decreases and the direction of it is hardly changeable ; with the increase of the angle between the direction of the maximal horizontal principal stress on magnitude and the fault bearing, the magnitude of principal stress increase and its direction can hardly change ; with the increase of the elastic modulus of rocks, the magnitude of principal stress increases and the direction changes more ; with the increase of pr, the magnitude of principal stress decreases and the direction changes more ; with the increase of lateral pressure modulus, the principal stress at hance, the tress at topmost arch, bottom arch and principal stress at lateral arch decreases, with the increase of the depth of tunnel, the stress of surrounding rock also increases, and the poorer the quality of surrounding rock is, the little its principle stress is
分析得出,隨著側壓力系數的增大,主應力量值減小,主應力方位難改變;隨著與斷層走向的夾角增大,主應力量值增大,應力方向難改變:隨著巖石的彈性模量的增大,主應力量值增大,方向變化越大;隨著泊松比的增大,主應力量值減小,方位變化越大。隨著側壓力系數的增大,頂、底拱處的各應力值增大,拱腰處的主應力減小,剪應力增大,側拱處的各主應力減小,同一側壓力系數的條件下圍巖質量越差,各應力值也越小;隨著洞室埋深的增加,圍巖壓力也增大,圍巖質量越差,其應力值也減小。It is 19. 5 meters high and 15. 6 meters around at the base. built entirely of wood, the vault is supported by eight pillars. the roof has no beams but only a great number of brackets entwined within each other
它高19 . 5米,底部直徑15 . 6米,全木結構,殿頂由8根立柱支撐,頂無橫梁,由眾多斗拱上疊,天花板層層收縮,構成美麗的穹窿式藻井。分享友人