斜跨 的英文怎麼說

中文拼音 [xiékuà]
斜跨 英文
aslant
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : 動詞1 (抬起一隻腳向前或向左右邁) step; stride 2 (兩腿分在物體的兩邊坐著或立著) bestride; stra...
  1. ; 1. the trend of the development of burden and light hanging basket in the cantalever construction of continuous rigid frame bridge has been prospected, the roof truss and cable - state composite hanging basket also has been designed by analyzing and comparing with other ones. 2

    對大度橋梁懸臂澆築施工的各種形式掛籃施工工藝進行了比較和總結,對連續剛構橋懸臂澆築掛籃施工中重載輕型的發展趨勢進行了展望,提出了一種用於解決重載輕型懸臂澆築施工的新型桁架拉式組合掛籃,並進行了可行性分析計算和設計。
  2. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫拉渡槽工程(全267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  3. The studies of this paper is a beneficial porker to the cable - stayed bridges with long span, which will bring about a good social or economic benefit

    本課題研究與實橋應用,對大拉橋施工監測監控做出了有益的探索,取得了較好的社會經濟效益。
  4. The stonecutters bridge, planned as a cable - stayed structure, will have a span of about

    昂船洲大橋屬拉橋式設計,距約為
  5. The cablestayed bridges may penetrate the complete range of span now dominated by suspension bridges.

    這種拉橋可以進入目前懸索橋占統治地位的徑范圍。
  6. From the cloud valley temple 890m. above sea level in the yellow mountains to the white goose ridge at the east end of north sea there runs a passenger telpher with a hypotenuse of 2803. 96m

    從黃山的雲谷寺海拔890米到位北海東端的白鵝嶺之間橫著一條長2803 . 96米,落差772 . 80米的電動纜車。
  7. Based on tests of nine 1 / 2 - scaled model slabs under vertical loads, the paper analyzed load - deformation curve and proposed limit value of height - width ratio under axial loads. 2. based on aseismic tests, the paper put forward a model of concrete frame, silica brick and a combination of the two, proposed that the silica brick works as a 45 compression bar, analyzed the factors which may influence bearing capacity of the slab and advised a formula including the numbers of bays and of storeys of the frame

    通過對墻板模型的抗震性能試驗研究,建立了由鋼筋混凝土框格、砌塊以及兩者協同作用三個部分組成的承載力極限狀態下的理論簡化計算模型;提出了墻板中填充塊等效壓桿寬度按45度計算的統一量化標準;分析了影響墻板承載力的主要影響因素,給出了表達墻板框格層數和數不同的截面承載力實用設計計算公式。
  8. Measurement of the static and dynamic characteristics of the cable stayed pipe bridge over the nanguang river

    南廣河拉索越管橋動靜特性測試研究
  9. During cantilever construction of large span cable - stayed bridge steel box girder, the local relative deformation of steel box girder is obviously different between girder to be suspended and girder supporting crane

    摘要大拉橋主梁懸臂拼裝匹配過程中,吊機作用梁段和被起吊梁段由於受力不同,相對變形存在較大差異。
  10. Dynamic characteristics of long - span cable - stayed bridges using carbon fiber composite cable

    應用碳纖維索的大拉橋結構振動特性
  11. This paper is concentrated on the space geometric non - linear static analysis and vibration analysis of the long span plate - truss composite cable - stayed bridges. 1

    本文是針對大徑板桁結合拉橋的空間幾何非線性靜力分析及結構的動力分析兩個方面而展開研究工作的。
  12. A space geometric non - linear static finite element analysis program about the long span plate - truss composite cable - stayed bridges is presented. not only it can be used to solve the space static analysis about the state of the dead load configuration ( geometry and internal forces ), but also it can be used to analyze the internal forces and deformations of the whole construction course

    基於以上理論,並結合拉橋的施工過程,編制了大拉橋的空間幾何非線性靜力分析程序,既可用於拉橋成橋狀態的空間靜力分析,也可結合拉橋的具體施工過程,進行施工過程中的內力與變形狀態的跟蹤分析。
  13. Some key issues in the modeling of a long span composite cable - stayed bridge are discussed such as cable tension, dead load, large deflection, concrete deck stiffness, concrete deck - steel girder connection, and boundary condition. some conclusion can drawn from the thesis : 1. the initial equilibrium configuration of the bridge is clarified in the thesis

    本文深入討論大度結合梁拉橋"基準"有限元模型建立過程中的幾個關鍵問題並得到一些有意義的結論: 1 .明確拉橋在索初應力和恆載作用下的初始平衡構型? ?處于初始平衡狀態時的幾何位置,給出了其計算方法。
  14. The linear elastic slope deflection equations of gable portal frames when occur the side - sway and non - sway buckling are derived. the equations considere the rafter slope and the vertical uniform loading subjected on the rafter. the established equations of non - sway buckling can consider the effect of snap change effect of gable frame

    推導了山形門式剛架有側移失穩和無側移失穩的線彈性位移方程,方程考慮了梁傾角和樑上豎向均布荷載的影響;建立了能考慮山形門式剛架變效應的無側移失穩位移方程。
  15. The works mainly comprise the demolition of an existing stepped ramp of a footbridge nf85 ; construction of a lift shaft and link slab to connect to the existing footbridge ; improvement works to an existing bus lay - by adjacent to the footbridge ; and associated road, drainage and landscape works

    工程主要包括在橫青山公路近水邊圍的現有行人天橋nf85拆除現有臺階道興建升降機槽及連接臺以連接該現有行人天橋改善近該行人天橋的巴士站及相關的道路排水系統和環境美化工程。
  16. Dynamic characteristics of cable - stayed pipe bridge on fujiang while pigging

    涪江拉管橋清管時動態力學特性
  17. As a result of increasing bridge span, deck flexibility and structure complexity, earthquake analysis of long span cable - stayed bridge becomes one of the most concern and challenge problems in bridge engineering field

    隨著橋梁度、橋面柔性和構造復雜性的增加,大拉橋的地震動研究已經成為橋梁工程界最關心、最具有挑戰性的課題之一。
  18. Return goes to your left. you ' re on time, closer to your center line. crosscourt. or you ' re late, stretched out, reaching. down - the - line

    回球回到你的左側.你及時趕到,靠近球場中間,線.如果晚了,要夠球,直線球
  19. Practice of crossing mining through seam solpe joint old roadway with digit - shape combined way

    數形結合法采穿層交老巷實踐
  20. Based on an actual project, feng - shou - qu project in honghu city, hubei province, which is one of the biggest csbcs all over the country with a radius of 3

    湖北洪沙線豐收渠橋涵工程主體由一半徑3 . 30m 、斜跨9 . 334m與公路縱軸成45角的小橋組成,是全國波紋鋼板小橋中徑最大的一座橋涵。
分享友人