拱心 的英文怎麼說

中文拼音 [gǒngxīn]
拱心 英文
[建築] arch-core
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  1. The calculation modes of the coefficient of shrinkage and creep of the bulgy core concrete in steel tube are discussed. based on a few reasonable hypotheses and the stress - strain relation of concrete acquired by the " adjusting valid modulus depending on load time " method, a compact formula is reasoned out, which is applied to calculate the equivalent elastic modulus of the bulgy core concrete considering the affection of shrinkage and creep. so, the analysis of the affection on cfst arch bridge by shrinkage and creep can be progressed by pole - girder fem, further more, the analysis precision is quite high

    本文還對核膨脹混凝土特殊的收縮、徐變系數計算模式展開了探討,在合理的假設前提下,採用「齡期調整的有效模量法」得到的混凝土的本構關系,推導出鋼管內核混凝土在考慮徐變影響后的等效彈性模量計算公式,並以此為基礎採用桿系有限元方法來對鋼管混凝土橋進行較高精度的收縮徐變分析。
  2. With circumspection, as invariably when entering an abode his own or not his own : with solicitude, the snakespiral springs of the mattress being old, the brass quoits and pendent viper radii loose and tremulous under stress and strain : prudently, as entering a lair or ambush of lust or adder : lightly, the less to disturb : reverently, the bed of conception and of birth, of consummation of marriage and of breach of marriage, of sleep and of death

    謹慎地,就像每一次進入一座房子他自己的或並非他自己的的時候那樣,小翼翼地,因為床墊子那蛇狀螺旋彈簧已經陳舊了,黃銅環和蝰蛇狀形擋頭也鬆鬆垮垮的,一用力過頭就顫悠顧慮周到地,就好像進入肉慾或毒蛇的巢穴或隱身之處似的輕輕地,省得驚動她虔誠地,因為那是妊娠與分娩之床,合巹與失貞之床,睡眠與死亡之床。
  3. He was more interested in states of mind than in "puerile superstitions, gothic castles, and chimeras. "

    他樂于描寫情,而不願意描寫「無聊的迷信,尖式的堡壘和妖魔鬼怪。」
  4. To leibnitz it was " unconscious counting " a species of mathematics ; to john ruskin " frozen architecture " ; but to musicians it was, until only very recently, " singing. " sound was simply the physical medium, the carrier of the increasingly expanding structures which based themselves primarily on the model of the vocal phrase and its psychology, and projected its human aspirations in clearly shaped, arching melodic lines with or without verbal association

    對leibnitz (雷布尼茲) ,它是"不自覺地數"一種數學;對johnruskin "凍結建築" ;但對音樂家,它本是, (直到最近才改變) , "唱" .聲音只是單純的物體媒介;攜帶著,基於唱句及其理模式擴增的結構,投射人的氣,以清楚的形旋律,可或有或無詞句
  5. This thesis takes a typical project - - the natatorium of the sports center, xuzhou normal university - - as a case to study the theory and practice of the design and the construction of the variant steel arched girder

    本文以典型的工程? ?徐州師范大學體育中游泳館為實例,從理論和實踐上研究了變異鋼架結構的設計和施工。
  6. He was more interested in states of mind than in " puerile superstitions, gothic castles, and chimeras.

    他樂于描寫情,而不願意描寫「無聊的迷信,尖式的堡壘和妖魔鬼怪。 」
  7. 2 ) the structure elements should be laid out symmetrically and uniformly when designing steeve - arch structure, what ' s more, the reasonable selection of section geometric size near the arch foots of first beams is paid attention to and the arrangement difficulties of steel bar due to the big eccentric pressures 2, the analyses of anti - seismic features on transverse direction of the aqueduct l ) the method of adjusting the elements " mass can be harnessed in order to even the layout of seismic loads

    2 )設計吊桿式架支承結構時,各部分構件應當均勻對稱布置。另外,還應注意頭道梁腳附近截面的尺寸擬定,克服地震內力造成的大偏受壓狀態給結構配筋設計增加的困難。 2 、橫槽向抗震性能分析1 )可利用調整構件質量的方法,使得結構的某些構件的地震荷載分佈均勻一些。
  8. Aerospace series ; rivets, solid, 100 normal countersunk head with dome, in aluminium alloy 2117, anodised or chromated, inch based series ; german version en 2552 : 1992

    航空航天.英寸系列2117a鋁合金頂100普通沉頭實
  9. The building mass is structured by a setback in the fa ? ade as well as large scale slits, which cut horizontally at the arcade ' s side entrances and vertically at the tower entrances

    大尺度切入建築的單體元素(水平方向為購物中旁門的連廊,垂直方向則為高塔入口)與立面的退進強調了建築的形態結構。
  10. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出壩體的冠梁剖面和壩體中縱剖面的溫度等值線圖、冠梁剖面和壩體上下游面應力等值線圖、壩肩最大最小應力沿壩高的分佈曲線、不同高程處典型點的最大最小應力值表以及不同高程處最大最小應力值表等成果,為碾壓混凝土壩的設計和施工中採取相應的溫控措施提供了參考依據。
  11. On the contents of two sides abovementined, this paper attempts to do some initial researches from three angles as follows : 1, the analyses of anti - seismic features on longitudinal direction of the aqueduct l ) the seismic longitudinal effects are small. the vibrant characters are decided from the structure integration and rigidness of piers and main arch - ring of the aqueduct, so the following measures should be taken in order to weaken and isolate seismic influence : properly broadening the section sizes and adopting the high class concrete, lowering the height and barycenter of building, setting hoop steel bars so as to increase the plasticity of the concrete which can absorb the seismic energy and prevent the damages due to stress centralization on the linkages and changing place

    本文試圖就上述的這兩大方面的內容,從以下三個角度進行了初步研究: 1 、縱槽向抗震性能分析1 )湯峪河吊桿支承結構的縱槽向地震效應較小;吊桿式架結構動力特性取決于槽墩和主圈的剛度,以及結構的整體性,故適當加大構件截面尺寸或提高砼標號,盡量降低結構的建築高度和重,在構件連接和變截面處增設梗脅,按照約束混凝土的要求來加強箍筋的配置,增加砼的延性,以克服地震時構件連接和變截面處的應力集中造成的坡壞,並吸收大量的地震能量,從而起到隔震,減震的效果。
  12. Tensile stress field would appear in the proximity of arched vault after excavation, slacking of surrounding rock and subsequent dropping of blocks of rock from such area would possibly occur at any time in the context of extra - shallow depth. so i - steel arched support must be erected to provide against possible block dropping and be integrated into a ring with that of pilot tunnels on both sides

    頂在核土開挖后,在一定范圍內出現拉應力區,在超淺埋情況下極容易掉塊和發生圍巖松馳,因此核土必須邊開挖邊架設工字鋼架,使之與左右導洞頂工字鋼形成整體。
  13. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了冠梁剖面和壩體中縱剖面準穩定溫度場等值線圖以及施工期、運行期冠梁剖面和壩體中縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。
  14. Jalways remember the tow tall fit trees bu the arch bridge in our campus and wonder if the first leaf of chinese parasol falls down to my head, my shoulder, my hands and my heart

    總是惦記著校園雙橋邊那兩棵高高的無花果樹,總是擔那秋日的第一葉梧桐會落在我的頭上、肩上、手上和上。
  15. Arcade in the hotel, underground shopping arcade ( gangnam station )

    賓館內廊,江南站購物中
  16. Confirm a seat number : here special remind is, still must call to determine a seat number to airline before setting out 3 days ago, otherwise your seat number is probable because never affirm, and be cancelled automatically by airline, travelling especially busy season, more want tread lightly, just won ' t " carelessness breaks jing zhou ", will good grab easiness seat number not easily, submissively lets a person

    確認機位:在此非凡提醒的一點是,出發前三天前還須打電話至航空公司確定機位,否則你的機位很可能因為不曾確認,而被航空公司自動取消,尤其在旅遊旺季,更要小處理,才不會大意失荊州,將好不輕易搶來的機位,手讓人。
  17. The ashen stone pillars, abandoned by the sea as it receded hundreds of millions of years ago, bunch together into a geological ticket. the journey to the forest is as beautiful as the landscape that surround it

    石林遠遠望去,有些矗立如林,有些峻拔如墻,有些抱如門,有些倒懸欲墜,使人驚動魄,嘆為觀止。
  18. Aesthetic appearance is one of the most important criteria used by consumers in judging clothing wear performance. bagging is a kind of three - dimensional residual deformation that deteriorates garment appearance during wear and caused dissatisfaction. to understand the psychophysical mechanisms of fabric bagging perception, a method of subjectively evaluating this behavior is developed by using a series of photographs taken from bagged fabric samples. both ranking and rating scales are used as the psychological scales. the two scales are highly correlated with each other, but the rating scale provides more information than the ranking scales and can indicate perceived differences between fabrics. a linear relationship between subjective perceptions and measured residual bagging height shows that perception of fabric bagging follows stevens ? power law. residual bagging height contributes up to 94 % of the total variance in the perception of fabric bagging. the rest of the variation may be attributed to anistropic behavior during the bagging process

    美觀是消費者日常服裝穿著功能中最重要的指標之一.起是一種外衣穿著中引起變化,令人不滿的三維殘余變形.一種主觀評價方法是從一系列起織物的照片來理解理物理學規律,採用優劣排序等級和優劣評判等級兩種方法用於理評價標度.這兩種等級互相間緊密相關,但評判等級比排序等級包含更多的信息,可以更好地區分出兩種織物間的差異.主觀評價結果與測量得到的殘余起高度之間線性相關,表明了織物起特性符合斯特藩指數定律.殘余起高度對織物起特性總方差的貢獻在94 %以上.其它可能是起時各向異性因素引起的
  19. According to the geometrical characteristic of the arch dam shape, and based on the parameter design language of ansys software ( apdl ), the subp method and the stochastic search method are adopted together to optimize design of hyperbolic arch dam with variable thicknesses of the circle

    摘要根據壩體形的幾何特徵,基於ansys軟體的參數化設計語言( apdl ) ,將零階近似方法和隨機搜索法結合起來對單圓變厚度雙曲壩進行了優化設計。
  20. The shenzhen rainbow bridge is near to the northern railway station, which has big cut bag to span over twenty - nine tracks. arch bridge structure, which has a widely application these years, is taken considering of the bridge height limitation and the site used in downtown. the girder of the bridge is constructed with composite structure of steel and folding concrete slab

    深圳市彩虹大橋地處深圳火車北站,需跨越29股火車軌道,跨徑大,又處於市中,對橋梁的梁高有所限制,經研究分析,採用近年來廣泛應用的鋼管混凝土橋橋型,梁體採用鋼- -混凝土疊合板組合梁組合結構。
分享友人